− | '''Micro-Hydro Power (MHP)''' projects come along with a big variety of costs. Planning and developing a site brings a number of country, | + | '''Micro-Hydro Power (MHP)''' projects come along with a big variety of costs. Planning and developing a site brings a number of country, probably regional specific costs. Similar to that are costs for operation and maintenance. All different cost categories play a role for individual projects, while big difference between countries due to different framework condition might occur. A clear cost analysis upfront is highly recommended.<br/> |
== Cost factors are eventually: == | == Cost factors are eventually: == | ||
Line 16: | Line 16: | ||
<u>power grid</u> (evtl. transformers, powerlines, house-cabeling, load limiters, meter installation, ...) | <u>power grid</u> (evtl. transformers, powerlines, house-cabeling, load limiters, meter installation, ...) | ||
− | <u> | + | <u>operation & maintenance</u> (collecting tariffs, running and maintaining the assets) |
== Some remarks regarding costs: == | == Some remarks regarding costs: == | ||
Line 40: | Line 40: | ||
= Further Information = | = Further Information = | ||
+ | |||
+ | *[[Portal:Hydro|Portal:Hydro]]<br/> | ||
+ | *[[Micro-Hydro_Power_-_Analysis_of_Costs|Micro-Hydro Power - Analysis of Costs]]<br/> | ||
+ | *[[Micro-Hydropower_Plants_-_Estimation_of_Management_Costs|Micro-Hydropower Plants - Estimation of Management Costs]] | ||
= References<br/> = | = References<br/> = | ||
Line 45: | Line 49: | ||
<references /> | <references /> | ||
+ | [[Category:Financing_and_Funding]] | ||
+ | [[Category:Rwanda]] | ||
+ | [[Category:Hydro]] | ||
[[Category:Micro_Hydro]] | [[Category:Micro_Hydro]] | ||
− | |||
− | |||
− |
Revision as of 13:58, 30 July 2014
Overview
Micro-Hydro Power (MHP) projects come along with a big variety of costs. Planning and developing a site brings a number of country, probably regional specific costs. Similar to that are costs for operation and maintenance. All different cost categories play a role for individual projects, while big difference between countries due to different framework condition might occur. A clear cost analysis upfront is highly recommended.
Cost factors are eventually:
a locations feasibility check by respective personal
land/water ownership/usage
civil construction (canal, wear, intake, pipes, powerhouse)
electro-mechanical equipment (turbine, generator, load controller)
power grid (evtl. transformers, powerlines, house-cabeling, load limiters, meter installation, ...)
operation & maintenance (collecting tariffs, running and maintaining the assets)
Some remarks regarding costs:
Land & water requirements are mostly small. But there may be interference with existing schemes (irrigation) or legal issues to be considered.
Order to delivery of electro-mechanical equipment may take half a year. Ensure to order in time.
Costs for power lines and household connections often require a substantial amount from the overall budged.
Any mhp scheme supplying a group of households has to install fixed procedures to cover operation & maintenance.
This includes the collection of tariffs from each user.
MHP costs in Rwanda
- in Rwanda in 2011 various cost categories for MHP were analysed.
- A special chapter about the management costs was developed, too.
Further Information
- Portal:Hydro
- Micro-Hydro Power - Analysis of Costs
- Micro-Hydropower Plants - Estimation of Management Costs