Difference between revisions of "Micro Hydro Power (MHP) Haeusleberg Farm"

From energypedia
***** (***** | *****)
***** (***** | *****)
 
(19 intermediate revisions by 3 users not shown)
Line 1: Line 1:
'''Location of the site:'''
 
  
*<u>Country</u>: Germany
+
= Overview<br/> =
*<u>District</u>:&nbsp;<span style="color: rgb(34, 34, 34); font-family: arial, sans-serif; font-size: small; line-height: 16px;">Baden-Württemberg</span>
+
 
 +
'''<u>Location of the site:</u>'''
 +
*<u>Country</u>: [[Germany_Energy_Situation|Germany]]
 +
*<u>District</u>: <span style="color: rgb(34, 34, 34); font-family: arial, sans-serif; font-size: small; line-height: 16px">Baden-Württemberg</span>
 
*<u>River</u>: Schanzbach
 
*<u>River</u>: Schanzbach
*<u>GPS Coordinates</u>: 47<span style="text-align: left;">º55’40.5’’N 7º55’31.2’’E</span>
+
*<u>GPS Coordinates</u>: 47<span style="text-align: left">º55’40.5’’N 7º55’31.2’’E</span>
  
<br/>This small pelton turbine is part of a hybrid system which supplies electricity to the Häusleberg Organic Farm. For more information please go to the project website:
+
<br/>This pico pelton turbine is part of a hybrid system which supplies electricity to the Häusleberg Organic Farm. For more information please go to the project website: [https://sites.google.com/site/haeusleberg/ sites.google.com/site/haeusleberg/]
  
[https://sites.google.com/site/haeusleberg/ https://sites.google.com/site/haeusleberg/]
 
  
 +
= Further Information - Project<br/> =
  
 
+
'''Start of Construction:''' December 2011<br/>'''Date of Commissioning:''' June 2012
'''Start of construction:''' December 2011<br/>'''Date of Commissioning:''' June 2012
 
  
 
&nbsp;
 
&nbsp;
Line 24: Line 25:
 
'''Generator:'''&nbsp;Modified direct drive motor, 3 phase, 20 V, 150 W (approximately)
 
'''Generator:'''&nbsp;Modified direct drive motor, 3 phase, 20 V, 150 W (approximately)
  
{| class="FCK__ShowTableBorders" cellspacing="1" cellpadding="1" width="100%" border="0"
+
{| class="FCK__ShowTableBorders" border="0" cellpadding="3" cellspacing="1" width="100%"
 
|-
 
|-
| [[File:Haeusleberg farm.jpg|370px|frame|A view over the Häusleberg organic farm]]<br/>
+
| colspan="2" |
| <br/>
+
[[File:Haeusleberg farm.jpg|frame|center|500x500px|A view over the Häusleberg organic farm]]
 +
 
 +
|-
 +
| colspan="2" |
 +
<br/>&nbsp;
 +
 
 
|-
 
|-
| Blah, blah
+
| [[File:Haeusleberg turbine 1.jpg|frame|center|200x500px|Side view of the installed turbine atop the wooden framed drainage barrel.]]<br/>
| Gobecho I powerhouse
+
| [[File:Haeusleberg turbine 2.jpg|frame|center|200x500px|Top view of the installed turbine atop the wooden framed drainage barrel.]]<br/>
 
|-
 
|-
 
| <br/>
 
| <br/>
 
| <br/>
 
| <br/>
 
|-
 
|-
| Gobecho I weir and intake
+
| [[File:Haeusleberg turbine 3.jpg|frame|center|200x500px|The turbine from below showing the pelton runner at the nozzle mounting bracket.]]<br/>
| Gobecho I turbine
+
| [[File:Haeusleberg turbine 4.jpg|frame|center|200x500px|The stator of the direct drive motor during modifications for the 12 V hybrid system.]]<br/>
 
|-
 
|-
 
| <br/>
 
| <br/>
| <br/>
+
| &nbsp;<br/>
 
|-
 
|-
| During Gobecho I testing
+
| [[File:Haeusleberg turbine 5.jpg|frame|center|200x500px|Nozzle alignment test.]]<br/>
| Gobecho I
+
|  
 
|-
 
|-
 
| <br/>
 
| <br/>
| <br/>
+
|  
|-
 
| People enjoying the benefits of electricity supplied by the MHP
 
| Gobecho I grid
 
 
|}
 
|}
 +
 +
 +
 +
= Further Information<br/> =
 +
 +
*project website: [https://sites.google.com/site/haeusleberg/ sites.google.com/site/haeusleberg/]
 +
 +
 +
 +
= References<br/> =
 +
 +
<references />
  
 
[[Category:Germany]]
 
[[Category:Germany]]
 
[[Category:Micro_Hydro]]
 
[[Category:Micro_Hydro]]

Latest revision as of 12:22, 17 July 2014

Overview

Location of the site:

  • Country: Germany
  • District: Baden-Württemberg
  • River: Schanzbach
  • GPS Coordinates: 47º55’40.5’’N 7º55’31.2’’E


This pico pelton turbine is part of a hybrid system which supplies electricity to the Häusleberg Organic Farm. For more information please go to the project website: sites.google.com/site/haeusleberg/


Further Information - Project

Start of Construction: December 2011
Date of Commissioning: June 2012

 

Ownership / Operation Model: Privately owned

Tariff structure: Not applicable


Turbine: Pelton

Generator: Modified direct drive motor, 3 phase, 20 V, 150 W (approximately)

A view over the Häusleberg organic farm


 

Side view of the installed turbine atop the wooden framed drainage barrel.

Top view of the installed turbine atop the wooden framed drainage barrel.



The turbine from below showing the pelton runner at the nozzle mounting bracket.

The stator of the direct drive motor during modifications for the 12 V hybrid system.


 
Nozzle alignment test.



Further Information


References