= Introduction = | = Introduction = | ||
− | Energising Development (EnDev) Indonesia’s objective is to support sustainable access to modern energy services for rural communities in Indonesia. One key intervention is to support different rural electrification infrastructure projects under various public and private agencies in Indonesia. | + | Energising Development (EnDev) Indonesia’s objective is to support sustainable access to modern energy services for rural communities in Indonesia. One key intervention is to support different rural electrification infrastructure projects under various public and private agencies in Indonesia. |
− | |||
− | |||
By way of example, EnDev conducted a technical review and baseline data survey for over one hundred (100) 15kW solar mini-grid installations (photovoltaic village power/PV-VP) across Indonesia, installed by local suppliers under contract with Directorate General for New and Renewable Energy and Energy Conservation (DGNREEC) during 2013. Hereafter referred to as the ''DGNREEC PV-VP Technical Review 2013''. | By way of example, EnDev conducted a technical review and baseline data survey for over one hundred (100) 15kW solar mini-grid installations (photovoltaic village power/PV-VP) across Indonesia, installed by local suppliers under contract with Directorate General for New and Renewable Energy and Energy Conservation (DGNREEC) during 2013. Hereafter referred to as the ''DGNREEC PV-VP Technical Review 2013''. | ||
− | |||
− | |||
Specialist technical inspection teams, comprising one (1) experienced technician and one (1) assistant, were recruited for this programme to conduct 2-day site visits, complete pre-pared checklists and questionnaires and train the beneficiary communities on system operation, maintenance and administration. Findings of these inspections were summarised and submitted to DGNREEC for subsequent follow-up with contractors. In addition, baseline data (through the EnDev Key Performance Indicator/KPI survey methodology) was captured for a comprehensive database on EnDev-supported rural electrification projects. | Specialist technical inspection teams, comprising one (1) experienced technician and one (1) assistant, were recruited for this programme to conduct 2-day site visits, complete pre-pared checklists and questionnaires and train the beneficiary communities on system operation, maintenance and administration. Findings of these inspections were summarised and submitted to DGNREEC for subsequent follow-up with contractors. In addition, baseline data (through the EnDev Key Performance Indicator/KPI survey methodology) was captured for a comprehensive database on EnDev-supported rural electrification projects. | ||
− | |||
− | |||
This Inspection Guide present the checklists, measurements form, and KPI questionnaire, as well as explanatory documentation compiled during this programme and adapted to capture essential lessons learnt. | This Inspection Guide present the checklists, measurements form, and KPI questionnaire, as well as explanatory documentation compiled during this programme and adapted to capture essential lessons learnt. | ||
− | |||
− | |||
'''''Purpose of this Inspection Guide is to record the process and make templates available for future inspections by any interested third parties.''''' | '''''Purpose of this Inspection Guide is to record the process and make templates available for future inspections by any interested third parties.''''' | ||
+ | For any support regarding guidelines and updated templates for future inspections, third parties can enquire with: | ||
