Difference between revisions of "Micro Hydro Power (MHP) Haeusleberg Farm"

From energypedia
***** (***** | *****)
m
***** (***** | *****)
m
Line 3: Line 3:
  
 
'''<u>Location of the site:</u>'''
 
'''<u>Location of the site:</u>'''
*<u>Country</u>: [[Germany_Energy_Situation|Germany]]
+
*<u>Country</u>: [[Germany Energy Situation|Germany]]
 
*<u>District</u>: <span style="color: rgb(34, 34, 34); font-family: arial, sans-serif; font-size: small; line-height: 16px">Baden-Württemberg</span>
 
*<u>District</u>: <span style="color: rgb(34, 34, 34); font-family: arial, sans-serif; font-size: small; line-height: 16px">Baden-Württemberg</span>
 
*<u>River</u>: Schanzbach
 
*<u>River</u>: Schanzbach
Line 16: Line 16:
 
'''Start of Construction:''' December 2011<br/>'''Date of Commissioning:''' June 2012
 
'''Start of Construction:''' December 2011<br/>'''Date of Commissioning:''' June 2012
  
 
+
<br/>
  
 
'''Ownership / Operation Model:''' Privately owned
 
'''Ownership / Operation Model:''' Privately owned
Line 29: Line 29:
 
|-
 
|-
 
| colspan="2" |  
 
| colspan="2" |  
[[File:Haeusleberg farm.jpg|frame|center|A view over the Häusleberg organic farm]]
+
[[File:Haeusleberg farm.jpg|frame|center|180px|A view over the Häusleberg organic farm]]
  
 
|-
 
|-
Line 36: Line 36:
  
 
|-
 
|-
| [[File:Haeusleberg turbine 1.jpg|frame|center|Side view of the installed turbine atop the wooden framed drainage barrel.]]<br/>
+
| [[File:Haeusleberg turbine 1.jpg|frame|center|80px|Side view of the installed turbine atop the wooden framed drainage barrel.]]<br/>
| [[File:Haeusleberg turbine 2.jpg|frame|center|Top view of the installed turbine atop the wooden framed drainage barrel.]]<br/>
+
| [[File:Haeusleberg turbine 2.jpg|frame|center|80px|Top view of the installed turbine atop the wooden framed drainage barrel.]]<br/>
 
|-
 
|-
 
| <br/>
 
| <br/>
 
| <br/>
 
| <br/>
 
|-
 
|-
| [[File:Haeusleberg turbine 3.jpg|frame|center|The turbine from below showing the pelton runner at the nozzle mounting bracket.]]<br/>
+
| [[File:Haeusleberg turbine 3.jpg|frame|center|80px|The turbine from below showing the pelton runner at the nozzle mounting bracket.]]<br/>
| [[File:Haeusleberg turbine 4.jpg|frame|center|The stator of the direct drive motor during modifications for the 12 V hybrid system.]]<br/>
+
| [[File:Haeusleberg turbine 4.jpg|frame|center|80px|The stator of the direct drive motor during modifications for the 12 V hybrid system.]]<br/>
 
|-
 
|-
 
| <br/>
 
| <br/>
 
| <br/>
 
| <br/>
 
|-
 
|-
| [[File:Haeusleberg turbine 5.jpg|frame|center|Nozzle alignment test.]]<br/>
+
| [[File:Haeusleberg turbine 5.jpg|frame|center|80px|Nozzle alignment test.]]<br/>
 
|  
 
|  
 
|-
 
|-
Line 60: Line 60:
  
 
*project website: [https://sites.google.com/site/haeusleberg/ sites.google.com/site/haeusleberg/]
 
*project website: [https://sites.google.com/site/haeusleberg/ sites.google.com/site/haeusleberg/]
*[[Germany_Energy_Situation|Germany Energy situation]]
+
*[[Germany Energy Situation|Germany Energy situation]]
  
 
= References<br/> =
 
= References<br/> =
Line 66: Line 66:
 
<references />
 
<references />
  
 +
[[Category:Germany]]
 
[[Category:Micro_Hydro]]
 
[[Category:Micro_Hydro]]
[[Category:Germany]]
 

Revision as of 10:40, 17 July 2014

Overview

Location of the site:

  • Country: Germany
  • District: Baden-Württemberg
  • River: Schanzbach
  • GPS Coordinates: 47º55’40.5’’N 7º55’31.2’’E


This pico pelton turbine is part of a hybrid system which supplies electricity to the Häusleberg Organic Farm. For more information please go to the project website: sites.google.com/site/haeusleberg/


Further Information - Project

Start of Construction: December 2011
Date of Commissioning: June 2012


Ownership / Operation Model: Privately owned

Tariff structure: Not applicable


Turbine: Pelton

Generator: Modified direct drive motor, 3 phase, 20 V, 150 W (approximately)

A view over the Häusleberg organic farm


Side view of the installed turbine atop the wooden framed drainage barrel.

Top view of the installed turbine atop the wooden framed drainage barrel.



The turbine from below showing the pelton runner at the nozzle mounting bracket.

The stator of the direct drive motor during modifications for the 12 V hybrid system.



Nozzle alignment test.



Further Information

References