Difference between revisions of "EnDev Indonesia Site Criteria Checklist for Solar / Micro Hydro Power Plants"

From energypedia
***** (***** | *****)
***** (***** | *****)
m
Line 1: Line 1:
 +
 +
= Introduction =
  
 
[[File:EnDev Indonesia Site Criteria Checklists for PLTS and PLTMHCover.jpg|thumb|right|180px|alt=EnDev Indonesia Site Criteria Checklists for PLTS and PLTMHCover.jpg]]Purpose of this checklist is to assess the suitability of a site to accommodate PLTS or PLTMH facility. The checklist also considers available resources and anticipated demand for electricity. The checklist highlights the minimum data and information needed to make a first-level feasibility assessment.
 
[[File:EnDev Indonesia Site Criteria Checklists for PLTS and PLTMHCover.jpg|thumb|right|180px|alt=EnDev Indonesia Site Criteria Checklists for PLTS and PLTMHCover.jpg]]Purpose of this checklist is to assess the suitability of a site to accommodate PLTS or PLTMH facility. The checklist also considers available resources and anticipated demand for electricity. The checklist highlights the minimum data and information needed to make a first-level feasibility assessment.
Line 8: Line 10:
 
<br/>
 
<br/>
  
More information
+
= More Information =
 +
 
 +
*[[:File:EnDev Indonesia Site Criteria Checklists for PLTS and PLTMH.pdf|EnDev Indonesia Site Criteria Checklists for PLTS and PLTMH]]
 +
 
 +
<br/>
  
[[:File:EnDev_Indonesia_Site_Criteria_Checklists_for_PLTS_and_PLTMH.pdf|EnDev Indonesia Site Criteria Checklists for PLTS and PLTMH]]
+
= Reference =
  
 
[[Category:Rural_Electrification]]
 
[[Category:Rural_Electrification]]

Revision as of 07:19, 18 July 2014

Introduction

Purpose of this checklist is to assess the suitability of a site to accommodate PLTS or PLTMH facility. The checklist also considers available resources and anticipated demand for electricity. The checklist highlights the minimum data and information needed to make a first-level feasibility assessment.


Checklist is to be completed by the applicant for the PLTS or PLTMH infrastructure and submitted to the relevant decision-making authority, along with all supplementary information (e.g. site photographs).


More Information


Reference