+ | <p style="text-align: center">Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH</p><p style="text-align: center">'''Energising Development (EnDev) Indonesia'''</p><p style="text-align: center">Jalan Tebet Barat VIII No. 52</p><p style="text-align: center">Jakarta Selatan</p><p style="text-align: center">Jakarta 12810</p><p style="text-align: center">INDONESIA</p><p style="text-align: center">Tel : +62 21 830 9438</p><p style="text-align: center">Fax: +62 21 830 9032</p><p style="text-align: center">Website: [http://endev-indonesia.or.id/ http://endev-indonesia.or.id]</p> | ||
− | |||
+ | Table | ||
− | + | of Content | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | of Content | ||
− | |||
− | |||
− | |||
− | |||
[https://energypedia.info/index.php?title=Technical_Inspection_Guidelines_for_Solar_PV_Mini-grids_(EnDev_Indonesia_2013)&action=edit&mode=wysiwyg&redlink=1#_Toc372196844 List of Figures and Tables] | [https://energypedia.info/index.php?title=Technical_Inspection_Guidelines_for_Solar_PV_Mini-grids_(EnDev_Indonesia_2013)&action=edit&mode=wysiwyg&redlink=1#_Toc372196844 List of Figures and Tables] | ||
Line 72: | Line 28: | ||
[https://energypedia.info/index.php?title=Technical_Inspection_Guidelines_for_Solar_PV_Mini-grids_(EnDev_Indonesia_2013)&action=edit&mode=wysiwyg&redlink=1#_Toc372196846 Glossary] | [https://energypedia.info/index.php?title=Technical_Inspection_Guidelines_for_Solar_PV_Mini-grids_(EnDev_Indonesia_2013)&action=edit&mode=wysiwyg&redlink=1#_Toc372196846 Glossary] | ||
− | [https://energypedia.info/index.php?title=Technical_Inspection_Guidelines_for_Solar_PV_Mini-grids_(EnDev_Indonesia_2013)&action=edit&mode=wysiwyg&redlink=1#_Toc372196847 1 | + | [https://energypedia.info/index.php?title=Technical_Inspection_Guidelines_for_Solar_PV_Mini-grids_(EnDev_Indonesia_2013)&action=edit&mode=wysiwyg&redlink=1#_Toc372196847 1 Introduction] |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | [https://energypedia.info/index.php?title=Technical_Inspection_Guidelines_for_Solar_PV_Mini-grids_(EnDev_Indonesia_2013)&action=edit&mode=wysiwyg&redlink=1# | + | [https://energypedia.info/index.php?title=Technical_Inspection_Guidelines_for_Solar_PV_Mini-grids_(EnDev_Indonesia_2013)&action=edit&mode=wysiwyg&redlink=1#_Toc372196848 2 Inspection Guide Overview] |
− | [https://energypedia.info/index.php?title=Technical_Inspection_Guidelines_for_Solar_PV_Mini-grids_(EnDev_Indonesia_2013)&action=edit&mode=wysiwyg&redlink=1# | + | [https://energypedia.info/index.php?title=Technical_Inspection_Guidelines_for_Solar_PV_Mini-grids_(EnDev_Indonesia_2013)&action=edit&mode=wysiwyg&redlink=1#_Toc372196849 3 Inspection Preparation] |
− | [https://energypedia.info/index.php?title=Technical_Inspection_Guidelines_for_Solar_PV_Mini-grids_(EnDev_Indonesia_2013)&action=edit&mode=wysiwyg&redlink=1# | + | [https://energypedia.info/index.php?title=Technical_Inspection_Guidelines_for_Solar_PV_Mini-grids_(EnDev_Indonesia_2013)&action=edit&mode=wysiwyg&redlink=1#_Toc372196850 3.1 List of equipment] |
− | [https://energypedia.info/index.php?title=Technical_Inspection_Guidelines_for_Solar_PV_Mini-grids_(EnDev_Indonesia_2013)&action=edit&mode=wysiwyg&redlink=1# | + | [https://energypedia.info/index.php?title=Technical_Inspection_Guidelines_for_Solar_PV_Mini-grids_(EnDev_Indonesia_2013)&action=edit&mode=wysiwyg&redlink=1#_Toc372196851 3.2 Implementation guide] |
− | [https://energypedia.info/index.php?title=Technical_Inspection_Guidelines_for_Solar_PV_Mini-grids_(EnDev_Indonesia_2013)&action=edit&mode=wysiwyg&redlink=1# | + | [https://energypedia.info/index.php?title=Technical_Inspection_Guidelines_for_Solar_PV_Mini-grids_(EnDev_Indonesia_2013)&action=edit&mode=wysiwyg&redlink=1#_Toc372196852 3.3 The inspection process] |
