Difference between revisions of "Micro Hydro Power (MHP) - Ethiopia, Ererte"
From energypedia
***** (***** | *****) m |
***** (***** | *****) m |
||
Line 1: | Line 1: | ||
− | Overview = | + | |
+ | = Overview = | ||
<u>Location of the site:</u> | <u>Location of the site:</u> | ||
Line 30: | Line 31: | ||
'''Technical Specification:''' | '''Technical Specification:''' | ||
*Canal: Lined stone masonry having a length of 53m | *Canal: Lined stone masonry having a length of 53m | ||
− | *Penstock: Mild stell having a diameter of 400mm and a length of 42m/locally manufactured | + | *Penstock: Mild stell having a diameter of 400mm and a length of 42m/locally manufactured |
*Turbine: T-15 cross flow turbine /Manufactured locally | *Turbine: T-15 cross flow turbine /Manufactured locally | ||
*Generator: MARELLI-Brushless Synchronous,1500 rpm, 42 kVA, 33.6 kW, 50 Hz, Efficiency - 89%, 380/440 V(adjustable), 3 phase series STAR | *Generator: MARELLI-Brushless Synchronous,1500 rpm, 42 kVA, 33.6 kW, 50 Hz, Efficiency - 89%, 380/440 V(adjustable), 3 phase series STAR | ||
*Grid: Low Voltage distribution with ABC cable and Wooden pole (2.76 km) | *Grid: Low Voltage distribution with ABC cable and Wooden pole (2.76 km) | ||
− | + | <br/> | |
= Pictures = | = Pictures = | ||
− | {| cellspacing="1" cellpadding="1" border="0" style="width: 100% | + | {| cellspacing="1" cellpadding="1" border="0" class="FCK__ShowTableBorders" style="width: 100%" |
|- | |- | ||
| [[File:Ererti Fall.JPG|left|370px|Ererti Fall.JPG|alt=Ererti Fall.JPG]] | | [[File:Ererti Fall.JPG|left|370px|Ererti Fall.JPG|alt=Ererti Fall.JPG]] | ||
Line 54: | Line 55: | ||
|} | |} | ||
− | + | <br/> | |
= Further Information = | = Further Information = | ||
Line 62: | Line 63: | ||
<references /> | <references /> | ||
+ | [[Category:Ethiopia]] | ||
[[Category:Hydro]] | [[Category:Hydro]] | ||
− |
Revision as of 15:02, 25 July 2013
Overview
Location of the site:
- Country: Ethiopia
- District: Bona
- Kebele: Beshiro Gute
- River: Ererte
- GPS coordinate: 6º33’26.8’’N 38º40’8.4’’ E
Details
The MHP plant Ererte has a capacity of 33 kW and is planned to be inaugurated in September 2011. A total of approximately 200 households will be connected to the plant. The maximum number of potentially connectable households is 700.
Click here for more information.
Start of Construction: August 2009
Date of Commissioning:
Ownership: Robot Electric Users Cooperative/community based cooperative society
Tariff Structure: Flat rate/monthly based per appliance
Technical Specification:
- Canal: Lined stone masonry having a length of 53m
- Penstock: Mild stell having a diameter of 400mm and a length of 42m/locally manufactured
- Turbine: T-15 cross flow turbine /Manufactured locally
- Generator: MARELLI-Brushless Synchronous,1500 rpm, 42 kVA, 33.6 kW, 50 Hz, Efficiency - 89%, 380/440 V(adjustable), 3 phase series STAR
- Grid: Low Voltage distribution with ABC cable and Wooden pole (2.76 km)
Pictures
Ererte waterfall |
Ererte MHP site |
Ererte intake and canal |
Locally Manufactured T-15 Turbine |