Difference between revisions of "MHP El Plan"

From energypedia
***** (***** | *****)
***** (***** | *****)
Line 18: Line 18:
 
| style="width: 194px;" | <span style="line-height: 18px;">Project Status:</span>
 
| style="width: 194px;" | <span style="line-height: 18px;">Project Status:</span>
 
| style="width: 390px;" | <span style="line-height: 18px;">in operation</span>
 
| style="width: 390px;" | <span style="line-height: 18px;">in operation</span>
|-
 
| style="width: 194px;" | <span style="line-height: 18px;">Start of Construction:</span>
 
| style="width: 390px;" | <span style="line-height: 18px;">?</span>
 
|-
 
| style="width: 194px;" | <span style="line-height: 18px;">Date of Commissioning:</span>
 
| style="width: 390px;" | <span style="line-height: 18px;">?</span>
 
 
|-
 
|-
 
| style="width: 194px;" | <span style="line-height: 18px;">Comments:</span>
 
| style="width: 194px;" | <span style="line-height: 18px;">Comments:</span>
Line 240: Line 234:
  
 
Developer: (Contact: )<br/>Operator: (Contact: )<br/>Ownership / Operation Model: Privately owned<br/>Tariff structure: Not applicable<br/>Cost: Connected Hounsholds Connection Cost Cost to be covered by houshold
 
Developer: (Contact: )<br/>Operator: (Contact: )<br/>Ownership / Operation Model: Privately owned<br/>Tariff structure: Not applicable<br/>Cost: Connected Hounsholds Connection Cost Cost to be covered by houshold
 +
 +
 +
|-
 +
| style="width: 194px;" | <span style="line-height: 18px;">Start of Construction:</span>
 +
| style="width: 390px;" | <span style="line-height: 18px;">?</span>
 +
|-
 +
| style="width: 194px;" | <span style="line-height: 18px;">Date of Commissioning:</span>
 +
| style="width: 390px;" | <span style="line-height: 18px;">?</span>
  
 
<br/>
 
<br/>
  
 
= Project Photos<br/> =
 
= Project Photos<br/> =

Revision as of 18:54, 27 March 2014

Overview

Name of the site: El Plan
Country: Nicaragua (GPS Coordinates: ?)
Turbine Type: Pelton
Power Output: X kW
Project Status: in operation
Comments: ?



Operation Data

Gross Head:
Net Head:
Flow (design flow):
Comments on flow variation during the year:



Technical Information

Head:
Flow:
Turbine Type: Pelton
Country: Nicaragua (GPS Coordinates: ?)
Power Output: X kW
Start of Construction ?
Date of Commissioning: ?
Comments: ?



Civil Works and Penstock

Size of Dam:
Dam Material:
Desarenador:
Camera de Carga:
Penstock Diameter: X
Penstock Length:
Penstock Material: PVC
Dam Type
Dam Construction Material: X kW
Dam Height: ?
Dam Length: ?
Storage Volume Reservoir: ?
Security Valve:

Electromechanical Equipment

Turbine

Turbine Type: Pelton, x injectors
Turbine Manufacturer: (Contact:)
Potencial (nominal):
Rated Head:
Rated Flow:
Rated Speed: X
:
:
:
:
:
:
:

Generator:

Generator Manufacturer and Model:
Phases: 3
Potencial (nominal):
Nominal voltage:
Speed:
Frequenzy: X
Insolation Class:
:



Electrical Transmission

Mini Grid yes Connection to national Grid Voltage Transmission Conductor Diameter of Conductor Transformer Rating kvA


Economic Information

Developer: (Contact: )
Operator: (Contact: )
Ownership / Operation Model: Privately owned
Tariff structure: Not applicable
Cost: Connected Hounsholds Connection Cost Cost to be covered by houshold


|- | style="width: 194px;" | Start of Construction: | style="width: 390px;" | ? |- | style="width: 194px;" | Date of Commissioning: | style="width: 390px;" | ?


Project Photos