Difference between revisions of "MHP El Plan"
From energypedia
***** (***** | *****) |
***** (***** | *****) |
||
Line 11: | Line 11: | ||
|- | |- | ||
| style="width: 194px;" | <span style="line-height: 18px;">Turbine Type:</span> | | style="width: 194px;" | <span style="line-height: 18px;">Turbine Type:</span> | ||
− | | style="width: 390px;" | <span style="line-height: | + | | style="width: 390px;" | <span style="line-height: 18px;">Pelton</span> |
|- | |- | ||
| style="width: 194px;" | <span style="line-height: 18px;">Country:</span> | | style="width: 194px;" | <span style="line-height: 18px;">Country:</span> |
Revision as of 22:47, 26 March 2014
Overview
Name of the site: | El Plan |
Country: | Nicaragua (GPS Coordinates: ?) |
Turbine Type: | Pelton |
Country: | Nicaragua (GPS Coordinates: ?) |
Power Output: | X kW |
Project Status: | in operation |
Start of Construction: | ? |
Date of Commissioning: | ? |
Comments: | ? |
Operation Data
Head: | |
Flow: | |
Turbine Type: | Pelton |
Country: | Nicaragua (GPS Coordinates: ?) |
Power Output: | X kW |
Start of Construction | ? |
Date of Commissioning: | ? |
Comments: | ? |
Technical Information
Head: | |
Flow: | |
Turbine Type: | Pelton |
Country: | Nicaragua (GPS Coordinates: ?) |
Power Output: | X kW |
Start of Construction | ? |
Date of Commissioning: | ? |
Comments: | ? |
Civil Works
Penstock Diameter: | X |
Penstock Length: | |
Penstock Material: | PVC |
Dam Type | |
Dam Construction Material: | X kW |
Dam Height: | ? |
Dam Length: | ? |
Storage Volume Reservoir: | ? |
Electromechanical Equipment
Turbine:
Turbine Maufacturer: (Contact: )
Generator: Generator Manufaturer Generator Capacity
Electrical Transmission
Mini Grid yes Connection to national Grid Voltage Transmission Conductor Diameter of Conductor Transformer Rating kvA
Economic Information
Developer: (Contact: )
Operator: (Contact: )
Ownership / Operation Model: Privately owned
Tariff structure: Not applicable
Cost: Connected Hounsholds Connection Cost Cost to be covered by houshold