Difference between revisions of "Solar Pre-feasibility Report"
***** (***** | *****) |
***** (***** | *****) |
||
(2 intermediate revisions by one other user not shown) | |||
Line 1: | Line 1: | ||
− | |||
− | + | = Overview = | |
− | + | A prefeasibility study (of a project) is a preliminary analysis undertaken to determine whether it would be worthwhile to proceed to the feasibility study stage. <ref name="http://www.businessdictionary.com/">BusinessDictionary.com</ref> The pre-feasibility study builds confidence among stakeholders and potential users of a project.<br/> | |
− | <br/> | + | <br/>Putting it in perspective, investing in a solar plant (whether Rooftop PV or solar farm) requires considerable amount of time, resources and investment. So whether you are a homeowner wanting to install a 1 kW solar plant on your roof or a large company investing in a Utility scale Megawatt (MW) size solar farm, the first question that would come to mind is whether the investment is worthwhile. This is where pre-feasibility analysis comes into action. |
− | + | There is a lot more to it but the process can be broadly categorized into 3 simple steps: | |
− | + | == <br/>Step 1: Pre-feasibility Analysis<br/> == | |
− | + | *Determination of Solar and Climate data to understand potential electricity output | |
+ | *Determination of system size which includes number of Solar PV panels, inverters, batteries, etc | ||
+ | *Cost of the system | ||
+ | *Return on Investment | ||
− | + | After the pre-feasibility analysis is performed and if the project looks favourable, the next step is to go a bit further and consider even the macro-environmental factors. This is the feasibility stage and some of its components are listed below. | |
− | + | == Step 2: Feasibility Analysis<br/> == | |
− | + | *Solar/Climate data using ground mounted measuring instruments | |
+ | *Land acquisition | ||
+ | *Company strength and track record | ||
+ | *Joint Venture (optional) in place | ||
+ | *PPA (Power Purchase Agreement) with the local Utility | ||
+ | *Government approvals | ||
+ | *Forest / Village approvals | ||
+ | *Technical feasibility | ||
+ | *Financial feasibility, etc. | ||
− | + | == Step 3 – Execution == | |
− | + | The execution part is a lengthy topic in itself and is not the intention of this article so will not delve any deeper. | |
− | |||
− | + | = Further Information = | |
+ | * [[Portal:Solar|Portal:Solar]] | ||
+ | * [[3_Benefits_of_Going_Solar|3 Benefits of Going Solar]] | ||
+ | * [[Resource Assessment - Solar|Resource Assessment - Solar]] | ||
+ | |||
+ | [[Category:Solar]] | ||
+ | |||
+ | = References = | ||
+ | |||
+ | <references /><br/> | ||
+ | |||
+ | *[http://www.helicalpower.com/ www.helicalpower.com/]<br/> | ||
+ | |||
+ | [[Category:Solar]] |
Latest revision as of 00:09, 16 August 2016
Overview
A prefeasibility study (of a project) is a preliminary analysis undertaken to determine whether it would be worthwhile to proceed to the feasibility study stage. [1] The pre-feasibility study builds confidence among stakeholders and potential users of a project.
Putting it in perspective, investing in a solar plant (whether Rooftop PV or solar farm) requires considerable amount of time, resources and investment. So whether you are a homeowner wanting to install a 1 kW solar plant on your roof or a large company investing in a Utility scale Megawatt (MW) size solar farm, the first question that would come to mind is whether the investment is worthwhile. This is where pre-feasibility analysis comes into action.
There is a lot more to it but the process can be broadly categorized into 3 simple steps:
Step 1: Pre-feasibility Analysis
- Determination of Solar and Climate data to understand potential electricity output
- Determination of system size which includes number of Solar PV panels, inverters, batteries, etc
- Cost of the system
- Return on Investment
After the pre-feasibility analysis is performed and if the project looks favourable, the next step is to go a bit further and consider even the macro-environmental factors. This is the feasibility stage and some of its components are listed below.
Step 2: Feasibility Analysis
- Solar/Climate data using ground mounted measuring instruments
- Land acquisition
- Company strength and track record
- Joint Venture (optional) in place
- PPA (Power Purchase Agreement) with the local Utility
- Government approvals
- Forest / Village approvals
- Technical feasibility
- Financial feasibility, etc.
Step 3 – Execution
The execution part is a lengthy topic in itself and is not the intention of this article so will not delve any deeper.
Further Information