− | [https://energypedia.info/index.php?title=Technical_Inspection_Guidelines_for_Solar_PV_Mini-grids_(EnDev_Indonesia_2013)&action=edit&mode=wysiwyg&redlink=1# | + | [https://energypedia.info/index.php?title=Technical_Inspection_Guidelines_for_Solar_PV_Mini-grids_(EnDev_Indonesia_2013)&action=edit&mode=wysiwyg&redlink=1#_Toc372196853 3.4 General tips] |
− | [https://energypedia.info/index.php?title=Technical_Inspection_Guidelines_for_Solar_PV_Mini-grids_(EnDev_Indonesia_2013)&action=edit&mode=wysiwyg&redlink=1# | + | [https://energypedia.info/index.php?title=Technical_Inspection_Guidelines_for_Solar_PV_Mini-grids_(EnDev_Indonesia_2013)&action=edit&mode=wysiwyg&redlink=1#_Toc372196854 3.5 PV-VP Block Diagram] |
− | [https://energypedia.info/index.php?title=Technical_Inspection_Guidelines_for_Solar_PV_Mini-grids_(EnDev_Indonesia_2013)&action=edit&mode=wysiwyg&redlink=1# | + | [https://energypedia.info/index.php?title=Technical_Inspection_Guidelines_for_Solar_PV_Mini-grids_(EnDev_Indonesia_2013)&action=edit&mode=wysiwyg&redlink=1#_Toc372196855 4 Technical and Workmanship Checklist] |
− | [https://energypedia.info/index.php?title=Technical_Inspection_Guidelines_for_Solar_PV_Mini-grids_(EnDev_Indonesia_2013)&action=edit&mode=wysiwyg&redlink=1# | + | [https://energypedia.info/index.php?title=Technical_Inspection_Guidelines_for_Solar_PV_Mini-grids_(EnDev_Indonesia_2013)&action=edit&mode=wysiwyg&redlink=1#_Toc372196856 4.1 Component compliance] |
− | [https://energypedia.info/index.php?title=Technical_Inspection_Guidelines_for_Solar_PV_Mini-grids_(EnDev_Indonesia_2013)&action=edit&mode=wysiwyg&redlink=1# | + | [https://energypedia.info/index.php?title=Technical_Inspection_Guidelines_for_Solar_PV_Mini-grids_(EnDev_Indonesia_2013)&action=edit&mode=wysiwyg&redlink=1#_Toc372196857 4.2 Performance verification] |
− | [https://energypedia.info/index.php?title=Technical_Inspection_Guidelines_for_Solar_PV_Mini-grids_(EnDev_Indonesia_2013)&action=edit&mode=wysiwyg&redlink=1# | + | [https://energypedia.info/index.php?title=Technical_Inspection_Guidelines_for_Solar_PV_Mini-grids_(EnDev_Indonesia_2013)&action=edit&mode=wysiwyg&redlink=1#_Toc372196858 4.3 Workmanship quality] |
− | [https://energypedia.info/index.php?title=Technical_Inspection_Guidelines_for_Solar_PV_Mini-grids_(EnDev_Indonesia_2013)&action=edit&mode=wysiwyg&redlink=1# | + | [https://energypedia.info/index.php?title=Technical_Inspection_Guidelines_for_Solar_PV_Mini-grids_(EnDev_Indonesia_2013)&action=edit&mode=wysiwyg&redlink=1#_Toc372196859 4.4 Photographs] |
− | [https://energypedia.info/index.php?title=Technical_Inspection_Guidelines_for_Solar_PV_Mini-grids_(EnDev_Indonesia_2013)&action=edit&mode=wysiwyg&redlink=1# | + | [https://energypedia.info/index.php?title=Technical_Inspection_Guidelines_for_Solar_PV_Mini-grids_(EnDev_Indonesia_2013)&action=edit&mode=wysiwyg&redlink=1#_Toc372196860 5 KPI Questionnaire] |
− | [https://energypedia.info/index.php?title=Technical_Inspection_Guidelines_for_Solar_PV_Mini-grids_(EnDev_Indonesia_2013)&action=edit&mode=wysiwyg&redlink=1# | + | [https://energypedia.info/index.php?title=Technical_Inspection_Guidelines_for_Solar_PV_Mini-grids_(EnDev_Indonesia_2013)&action=edit&mode=wysiwyg&redlink=1#_Toc372196861 6 Technical Summary Sheet] |
− | [https://energypedia.info/index.php?title=Technical_Inspection_Guidelines_for_Solar_PV_Mini-grids_(EnDev_Indonesia_2013)&action=edit&mode=wysiwyg&redlink=1# | + | [https://energypedia.info/index.php?title=Technical_Inspection_Guidelines_for_Solar_PV_Mini-grids_(EnDev_Indonesia_2013)&action=edit&mode=wysiwyg&redlink=1#_Toc372196862 7 Appendix 1 Technical checklist – component compliance] |
