Difference between revisions of "Costs of Micro-Hydro Power Sites"

From energypedia
***** (***** | *****)
m
***** (***** | *****)
m
Line 2: Line 2:
 
= Overview<br/> =
 
= Overview<br/> =
  
'''Micro-Hydro Power (MHP)''' projects come along with a big variety of costs. Planning and developing a site brings a number of country, probalby regional specific costs. Similar to that are costs for operation and maintenance. All different cost categories play a role for individual projects, while big difference between countries due to different framework conditition might occur. A clear cost analysis upfront is highy recommended.<br/>
+
'''Micro-Hydro Power (MHP)''' projects come along with a big variety of costs. Planning and developing a site brings a number of country, probably regional specific costs. Similar to that are costs for operation and maintenance. All different cost categories play a role for individual projects, while big difference between countries due to different framework condition might occur. A clear cost analysis upfront is highly recommended.<br/>
  
 
== Cost factors are eventually: ==
 
== Cost factors are eventually: ==
Line 16: Line 16:
 
<u>power grid</u> (evtl. transformers, powerlines, house-cabeling, load limiters, meter installation, ...)
 
<u>power grid</u> (evtl. transformers, powerlines, house-cabeling, load limiters, meter installation, ...)
  
<u>opperation & maintenance</u> (collecting tarrifs, running and maintaining the assets)
+
<u>operation & maintenance</u> (collecting tariffs, running and maintaining the assets)
  
 
== Some remarks regarding costs: ==
 
== Some remarks regarding costs: ==
Line 40: Line 40:
  
 
= Further Information =
 
= Further Information =
 +
 +
*[[Portal:Hydro|Portal:Hydro]]<br/>
 +
*[[Micro-Hydro_Power_-_Analysis_of_Costs|Micro-Hydro Power - Analysis of Costs]]<br/>
 +
*[[Micro-Hydropower_Plants_-_Estimation_of_Management_Costs|Micro-Hydropower Plants - Estimation of Management Costs]]
  
 
= References<br/> =
 
= References<br/> =
Line 45: Line 49:
 
<references />
 
<references />
  
 +
[[Category:Financing_and_Funding]]
 +
[[Category:Rwanda]]
 +
[[Category:Hydro]]
 
[[Category:Micro_Hydro]]
 
[[Category:Micro_Hydro]]
[[Category:Hydro]]
 
[[Category:Rwanda]]
 
[[Category:Financing_and_Funding]]
 

Revision as of 13:58, 30 July 2014

Overview

Micro-Hydro Power (MHP) projects come along with a big variety of costs. Planning and developing a site brings a number of country, probably regional specific costs. Similar to that are costs for operation and maintenance. All different cost categories play a role for individual projects, while big difference between countries due to different framework condition might occur. A clear cost analysis upfront is highly recommended.

Cost factors are eventually:

a locations feasibility check by respective personal

land/water ownership/usage

civil construction (canal, wear, intake, pipes, powerhouse)

electro-mechanical equipment (turbine, generator, load controller)

power grid (evtl. transformers, powerlines, house-cabeling, load limiters, meter installation, ...)

operation & maintenance (collecting tariffs, running and maintaining the assets)

Some remarks regarding costs:

Land & water requirements are mostly small. But there may be interference with existing schemes (irrigation) or legal issues to be considered.

Order to delivery of electro-mechanical equipment may take half a year. Ensure to order in time.

Costs for power lines and household connections often require a substantial amount from the overall budged.

Any mhp scheme supplying a group of households has to install fixed procedures to cover operation & maintenance.
This includes the collection of tariffs from each user.



MHP costs in Rwanda


Further Information

References