Difference between revisions of "Micro Hydro Power (MHP) Haeusleberg Farm"
From energypedia
***** (***** | *****) m |
***** (***** | *****) m |
||
Line 29: | Line 29: | ||
|- | |- | ||
| colspan="2" | | | colspan="2" | | ||
− | [[File:Haeusleberg farm.jpg | + | [[File:Haeusleberg farm.jpg|center|8px|A view over the Häusleberg organic farm|alt=A view over the Häusleberg organic farm]] |
|- | |- | ||
Line 36: | Line 36: | ||
|- | |- | ||
− | | [[File:Haeusleberg turbine 1.jpg | + | | [[File:Haeusleberg turbine 1.jpg|center|8px|Side view of the installed turbine atop the wooden framed drainage barrel.|alt=Side view of the installed turbine atop the wooden framed drainage barrel.]]<br/> |
− | | [[File:Haeusleberg turbine 2.jpg | + | | [[File:Haeusleberg turbine 2.jpg|center|8px|Top view of the installed turbine atop the wooden framed drainage barrel.|alt=Top view of the installed turbine atop the wooden framed drainage barrel.]]<br/> |
|- | |- | ||
| <br/> | | <br/> | ||
| <br/> | | <br/> | ||
|- | |- | ||
− | | [[File:Haeusleberg turbine 3.jpg | + | | [[File:Haeusleberg turbine 3.jpg|center|8px|The turbine from below showing the pelton runner at the nozzle mounting bracket.|alt=The turbine from below showing the pelton runner at the nozzle mounting bracket.]]<br/> |
− | | [[File:Haeusleberg turbine 4.jpg | + | | [[File:Haeusleberg turbine 4.jpg|center|8px|The stator of the direct drive motor during modifications for the 12 V hybrid system.|alt=The stator of the direct drive motor during modifications for the 12 V hybrid system.]]<br/> |
|- | |- | ||
| <br/> | | <br/> | ||
| <br/> | | <br/> | ||
|- | |- | ||
− | | [[File:Haeusleberg turbine 5.jpg | + | | [[File:Haeusleberg turbine 5.jpg|center|8px|Nozzle alignment test.|alt=Nozzle alignment test.]]<br/> |
| | | | ||
|- | |- |
Revision as of 12:11, 17 July 2014
Overview
Location of the site:
- Country: Germany
- District: Baden-Württemberg
- River: Schanzbach
- GPS Coordinates: 47º55’40.5’’N 7º55’31.2’’E
This pico pelton turbine is part of a hybrid system which supplies electricity to the Häusleberg Organic Farm. For more information please go to the project website: sites.google.com/site/haeusleberg/
Further Information - Project
Start of Construction: December 2011
Date of Commissioning: June 2012
Ownership / Operation Model: Privately owned
Tariff structure: Not applicable
Turbine: Pelton
Generator: Modified direct drive motor, 3 phase, 20 V, 150 W (approximately)
| |
Further Information
- project website: sites.google.com/site/haeusleberg/