Difference between revisions of "Micro Hydro Power (MHP) Haeusleberg Farm"

From energypedia
***** (***** | *****)
***** (***** | *****)
Line 26: Line 26:
 
{| class="FCK__ShowTableBorders" cellspacing="1" cellpadding="1" width="100%" border="0"
 
{| class="FCK__ShowTableBorders" cellspacing="1" cellpadding="1" width="100%" border="0"
 
|-
 
|-
| [[File:Haeusleberg farm.jpg|370px|frame|A view over the Häusleberg organic farm]]<br/>
+
| [[File:Haeusleberg farm.jpg|370px|A view over the Häusleberg organic farm]]<br/>
| <br/>
+
| [[File:Haeusleberg turbine 1.jpg|370px|Side view of the installed turbine]]<br/>
 
|-
 
|-
| Blah, blah
+
| A view over the Häusleberg organic farm.
| Gobecho I powerhouse
+
| Side view of the installed turbine atop the wooden framed drainage barrel.
 
|-
 
|-
| <br/>
+
| [[File:Haeusleberg turbine 2.jpg|370px|Top view of the installed turbine]]<br/>
| <br/>
+
| [[File:Haeusleberg turbine 3.jpg|370px|The turbine from below]]<br/>
 
|-
 
|-
| Gobecho I weir and intake
+
| Top view of the installed turbine atop the wooden framed drainage barrel.
| Gobecho I turbine
+
| The turbine from below showing the pelton runner at the nozzle mounting bracket.
 
|-
 
|-
| <br/>
+
| [[File:Haeusleberg turbine 4.jpg|370px|The stator]]<br/>
| <br/>
+
| [[File:Haeusleberg turbine 5.jpg|370px|Nozzle alignment test]]<br/>
 
|-
 
|-
| During Gobecho I testing
+
| The stator of the direct drive motor during modifications for the 12 V hybrid system.
| Gobecho I
+
| Nozzle alignment test.
|-
 
| <br/>
 
| <br/>
 
|-
 
| People enjoying the benefits of electricity supplied by the MHP
 
| Gobecho I grid
 
 
|}
 
|}
  
 
[[Category:Germany]]
 
[[Category:Germany]]
 
[[Category:Micro_Hydro]]
 
[[Category:Micro_Hydro]]

Revision as of 22:03, 11 December 2012

Location of the site:

  • Country: Germany
  • DistrictBaden-Württemberg
  • River: Schanzbach
  • GPS Coordinates: 47º55’40.5’’N 7º55’31.2’’E


This small pelton turbine is part of a hybrid system which supplies electricity to the Häusleberg Organic Farm. For more information please go to the project website:

https://sites.google.com/site/haeusleberg/


Start of construction: December 2011
Date of Commissioning: June 2012

 

Ownership / Operation Model: Privately owned

Tariff structure: Not applicable


Turbine: Pelton

Generator: Modified direct drive motor, 3 phase, 20 V, 150 W (approximately)

A view over the Häusleberg organic farm
Side view of the installed turbine
A view over the Häusleberg organic farm. Side view of the installed turbine atop the wooden framed drainage barrel.
Top view of the installed turbine
The turbine from below
Top view of the installed turbine atop the wooden framed drainage barrel. The turbine from below showing the pelton runner at the nozzle mounting bracket.
The stator
Nozzle alignment test
The stator of the direct drive motor during modifications for the 12 V hybrid system. Nozzle alignment test.