Knowledge fuels change
For over a decade, Energypedia has shared free, reliable energy expertise with the world.
We’re now facing a serious funding gap.
Help keep this platform alive — your donation, big or small, truly matters!
Thank you for your support
Difference between revisions of "MHP El Roblar"
From energypedia
***** (***** | *****) |
***** (***** | *****) |
||
| Line 273: | Line 273: | ||
<br/> | <br/> | ||
| + | |||
| Line 279: | Line 280: | ||
{| border="0" align="left" cellspacing="1" cellpadding="2" style="width: 800px;" | {| border="0" align="left" cellspacing="1" cellpadding="2" style="width: 800px;" | ||
|- | |- | ||
| − | | [[File:Dam El roblar.JPG|thumb]] | + | | [[File:Dam El roblar.JPG|thumb|300px|alt=Dam El roblar.JPG]] |
| − | | [[File:Dam El roblar 2.JPG|thumb]] | + | | [[File:Dam El roblar 2.JPG|thumb|300px|alt=Dam El roblar 2.JPG]] |
|- | |- | ||
| − | | [[File:Valve El roblar.JPG|thumb]] | + | | [[File:Valve El roblar.JPG|thumb|300px|alt=Valve El roblar.JPG]] |
| − | | [[File:Pelton El roblar.JPG|thumb]] | + | | [[File:Pelton El roblar.JPG|thumb|300px|alt=Pelton El roblar.JPG]] |
|- | |- | ||
| − | | [[File:Pelton El roblar 2.JPG|thumb]] | + | | [[File:Pelton El roblar 2.JPG|thumb|300px|alt=Pelton El roblar 2.JPG]] |
| | | | ||
|} | |} | ||
<br/><br/> | <br/><br/> | ||
Revision as of 21:54, 27 March 2014
Overview
| Name of the site: | El Roblar |
| Country: | Nicaragua (GPS Coordinates: ?) |
| Turbine Type: | Pelton |
| Power Output: | 12 kW |
| Project Status: | in operation |
| Comments: | - |
Operation Data
| Gross Head: | |
| Net/Design Head: | |
| Flow (design flow): | 35 l/s |
| Comments on flow variation during the year: | Problems with flow during dry season. |
Technical Information
| Comments: | General Technical Comments on the Project |
Civil Works and Penstock
| Dam construction material: | ConcreteConcrete |
| Dam Dimensions: | see fotos |
| Storage Volume Reservoir: | |
| Sedimentation Basin material: | Concrete |
| Sedimentation Basin Dimensions: | |
| Penstock Length: | |
| Penstock Diameter at Beginning: | |
| Penstock Diameter at End: | |
| Penstock Changes of Diameter: | |
| Penstock Material: | PVC |
| Security Valve: |
Electromechanical Equipment
Turbine
| Turbine Type: | Pelton, 1 injector |
| Turbine Diameter: | |
| Turbine Material: | |
| Turbine Manufacturer: | Nica Bosch (Contact: company does not exist any more) |
| Potencial (nominal): | 24 kW |
| Rated Head: | |
| Rated Flow: | |
| Rated Speed: | |
| Runaway Speed: | |
| Shaft diameter and material: | |
| Direction of Rotation: | clockwiseclockwise |
| Orientation of Shaft: | horizontalhorizontal |
Generator:
| Generator Manufacturer and Model: | StamfordStamford |
| Phases: | 3 |
| Potencial (nominal): | 30 kVA |
| Nominal voltage: | 480V |
| Nominal Speed: | 1800rpm |
| Frequency: | 60 Hz |
| Isolation Class: | H |
Mechanical Transmission / Coupling
| Type of Belt: | |
| Belt Manufacturer: | |
| Distance between Pulleys: | |
| Diameter of Generator Pulley: | |
| Diameter of Generator Pulley: |
Control System
| Control System Manufacturer and Model: | |
| Type of Control: | |
| Capacity: |
Electrical Transmission
| Mini Grid: | yes |
| Connection to national Grid: | no |
| Grid Voltage: | |
| Diameter of Conductor: | |
| Transformer Rating: |
Economic Information
| Developer: (Contact: ) | |
| Start of Construction: | |
| Date of Commissioning: | |
| Ownership / Operation Model: | |
| Operator: | |
| Tariff structure: | |
| Connected Housholds: | 45 |
| Connection Cost Cost to be covered by houshold: | |
| Overall Project Costs: |
Project Photos



















