Difference between revisions of "MHP El Plan"

From energypedia
***** (***** | *****)
***** (***** | *****)
Line 1: Line 1:
 +
 +
 +
= Overview<br/> =
 +
 +
'''<u>Location of the site:</u>'''
 +
*<u>Country</u>: Germany
 +
*<u>District</u>: <span style="color: rgb(34, 34, 34); font-family: arial, sans-serif; font-size: small; line-height: 16px">Baden-Württemberg</span>
 +
*<u>River</u>: Schanzbach
 +
*<u>GPS Coordinates</u>: 47<span style="text-align: left">º55’40.5’’N 7º55’31.2’’E</span>
 +
 +
<br/>This pico pelton turbine is part of a hybrid system which supplies electricity to the Häusleberg Organic Farm. For more information please go to the project website: [https://sites.google.com/site/haeusleberg/ sites.google.com/site/haeusleberg/]
 +
 +
<br/>
 +
 +
= Further Information - Project<br/> =
 +
 +
'''Start of Construction:''' December 2011<br/>'''Date of Commissioning:''' June 2012
 +
 +
 +
 +
'''Ownership / Operation Model:''' Privately owned
 +
 +
'''Tariff structure:''' Not applicable
 +
 +
<br/>'''Turbine:''' Pelton
 +
 +
'''Generator:''' Modified direct drive motor, 3 phase, 20 V, 150 W (approximately)
 +
 +
{| class="FCK__ShowTableBorders" border="0" cellpadding="3" cellspacing="1" style="width: 100%;"
 +
|-
 +
| colspan="2" |
 +
[[File:Haeusleberg farm.jpg|frame|center|A view over the Häusleberg organic farm]]
 +
 +
|-
 +
| colspan="2" |
 +
<br/>
 +
 +
|-
 +
| [[File:Haeusleberg turbine 1.jpg|frame|center|Side view of the installed turbine atop the wooden framed drainage barrel.]]<br/>
 +
| [[File:Haeusleberg turbine 2.jpg|frame|center|Top view of the installed turbine atop the wooden framed drainage barrel.]]<br/>
 +
|-
 +
| <br/>
 +
| <br/>
 +
|-
 +
| [[File:Haeusleberg turbine 3.jpg|frame|center|The turbine from below showing the pelton runner at the nozzle mounting bracket.]]<br/>
 +
| [[File:Haeusleberg turbine 4.jpg|frame|center|The stator of the direct drive motor during modifications for the 12 V hybrid system.]]<br/>
 +
|-
 +
| <br/>
 +
| <br/>
 +
|-
 +
| [[File:Haeusleberg turbine 5.jpg|frame|center|Nozzle alignment test.]]<br/>
 +
|
 +
|-
 +
| <br/>
 +
|
 +
|}
 +
 +
<br/>
 +
 +
= Further Information<br/> =
 +
 +
*project website: [https://sites.google.com/site/haeusleberg/ sites.google.com/site/haeusleberg/]
 +
 +
<br/>
 +
 +
= References<br/> =
 +
 +
<references />
 +
 +
 +
 +
 +
 +
  
  
Line 9: Line 83:
 
''add general comments such as number of connected HH in this segment''
 
''add general comments such as number of connected HH in this segment''
  
 
+
<br/>
  
 
'''Start of construction:'''<br/>'''Date of Commissioning:'''
 
'''Start of construction:'''<br/>'''Date of Commissioning:'''
  
 
+
<br/>
  
 
'''Ownership / Operation Model:'''
 
'''Ownership / Operation Model:'''
Line 21: Line 95:
 
<br/>'''Turbine:'''
 
<br/>'''Turbine:'''
  
'''Generator: '''<br/>  
+
'''Generator: '''<br/>
  
 
{| cellspacing="1" cellpadding="1" border="1" style="width: 100%;"
 
{| cellspacing="1" cellpadding="1" border="1" style="width: 100%;"

Revision as of 21:09, 26 March 2014


Overview

Location of the site:

  • Country: Germany
  • District: Baden-Württemberg
  • River: Schanzbach
  • GPS Coordinates: 47º55’40.5’’N 7º55’31.2’’E


This pico pelton turbine is part of a hybrid system which supplies electricity to the Häusleberg Organic Farm. For more information please go to the project website: sites.google.com/site/haeusleberg/


Further Information - Project

Start of Construction: December 2011
Date of Commissioning: June 2012


Ownership / Operation Model: Privately owned

Tariff structure: Not applicable


Turbine: Pelton

Generator: Modified direct drive motor, 3 phase, 20 V, 150 W (approximately)

A view over the Häusleberg organic farm


Side view of the installed turbine atop the wooden framed drainage barrel.

Top view of the installed turbine atop the wooden framed drainage barrel.



The turbine from below showing the pelton runner at the nozzle mounting bracket.

The stator of the direct drive motor during modifications for the 12 V hybrid system.



Nozzle alignment test.



Further Information


References





Location of the site:

  • Country: text
  • District: text
  • River: text
  • GPS Coordinates: text

add general comments such as number of connected HH in this segment


Start of construction:
Date of Commissioning:


Ownership / Operation Model:

Tariff structure:


Turbine:

Generator:

add picture of MHP location add picture of MHP location
add description of picture add description of picture
add picture of MHP location
add picture of MHP location
add description of picture add description of picture

add respective country category