Difference between revisions of "EnDev Indonesia Site Criteria Checklist for Solar / Micro Hydro Power Plants"

From energypedia
***** (***** | *****)
***** (***** | *****)
Line 6: Line 6:
 
Checklist is to be completed by the applicant for the PLTS or PLTMH infrastructure and submitted to the relevant decision-making authority, along with all supplementary information (e.g. site photographs).
 
Checklist is to be completed by the applicant for the PLTS or PLTMH infrastructure and submitted to the relevant decision-making authority, along with all supplementary information (e.g. site photographs).
  
 +
<br/>
 +
 +
More information
 +
 +
[[:File:https://energypedia.info/wiki/File:EnDev_Indonesia_Site_Criteria_Checklists_for_PLTS_and_PLTMH.pdf|EnDev Indonesia Site Criteria Checklists for PLTS and PLTMH]]
 +
 +
[[Category:Rural_Electrification]]
 +
[[Category:Rural_Development]]
 +
[[Category:Micro_Hydro]]
 +
[[Category:Solar]]
 +
[[Category:Photovoltaic_(PV)]]
 +
[[Category:Mini-grid]]
 
[[Category:Indonesia]]
 
[[Category:Indonesia]]
[[Category:Mini-grid]]
 
[[Category:Photovoltaic_(PV)]]
 
[[Category:Solar]]
 
[[Category:Micro_Hydro]]
 
[[Category:Rural_Development]]
 
[[Category:Rural_Electrification]]
 

Revision as of 04:39, 17 July 2014

Purpose of this checklist is to assess the suitability of a site to accommodate PLTS or PLTMH facility. The checklist also considers available resources and anticipated demand for electricity. The checklist highlights the minimum data and information needed to make a first-level feasibility assessment.


Checklist is to be completed by the applicant for the PLTS or PLTMH infrastructure and submitted to the relevant decision-making authority, along with all supplementary information (e.g. site photographs).


More information

EnDev Indonesia Site Criteria Checklists for PLTS and PLTMH