Difference between revisions of "MHP El Plan"

From energypedia
***** (***** | *****)
***** (***** | *****)
Line 62: Line 62:
  
 
<br/>
 
<br/>
 +
  
 
= Technical Information<br/> =
 
= Technical Information<br/> =
Line 67: Line 68:
 
{| border="0" align="left" cellspacing="1" cellpadding="2" style="width: 600px;"
 
{| border="0" align="left" cellspacing="1" cellpadding="2" style="width: 600px;"
 
|-
 
|-
| style="width: 194px;" | <span style="line-height: 18px;">Head:</span>
+
| style="width: 194px;" | <br/>
| style="width: 390px;" | <span style="line-height: 18px;"></span>
+
| style="width: 390px;" | <br/>
|-
 
| style="width: 194px;" | <span style="line-height: 18px;">Flow:</span>
 
| style="width: 390px;" | <span style="line-height: 18px;"></span>
 
|-
 
| style="width: 194px;" | <span style="line-height: 18px;">Turbine Type:</span>
 
| style="width: 390px;" | <span style="line-height: 18px;">Pelton</span>
 
|-
 
| style="width: 194px;" | <span style="line-height: 18px;">Country:</span>
 
| style="width: 390px;" | <span style="line-height: 18px;">Nicaragua (GPS Coordinates: ?)</span>
 
|-
 
| style="width: 194px;" | <span style="line-height: 18px;">Power Output:</span>
 
| style="width: 390px;" | <span style="line-height: 18px;">X kW</span>
 
|-
 
| style="width: 194px;" | <span style="line-height: 18px;">Start of Construction</span>
 
| style="width: 390px;" | <span style="line-height: 18px;">?</span>
 
|-
 
| style="width: 194px;" | <span style="line-height: 18px;">Date of Commissioning:</span>
 
| style="width: 390px;" | <span style="line-height: 18px;">?</span>
 
 
|-
 
|-
 
| style="width: 194px;" | <span style="line-height: 18px;">Comments:</span>
 
| style="width: 194px;" | <span style="line-height: 18px;">Comments:</span>
| style="width: 390px;" | <span style="line-height: 18px;">?</span>
+
| style="width: 390px;" | <span style="line-height: 18px;">General Technical Comments on the Project</span>
 
|}
 
|}
  
Line 230: Line 213:
  
 
<br/>
 
<br/>
 +
  
 
= Economic Information<br/> =
 
= Economic Information<br/> =

Revision as of 18:58, 27 March 2014

Overview

Name of the site: El Plan
Country: Nicaragua (GPS Coordinates: ?)
Turbine Type: Pelton
Power Output: X kW
Project Status: in operation
Comments: ?



Operation Data

Gross Head:
Net Head:
Flow (design flow):
Comments on flow variation during the year:




Technical Information



Comments: General Technical Comments on the Project



Civil Works and Penstock

Size of Dam:
Dam Material:
Desarenador:
Camera de Carga:
Penstock Diameter: X
Penstock Length:
Penstock Material: PVC
Dam Type
Dam Construction Material: X kW
Dam Height: ?
Dam Length: ?
Storage Volume Reservoir: ?
Security Valve:

Electromechanical Equipment

Turbine

Turbine Type: Pelton, x injectors
Turbine Manufacturer: (Contact:)
Potencial (nominal):
Rated Head:
Rated Flow:
Rated Speed: X
:
:
:
:
:
:
:

Generator:

Generator Manufacturer and Model:
Phases: 3
Potencial (nominal):
Nominal voltage:
Speed:
Frequenzy: X
Insolation Class:
:



Electrical Transmission

Mini Grid yes Connection to national Grid Voltage Transmission Conductor Diameter of Conductor Transformer Rating kvA



Economic Information

Developer: (Contact: )
Operator: (Contact: )
Ownership / Operation Model: Privately owned
Tariff structure: Not applicable
Cost: Connected Hounsholds Connection Cost Cost to be covered by houshold


|- | style="width: 194px;" | Start of Construction: | style="width: 390px;" | ? |- | style="width: 194px;" | Date of Commissioning: | style="width: 390px;" | ?


Project Photos