+ | [https://energypedia.info/index.php?title=Technical_Inspection_Guidelines_for_Solar_PV_Mini-grids_(EnDev_Indonesia_2013)&action=edit&mode=wysiwyg&redlink=1#_Toc372196863 8 Appendix 2 Technical checklist – performance verification] | ||
+ | [https://energypedia.info/index.php?title=Technical_Inspection_Guidelines_for_Solar_PV_Mini-grids_(EnDev_Indonesia_2013)&action=edit&mode=wysiwyg&redlink=1#_Toc372196864 9 Appendix 3 Workmanship checklist] | ||
+ | [https://energypedia.info/index.php?title=Technical_Inspection_Guidelines_for_Solar_PV_Mini-grids_(EnDev_Indonesia_2013)&action=edit&mode=wysiwyg&redlink=1#_Toc372196865 10 Appendix 4 KPI questionnaire] | ||
+ | [https://energypedia.info/index.php?title=Technical_Inspection_Guidelines_for_Solar_PV_Mini-grids_(EnDev_Indonesia_2013)&action=edit&mode=wysiwyg&redlink=1#_Toc372196866 11 Appendix 5 Manual for KPI questionnaire] | ||
+ | [https://energypedia.info/index.php?title=Technical_Inspection_Guidelines_for_Solar_PV_Mini-grids_(EnDev_Indonesia_2013)&action=edit&mode=wysiwyg&redlink=1#_Toc372196867 12 Appendix 6 Technical summary sheet with scoring guideline] | ||
+ | <br/> | ||
+ | <br/> | ||
+ | <br/> | ||
+ | <br/> | ||
+ | <br/> | ||
Download | Download |
Revision as of 07:53, 9 December 2013
Introduction
Energising Development (EnDev) Indonesia’s objective is to support sustainable access to modern energy services for rural communities in Indonesia. One key intervention is to support different rural electrification infrastructure projects under various public and private agencies in Indonesia.
By way of example, EnDev conducted a technical review and baseline data survey for over one hundred (100) 15kW solar mini-grid installations (photovoltaic village power/PV-VP) across Indonesia, installed by local suppliers under contract with Directorate General for New and Renewable Energy and Energy Conservation (DGNREEC) during 2013. Hereafter referred to as the DGNREEC PV-VP Technical Review 2013.
Specialist technical inspection teams, comprising one (1) experienced technician and one (1) assistant, were recruited for this programme to conduct 2-day site visits, complete pre-pared checklists and questionnaires and train the beneficiary communities on system operation, maintenance and administration. Findings of these inspections were summarised and submitted to DGNREEC for subsequent follow-up with contractors. In addition, baseline data (through the EnDev Key Performance Indicator/KPI survey methodology) was captured for a comprehensive database on EnDev-supported rural electrification projects.
This Inspection Guide present the checklists, measurements form, and KPI questionnaire, as well as explanatory documentation compiled during this programme and adapted to capture essential lessons learnt.
Purpose of this Inspection Guide is to record the process and make templates available for future inspections by any interested third parties.
For any support regarding guidelines and updated templates for future inspections, third parties can enquire with:
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH
Energising Development (EnDev) Indonesia
Jalan Tebet Barat VIII No. 52
Jakarta Selatan
Jakarta 12810
INDONESIA
Tel : +62 21 830 9438
Fax: +62 21 830 9032
Website: http://endev-indonesia.or.id
Table
of Content
4 Technical and Workmanship Checklist
7 Appendix 1 Technical checklist – component compliance
8 Appendix 2 Technical checklist – performance verification
9 Appendix 3 Workmanship checklist
10 Appendix 4 KPI questionnaire
11 Appendix 5 Manual for KPI questionnaire
12 Appendix 6 Technical summary sheet with scoring guideline
Download