Difference between revisions of "Costs of Micro-Hydro Power Sites"
From energypedia
***** (***** | *****) m |
***** (***** | *****) |
||
Line 5: | Line 5: | ||
<br/> | <br/> | ||
+ | |||
== MHP costs in Rwanda<br/> == | == MHP costs in Rwanda<br/> == | ||
− | *in [[ | + | *in [[Results_GIZ_Kigali_MHP_meeting_2011|Rwanda in 2011 various cost categories for MHP were analysed.]] |
*A special chapter about the [[Estimation of management costs|management costs]] was developed, too. | *A special chapter about the [[Estimation of management costs|management costs]] was developed, too. | ||
− | |||
Revision as of 13:16, 25 July 2013
Overview
Micro-Hydro Power (MHP) projects come along with a big variety of costs. Planning and developing a site brings a number of country, probalby regional specific costs. Similar to that are costs for operation and maintenance. All different cost categories play a role for individual projects, while big difference between countries due to different framework conditition might occur. A clear cost analysis upfront is highy recommended.
MHP costs in Rwanda
- in Rwanda in 2011 various cost categories for MHP were analysed.
- A special chapter about the management costs was developed, too.