Difference between revisions of "Costs of Micro-Hydro Power Sites"

From energypedia
***** (***** | *****)
***** (***** | *****)
m
Line 1: Line 1:
 
 
  
 
= Overview<br/> =
 
= Overview<br/> =
Line 36: Line 34:
 
== MHP costs in Rwanda<br/> ==
 
== MHP costs in Rwanda<br/> ==
  
*in [[Results GIZ Kigali MHP meeting 2011|Rwanda in 2011 various cost categories for MHP were analysed.]]
+
*in [[Results_GIZ_Kigali_MHP_meeting_2011|Rwanda in 2011 various cost categories for MHP were analysed.]]
*A special chapter about the [[Estimation of management costs|management costs]] was developed, too.
+
*A special chapter about the [[Micro-Hydropower_Plants_-_Estimation_of_Management_Costs|management costs]] was developed, too.
  
 +
<br/>
  
 
= Further Information =
 
= Further Information =
 
 
  
 
= References<br/> =
 
= References<br/> =
Line 48: Line 45:
 
<references />
 
<references />
  
 +
[[Category:Micro_Hydro]]
 +
[[Category:Hydro]]
 +
[[Category:Rwanda]]
 
[[Category:Financing_and_Funding]]
 
[[Category:Financing_and_Funding]]
[[Category:Rwanda]]
 
[[Category:Hydro]]
 
[[Category:Micro_Hydro]]
 

Revision as of 13:38, 9 July 2014

Overview

Micro-Hydro Power (MHP) projects come along with a big variety of costs. Planning and developing a site brings a number of country, probalby regional specific costs. Similar to that are costs for operation and maintenance. All different cost categories play a role for individual projects, while big difference between countries due to different framework conditition might occur. A clear cost analysis upfront is highy recommended.

Cost factors are eventually:

a locations feasibility check by respective personal

land/water ownership/usage

civil construction (canal, wear, intake, pipes, powerhouse)

electro-mechanical equipment (turbine, generator, load controller)

power grid (evtl. transformers, powerlines, house-cabeling, load limiters, meter installation, ...)

opperation & maintenance (collecting tarrifs, running and maintaining the assets)

Some remarks regarding costs:

Land & water requirements are mostly small. But there may be interference with existing schemes (irrigation) or legal issues to be considered.

Order to delivery of electro-mechanical equipment may take half a year. Ensure to order in time.

Costs for power lines and household connections often require a substantial amount from the overall budged.

Any mhp scheme supplying a group of households has to install fixed procedures to cover operation & maintenance.
This includes the collection of tariffs from each user.



MHP costs in Rwanda