Difference between revisions of "Micro Hydro Power (MHP) Haeusleberg Farm"
From energypedia
***** (***** | *****) |
***** (***** | *****) |
||
Line 26: | Line 26: | ||
{| class="FCK__ShowTableBorders" cellspacing="1" cellpadding="1" width="100%" border="0" | {| class="FCK__ShowTableBorders" cellspacing="1" cellpadding="1" width="100%" border="0" | ||
|- | |- | ||
− | | [[File:Haeusleberg farm.jpg|370px | + | | [[File:Haeusleberg farm.jpg|370px|A view over the Häusleberg organic farm]]<br/> |
− | | <br/> | + | | [[File:Haeusleberg turbine 1.jpg|370px|Side view of the installed turbine]]<br/> |
|- | |- | ||
− | | | + | | A view over the Häusleberg organic farm. |
− | | | + | | Side view of the installed turbine atop the wooden framed drainage barrel. |
|- | |- | ||
− | | <br/> | + | | [[File:Haeusleberg turbine 2.jpg|370px|Top view of the installed turbine]]<br/> |
− | | <br/> | + | | [[File:Haeusleberg turbine 3.jpg|370px|The turbine from below]]<br/> |
|- | |- | ||
− | | | + | | Top view of the installed turbine atop the wooden framed drainage barrel. |
− | | | + | | The turbine from below showing the pelton runner at the nozzle mounting bracket. |
|- | |- | ||
− | | <br/> | + | | [[File:Haeusleberg turbine 4.jpg|370px|The stator]]<br/> |
− | | <br/> | + | | [[File:Haeusleberg turbine 5.jpg|370px|Nozzle alignment test]]<br/> |
|- | |- | ||
− | | | + | | The stator of the direct drive motor during modifications for the 12 V hybrid system. |
− | + | | Nozzle alignment test. | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | | | ||
|} | |} | ||
[[Category:Germany]] | [[Category:Germany]] | ||
[[Category:Micro_Hydro]] | [[Category:Micro_Hydro]] |
Revision as of 22:03, 11 December 2012
Location of the site:
- Country: Germany
- District: Baden-Württemberg
- River: Schanzbach
- GPS Coordinates: 47º55’40.5’’N 7º55’31.2’’E
This small pelton turbine is part of a hybrid system which supplies electricity to the Häusleberg Organic Farm. For more information please go to the project website:
https://sites.google.com/site/haeusleberg/
Start of construction: December 2011
Date of Commissioning: June 2012
Ownership / Operation Model: Privately owned
Tariff structure: Not applicable
Turbine: Pelton
Generator: Modified direct drive motor, 3 phase, 20 V, 150 W (approximately)