(New page: Operation and maintenance (O+M) procedures must be planned and put into action in the initial stages of any scheme to prevent breakdowns and reduced power outputs. The failure to use O+M p...)
 
***** (***** | *****)
Line 1: Line 1:
Operation and maintenance (O+M) procedures must be planned and put into action in the initial stages of any scheme to prevent breakdowns and reduced power outputs. The failure to use O+M procedures will result in financial problems and loss of confidence in the value of micro-hydro. The design engineer, the equipment installers and the users of the scheme, all have important parts to play in the O+M of micro-hydro schemes. <br>
+
Operation and maintenance (O+M) procedures must be planned and put into action in the initial stages of any scheme to prevent breakdowns and reduced power outputs. The failure to use O+M procedures will result in financial problems and loss of confidence in the value of micro-hydro. The design engineer, the equipment installers and the users of the scheme, all have important parts to play in the O+M of micro-hydro schemes. <br>  
 +
 
 +
<br>
 +
 
 +
Further reading:
 +
 
 +
''Micro-hydro design manual: A guide to small-scale water power schemes'' by Adam Harvey, Allen Inversin, Andy Brown, Priyantha Hettiarachi (1993)

Revision as of 19:41, 14 June 2009

Operation and maintenance (O+M) procedures must be planned and put into action in the initial stages of any scheme to prevent breakdowns and reduced power outputs. The failure to use O+M procedures will result in financial problems and loss of confidence in the value of micro-hydro. The design engineer, the equipment installers and the users of the scheme, all have important parts to play in the O+M of micro-hydro schemes.


Further reading:

Micro-hydro design manual: A guide to small-scale water power schemes by Adam Harvey, Allen Inversin, Andy Brown, Priyantha Hettiarachi (1993)