Difference between revisions of "MHP El Plan"
From energypedia
***** (***** | *****) |
***** (***** | *****) |
||
Line 2: | Line 2: | ||
= Overview<br/> = | = Overview<br/> = | ||
− | Name of the site: El Plan< | + | {| border="1" align="left" cellspacing="1" cellpadding="2" style="width: 600px;" |
− | Country: Nicaragua (GPS Coordinates: ?)< | + | |- |
− | Turbine Type: Pelton< | + | | <span style="line-height: 20px;">Name of the site:</span> |
− | Power Output: | + | | <span style="line-height: 20px;">El Plan</span> |
− | Start of Construction: | + | |- |
− | Date of Commissioning: | + | | <span style="line-height: 20px;">Country:</span> |
− | + | | <span style="line-height: 20px;">Nicaragua (GPS Coordinates: ?)</span> | |
+ | |- | ||
+ | | <span style="line-height: 20px;">Turbine Type:</span> | ||
+ | | <span style="line-height: 20px;">Pelton</span> | ||
+ | |- | ||
+ | | <span style="line-height: 20px;">Country:</span> | ||
+ | | <span style="line-height: 20px;">Nicaragua (GPS Coordinates: ?)</span> | ||
+ | |- | ||
+ | | <span style="line-height: 20px;">Power Output:</span> | ||
+ | | <span style="line-height: 20px;">X kW</span> | ||
+ | |- | ||
+ | | <span style="line-height: 20px;">Start of Construction</span> | ||
+ | | <span style="line-height: 20px;">?</span> | ||
+ | |- | ||
+ | | <span style="line-height: 20px;">Date of Commissioning:</span> | ||
+ | | <span style="line-height: 20px;">?</span> | ||
+ | |- | ||
+ | |} | ||
− | |||
− | + | <br/>Comments:<br/> | |
− | |||
+ | = Operation Data<br/> = | ||
+ | Head:<br/>Flow:<br/> | ||
+ | <br/> | ||
+ | <br/> | ||
+ | <br/> | ||
+ | <br/> | ||
= Technical Information<br/> = | = Technical Information<br/> = | ||
− | |||
− | |||
− | |||
== Civil Works<br/> == | == Civil Works<br/> == | ||
Line 31: | Line 49: | ||
== Electromechanical Equipment<br/> == | == Electromechanical Equipment<br/> == | ||
− | Turbine: | + | Turbine: |
− | |||
− | Generator: | + | <br/>Generator: |
+ | <br/> | ||
== Electrical Transmission<br/> == | == Electrical Transmission<br/> == | ||
Line 41: | Line 59: | ||
= Economic Information<br/> = | = Economic Information<br/> = | ||
− | Developer: (Contact: )<br/> | + | Developer: (Contact: )<br/>Operator: (Contact: )<br/>Ownership / Operation Model: Privately owned<br/>Tariff structure: Not applicable<br/> |
− | Operator: (Contact: )<br/> | ||
− | Ownership / Operation Model: Privately owned<br/> | ||
− | Tariff structure: Not applicable<br/> | ||
= Project Photos<br/> = | = Project Photos<br/> = |
Revision as of 22:09, 26 March 2014
Overview
Name of the site: | El Plan |
Country: | Nicaragua (GPS Coordinates: ?) |
Turbine Type: | Pelton |
Country: | Nicaragua (GPS Coordinates: ?) |
Power Output: | X kW |
Start of Construction | ? |
Date of Commissioning: | ? |
Comments:
Operation Data
Head:
Flow:
Technical Information
Civil Works
Electromechanical Equipment
Turbine:
Generator:
Electrical Transmission
Economic Information
Developer: (Contact: )
Operator: (Contact: )
Ownership / Operation Model: Privately owned
Tariff structure: Not applicable