Difference between revisions of "MHP El Plan"
From energypedia
***** (***** | *****) |
***** (***** | *****) |
||
Line 2: | Line 2: | ||
= Overview<br/> = | = Overview<br/> = | ||
− | Name of the site: El Plan<br/> | + | Name of the site: El Plan<br/> |
+ | Country: Nicaragua (GPS Coordinates: ?)<br/> | ||
+ | Turbine Type: Pelton<br/> | ||
+ | Power Output: XkW <br/> | ||
+ | Start of Construction: December 2011<br/> | ||
+ | Date of Commissioning: June 2012<br/> | ||
+ | Comments: <br/> | ||
+ | |||
+ | = Operation Data<br/> = | ||
+ | |||
+ | Head: <br/> | ||
+ | Flow: <br/> | ||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
− | |||
− | |||
= Technical Information<br/> = | = Technical Information<br/> = | ||
+ | |||
+ | |||
+ | |||
== Civil Works<br/> == | == Civil Works<br/> == | ||
== Electromechanical Equipment<br/> == | == Electromechanical Equipment<br/> == | ||
+ | |||
+ | Turbine: | ||
+ | |||
+ | |||
+ | Generator: | ||
+ | |||
== Electrical Transmission<br/> == | == Electrical Transmission<br/> == | ||
= Economic Information<br/> = | = Economic Information<br/> = | ||
+ | |||
+ | Developer: (Contact: )<br/> | ||
+ | Operator: (Contact: )<br/> | ||
+ | Ownership / Operation Model: Privately owned<br/> | ||
+ | Tariff structure: Not applicable<br/> | ||
+ | |||
+ | = Project Photos<br/> = |
Revision as of 21:57, 26 March 2014
Overview
Name of the site: El Plan
Country: Nicaragua (GPS Coordinates: ?)
Turbine Type: Pelton
Power Output: XkW
Start of Construction: December 2011
Date of Commissioning: June 2012
Comments:
Operation Data
Head:
Flow:
Technical Information
Civil Works
Electromechanical Equipment
Turbine:
Generator:
Electrical Transmission
Economic Information
Developer: (Contact: )
Operator: (Contact: )
Ownership / Operation Model: Privately owned
Tariff structure: Not applicable