'''Start of Construction:''' December 2011<br/>'''Date of Commissioning:''' June 2012
 
'''Start of Construction:''' December 2011<br/>'''Date of Commissioning:''' June 2012
  
<br/>
+
 
  
 
'''Ownership / Operation Model:''' Privately owned
 
'''Ownership / Operation Model:''' Privately owned
Line 26: Line 26:
 
'''Generator:''' Modified direct drive motor, 3 phase, 20 V, 150 W (approximately)
 
'''Generator:''' Modified direct drive motor, 3 phase, 20 V, 150 W (approximately)
  
{| cellspacing="1" cellpadding="1" border="1" style="width: 100%;"
+
{| class="FCK__ShowTableBorders" border="0" cellpadding="3" cellspacing="1" style="width: 100%;"
 +
|-
 +
| colspan="2" |
 +
[[File:Haeusleberg farm.jpg|frame|center|A view over the Häusleberg organic farm]]
 +
 
 +
|-
 +
| colspan="2" |
 +
<br/>
 +
 
 +
|-
 +
| [[File:Haeusleberg turbine 1.jpg|frame|center|Side view of the installed turbine atop the wooden framed drainage barrel.]]<br/>
 +
| [[File:Haeusleberg turbine 2.jpg|frame|center|Top view of the installed turbine atop the wooden framed drainage barrel.]]<br/>
 +
|-
 +
| <br/>
 +
| <br/>
 
|-
 
|-
| add picture of MHP location
+
| [[File:Haeusleberg turbine 3.jpg|frame|center|The turbine from below showing the pelton runner at the nozzle mounting bracket.]]<br/>
| add picture of MHP location
+
| [[File:Haeusleberg turbine 4.jpg|frame|center|The stator of the direct drive motor during modifications for the 12 V hybrid system.]]<br/>
 
|-
 
|-
| add description of picture
+
| <br/>
| add description of picture
+
| <br/>
 
|-
 
|-
| add picture of MHP location<br/>
+
| [[File:Haeusleberg turbine 5.jpg|frame|center|Nozzle alignment test.]]<br/>
| add picture of MHP location
+
|  
 
|-
 
|-
| add description of picture
+
| <br/>
| add description of picture
+
|  
 
|}
 
|}
  
''add respective country category''
+
<br/>
 +
 
 +
= Further Information<br/> =
 +
 
 +
*project website: [https://sites.google.com/site/haeusleberg/ sites.google.com/site/haeusleberg/]
 +
 
 +
<br/>
 +
 
 +
= References<br/> =
 +
 
 +
<references />

Revision as of 21:24, 26 March 2014

Overview

Location of the site:

  • Country: Germany
  • District: Baden-Württemberg
  • River: Schanzbach
  • GPS Coordinates: 47º55’40.5’’N 7º55’31.2’’E


This pico pelton turbine is part of a hybrid system which supplies electricity to the Häusleberg Organic Farm. For more information please go to the project website: sites.google.com/site/haeusleberg/


Further Information - Project

Start of Construction: December 2011
Date of Commissioning: June 2012


Ownership / Operation Model: Privately owned

Tariff structure: Not applicable


Turbine: Pelton

Generator: Modified direct drive motor, 3 phase, 20 V, 150 W (approximately)

A view over the Häusleberg organic farm


Side view of the installed turbine atop the wooden framed drainage barrel.

Top view of the installed turbine atop the wooden framed drainage barrel.



The turbine from below showing the pelton runner at the nozzle mounting bracket.

The stator of the direct drive motor during modifications for the 12 V hybrid system.



Nozzle alignment test.



Further Information


References