Difference between revisions of "MHP El Plan"
From energypedia
***** (***** | *****) |
***** (***** | *****) |
||
Line 16: | Line 16: | ||
'''Start of Construction:''' December 2011<br/>'''Date of Commissioning:''' June 2012 | '''Start of Construction:''' December 2011<br/>'''Date of Commissioning:''' June 2012 | ||
− | + | ||
'''Ownership / Operation Model:''' Privately owned | '''Ownership / Operation Model:''' Privately owned | ||
Line 26: | Line 26: | ||
'''Generator:''' Modified direct drive motor, 3 phase, 20 V, 150 W (approximately) | '''Generator:''' Modified direct drive motor, 3 phase, 20 V, 150 W (approximately) | ||
− | {| | + | {| class="FCK__ShowTableBorders" border="0" cellpadding="3" cellspacing="1" style="width: 100%;" |
+ | |- | ||
+ | | colspan="2" | | ||
+ | [[File:Haeusleberg farm.jpg|frame|center|A view over the Häusleberg organic farm]] | ||
+ | |||
+ | |- | ||
+ | | colspan="2" | | ||
+ | <br/> | ||
+ | |||
+ | |- | ||
+ | | [[File:Haeusleberg turbine 1.jpg|frame|center|Side view of the installed turbine atop the wooden framed drainage barrel.]]<br/> | ||
+ | | [[File:Haeusleberg turbine 2.jpg|frame|center|Top view of the installed turbine atop the wooden framed drainage barrel.]]<br/> | ||
+ | |- | ||
+ | | <br/> | ||
+ | | <br/> | ||
|- | |- | ||
− | | | + | | [[File:Haeusleberg turbine 3.jpg|frame|center|The turbine from below showing the pelton runner at the nozzle mounting bracket.]]<br/> |
− | | | + | | [[File:Haeusleberg turbine 4.jpg|frame|center|The stator of the direct drive motor during modifications for the 12 V hybrid system.]]<br/> |
|- | |- | ||
− | | | + | | <br/> |
− | | | + | | <br/> |
|- | |- | ||
− | | | + | | [[File:Haeusleberg turbine 5.jpg|frame|center|Nozzle alignment test.]]<br/> |
− | | | + | | |
|- | |- | ||
− | | | + | | <br/> |
− | | | + | | |
|} | |} | ||
− | + | <br/> | |
+ | |||
+ | = Further Information<br/> = | ||
+ | |||
+ | *project website: [https://sites.google.com/site/haeusleberg/ sites.google.com/site/haeusleberg/] | ||
+ | |||
+ | <br/> | ||
+ | |||
+ | = References<br/> = | ||
+ | |||
+ | <references /> |
Revision as of 21:24, 26 March 2014
Overview
Location of the site:
- Country: Germany
- District: Baden-Württemberg
- River: Schanzbach
- GPS Coordinates: 47º55’40.5’’N 7º55’31.2’’E
This pico pelton turbine is part of a hybrid system which supplies electricity to the Häusleberg Organic Farm. For more information please go to the project website: sites.google.com/site/haeusleberg/
Further Information - Project
Start of Construction: December 2011
Date of Commissioning: June 2012
Ownership / Operation Model: Privately owned
Tariff structure: Not applicable
Turbine: Pelton
Generator: Modified direct drive motor, 3 phase, 20 V, 150 W (approximately)
| |
Further Information
- project website: sites.google.com/site/haeusleberg/