= Overview<br/> =
+
= Overview and General Information<br/> =
  
 
'''<u>Location of the site:</u>'''
 
'''<u>Location of the site:</u>'''
*<u>Country</u>: Germany
+
*<u>Country</u>: Nicaragua
*<u>District</u>: <span style="color: rgb(34, 34, 34); font-family: arial, sans-serif; font-size: small; line-height: 16px">Baden-Württemberg</span>
+
*<u>District</u>:  
*<u>River</u>: Schanzbach
+
*<u>River</u>:  
*<u>GPS Coordinates</u>: 47<span style="text-align: left">º55’40.5’’N 7º55’31.2’’E</span>
+
*<u>GPS Coordinates</u>:  
  
<br/>This pico pelton turbine is part of a hybrid system which supplies electricity to the Häusleberg Organic Farm. For more information please go to the project website: [https://sites.google.com/site/haeusleberg/ sites.google.com/site/haeusleberg/]
 
  
<br/>
 
  
= Further Information - Project<br/> =
 
  
'''Start of Construction:''' December 2011<br/>'''Date of Commissioning:''' June 2012
+
= Further Information<br/> =
 
 
 
 
 
 
'''Ownership / Operation Model:''' Privately owned
 
  
'''Tariff structure:''' Not applicable
+
'''Start of Construction:''' December 2011<br/>
 +
'''Date of Commissioning:''' June 2012<br/>
 +
'''Ownership / Operation Model:''' Privately owned<br/>
 +
'''Tariff structure:''' Not applicable<br/>
 +
'''Turbine:''' Pelton<br/>
 +
'''Generator:''' Modified direct drive motor, 3 phase, 20 V, 150 W (approximately)<br/>
  
<br/>'''Turbine:''' Pelton
 
  
'''Generator:''' Modified direct drive motor, 3 phase, 20 V, 150 W (approximately)
+
= Ressources - Codicions<br/> =
  
{| class="FCK__ShowTableBorders" border="0" cellpadding="3" cellspacing="1" style="width: 100%;"
 
|-
 
| colspan="2" |
 
[[File:Haeusleberg farm.jpg|frame|center|A view over the Häusleberg organic farm]]
 
  
|-
+
= Civil Works<br/> =
| colspan="2" |
 
<br/>
 
  
|-
 
| [[File:Haeusleberg turbine 1.jpg|frame|center|Side view of the installed turbine atop the wooden framed drainage barrel.]]<br/>
 
| [[File:Haeusleberg turbine 2.jpg|frame|center|Top view of the installed turbine atop the wooden framed drainage barrel.]]<br/>
 
|-
 
| <br/>
 
| <br/>
 
|-
 
| [[File:Haeusleberg turbine 3.jpg|frame|center|The turbine from below showing the pelton runner at the nozzle mounting bracket.]]<br/>
 
| [[File:Haeusleberg turbine 4.jpg|frame|center|The stator of the direct drive motor during modifications for the 12 V hybrid system.]]<br/>
 
|-
 
| <br/>
 
| <br/>
 
|-
 
| [[File:Haeusleberg turbine 5.jpg|frame|center|Nozzle alignment test.]]<br/>
 
|
 
|-
 
| <br/>
 
|
 
|}
 
  
<br/>
+
= Electromechanical Equipment<br/> =
 
 
= Further Information<br/> =
 
  
*project website: [https://sites.google.com/site/haeusleberg/ sites.google.com/site/haeusleberg/]
 
  
<br/>
+
= Electrical Transmission<br/> =
  
= References<br/> =
 
  
<references />
+
= Economic Information<br/> =

Revision as of 21:38, 26 March 2014

Overview and General Information

Location of the site:

  • Country: Nicaragua
  • District:
  • River:
  • GPS Coordinates:



Further Information

Start of Construction: December 2011
Date of Commissioning: June 2012
Ownership / Operation Model: Privately owned
Tariff structure: Not applicable
Turbine: Pelton
Generator: Modified direct drive motor, 3 phase, 20 V, 150 W (approximately)


Ressources - Codicions

Civil Works

Electromechanical Equipment

Electrical Transmission

Economic Information