'''Micro-Hydro Power (MHP)''' projects come along with a big variety of costs. Planning and developing a site brings a number of country, probalby regional specific costs. Similar to that are costs for operation and maintenance. All different cost categories play a role for individual projects, while big difference between countries due to different framework conditition might occur. A clear cost analysis upfront is highy recommended.<br/>
 
'''Micro-Hydro Power (MHP)''' projects come along with a big variety of costs. Planning and developing a site brings a number of country, probalby regional specific costs. Similar to that are costs for operation and maintenance. All different cost categories play a role for individual projects, while big difference between countries due to different framework conditition might occur. A clear cost analysis upfront is highy recommended.<br/>
 +
 +
<u>'''Cost factors''' are eventually:</u><u></u>
 +
 +
<span lang="EN-US">a locations <u>feasibility check</u> by respective personal</span>
 +
 +
<span lang="EN-US"><u>land</u>/water ownership/usage</span>
 +
 +
<span lang="EN-US"><u>civil construction</u> (canal, wear, intake, pipes, powerhouse)</span>
 +
 +
<span lang="EN-US"><u>electro-mechanical equipment</u> (turbine, generator, load controller)</span>
 +
 +
<u>power grid</u> (evtl. transformers, powerlines, house-cabeling, load limiters, meter installation, ...)
 +
 +
<u>opperation & maintenance</u> (collecting tarrifs, running and maintaining the assets)
 +
 +
<u>Some '''remarks''' regarding costs:</u>
 +
 +
<span lang="EN-US">Land & water requirements are mostly small. But there may be interference with existing schemes (irrigation) or legal issues to be considered.</span>
 +
 +
Order to delivery of <span lang="EN-US"><u>electro-mechanical equipment</u> may</span> take half a year. Ensure to order in time.
 +
 +
<span lang="EN-US">Costs for power lines and household connections often require a substantial amount from the overall budged.</span>
 +
 +
<span lang="EN-US">Any mhp scheme supplying a group of households has to install fixed procedures to cover operation & maintenance.<br/> This includes the collection of tariffs from each user. </span>
 +
 +
  
 
<br/>
 
<br/>
 
  
 
== MHP costs in Rwanda<br/> ==
 
== MHP costs in Rwanda<br/> ==
  
*in [[Results_GIZ_Kigali_MHP_meeting_2011|Rwanda in 2011 various cost categories for MHP were analysed.]]
+
*in [[Results GIZ Kigali MHP meeting 2011|Rwanda in 2011 various cost categories for MHP were analysed.]]
 
*A special chapter about the [[Estimation of management costs|management costs]] was developed, too.
 
*A special chapter about the [[Estimation of management costs|management costs]] was developed, too.
  

Revision as of 10:11, 7 January 2014


Overview

Micro-Hydro Power (MHP) projects come along with a big variety of costs. Planning and developing a site brings a number of country, probalby regional specific costs. Similar to that are costs for operation and maintenance. All different cost categories play a role for individual projects, while big difference between countries due to different framework conditition might occur. A clear cost analysis upfront is highy recommended.

Cost factors are eventually:

a locations feasibility check by respective personal

land/water ownership/usage

civil construction (canal, wear, intake, pipes, powerhouse)

electro-mechanical equipment (turbine, generator, load controller)

power grid (evtl. transformers, powerlines, house-cabeling, load limiters, meter installation, ...)

opperation & maintenance (collecting tarrifs, running and maintaining the assets)

Some remarks regarding costs:

Land & water requirements are mostly small. But there may be interference with existing schemes (irrigation) or legal issues to be considered.

Order to delivery of electro-mechanical equipment may take half a year. Ensure to order in time.

Costs for power lines and household connections often require a substantial amount from the overall budged.

Any mhp scheme supplying a group of households has to install fixed procedures to cover operation & maintenance.
This includes the collection of tariffs from each user.



MHP costs in Rwanda


Further Information