The calculation of the wind resources on-site and the corresponding energy production are based on the [[Assessing wind potentials|assessment of wind potentials]] by anemometric measurement. The wind data is processed software packages to calculate the expected wind energy yield for the proposed site.&nbsp;<br>
 
  
== Meteorology <br>  ==
+
[[Portal:Wind|► Back to Wind Portal]]
  
Generally, wind flows are large-scale balancing air movements in the atmosphere between high pressure and low pressure-areas, in some cases superposed by local balancing movements. The pressure differences are caused, and driven by, the solar heating of the Earth s atmosphere, landmasses and water bodies. Warm air is rising, leaving a low pressure area at the surface and causing high pressure areas within higher layers of the atmosphere where the air is cooling down and falling to lower layers with respective pressure effects. <br>
+
= Overview =
  
Since the balancing air movements also run near the earth s surface they are significantly affected by the surface roughness and the orographic terrain structure. <br>  
+
The calculation of the wind resources on-site and the corresponding energy production are based on the [[Assessing Wind Potentials|assessment of wind potentials]] by anemometric measurement. The wind data is processed by software packages to calculate the expected wind energy yield for the proposed site<ref>The contents of this article have been prepared by the project team of the feasibility study of the Ethiopian wind park Ashegoda, conducted by the Deutsche Gesellschaft für internationale Zusammenarbeit (GIZ) in cooperation with the Austrian development agency and Lahmeyer international. Originally the contents have been published as: GTZ (2006) Feasibility Study for Wind Park Development in Ethiopia and Capacity Building - Ashegoda Wind Park Site), retrieved 11.7.2011 [[http://www.gtz.de/de/dokumente/en-feasibility-study-wind-park-ashegoda-2006.pdf]]</ref>.<br/>
  
Roughness is a quantitative description for the friction of the surface causing a slowdown of the near-surface air flow. Water and land without vegetation has a low roughness and therefore a minimal effect to the wind, forests or cities have a high roughness.<br>  
+
<br/>
  
On top of a hill, the air flow is compressed and thus the wind has a higher energy density compared to the same air flow over flat terrain. Furthermore, valleys and similar terrain structures can act as a blast pipe, concentrating the air flow. Behind mountain ridges and inside valleys the air flow is disturbed by recirculation and shading effects.<br>  
+
= Meteorology<br/> =
  
The influence of the topography is shown in the energy calculation results in Annex C 2 in Production Analysis&nbsp;<br>
+
Generally, wind flows are large-scale balancing air movements in the atmosphere between high pressure and low pressure-areas, in some cases superposed by local balancing movements. The pressure differences are caused, and driven by, the solar heating of the Earths atmosphere, landmasses and water bodies. Warm air is rising, leaving a low pressure area at the surface and causing high pressure areas within higher layers of the atmosphere where the air is cooling down and falling to lower layers with respective pressure effects.
  
=== Software Basics <br>  ===
+
Since the balancing air movements also run near the earth's surface they are significantly affected by the surface roughness and the orographic terrain structure.
  
==== WindPro <br>  ====
+
Roughness is a quantitative description for the friction of the surface causing a slowdown of the near-surface air flow. Water and land without vegetation has a low roughness and therefore a minimal effect to the wind, forests or cities have a high roughness.
  
The WindPRO philosophy is object orientated projecting. A wind park project consists of a number of objects, whereby the wind turbines are key elements. Objects are: wind turbines, wind monitoring stations, local obstacles etc. Some of the objects directly determine the wind energy, others focus on the environmental aspects and yet some others can also influence the feasibility of the project. The characteristics of the objects are combined with the terrain data such as the surface roughness maps and the height level contour lines and serve as basic input data for the energy calculations with WAsP, which is the WindPRO integrated meteorological simulation model.&nbsp;<br>  
+
On top of a hill, the air flow is compressed and thus the wind has a higher energy density compared to the same air flow over flat terrain. Furthermore, valleys and similar terrain structures can act as a blast pipe, concentrating the air flow. Behind mountain ridges and inside valleys the air flow is disturbed by recirculation and shading effects.<br/>
  
==== WAsP <br>  ====
+
[[Estimation_of_Wind_Energy_Production#toc|►Go to Top]]
  
WAsP is a software program for predicting wind climate and energy yield of wind turbines. The predictions are based on wind data measured on site or from stations in the same region and considers the effects of the surrounding terrain to the wind flow (topography, surface description, obstacles).&nbsp;WAsP uses the wind atlas methodology. In a first step the influence of the terrain to the wind flow is calculated, creating a generalised regional wind climate. <br>  
+
== Software Basics<br/> ==
  
In a reverse process, this generalised regional wind climate (called wind statistic) is then applied to topography, surface description and obstacles at the vicinity of each individual wind turbine, providing the wind flow at this point even if the wind data has measured in some distance which can be, depending on the terrain, up to several kilometres. <br>  
+
=== WindPro<br/> ===
  
== Model Input Parameters <br> ==
+
The WindPRO philosophy is object orientated projecting. A wind park project consists of a number of objects, whereby the wind turbines are key elements. Objects are: wind turbines, wind monitoring stations, local obstacles etc. Some of the objects directly determine the wind energy, others focus on the environmental aspects and yet some others can also influence the feasibility of the project. The characteristics of the objects are combined with the terrain data such as the surface roughness maps and the height level contour lines and serve as basic input data for the energy calculations with WAsP, which is the WindPRO integrated meteorological simulation model<ref>EMDinternational (2010) WindPro users manual, retrieved 26.7.2011 [[http://help.emd.dk/knowledgebase/content/WindPRO2.7/03-UK_WindPRO2.7_ENERGY.pdf]]</ref>.<br/>
  
Besides the processed wind data, important input parameters for the energy yield calculation model are as described the terrain description, comprising of the orographical (topographical) model and the description of the earth´s surface (roughness description). <br>
+
[[Estimation_of_Wind_Energy_Production#toc|►Go to Top]]
  
==== Orography <br> ====
+
=== WAsP<br/> ===
  
A method to gather data describing the orographical terrain is the analysis of data collected by satellites. As an example the SRTM -Shuttle Radar Topography Mission data base – provided by the US Geological Survey – scanned the earth´s surface between 60° latitude north and 54° latitude south, with a resolution of 90 x 90 m.  
+
WAsP is a software program for predicting wind climate and energy yield of wind turbines. The predictions are based on wind data measured on site or from stations in the same region and considers the effects of the surrounding terrain to the wind flow (topography, surface description, obstacles). WAsP uses the wind atlas methodology. In a first step the influence of the terrain to the wind flow is calculated, creating a generalised regional wind climate.
  
The data in between these points can be interpolated using the WindPro software to gain the topographical model of the proposed site, with a height contour density of 5 metres, as shown in Figure 1 (the example shows the orographic map of the Ashegoda site in Ethipia, where a feasibility study for a wind park has been conducted by German Technical Cooperation (GTZ)).  
+
In a reverse process, this generalised regional wind climate (called wind statistic) is then applied to topography, surface description and obstacles at the vicinity of each individual wind turbine, providing the wind flow at this point even if the wind data has measured in some distance which can be, depending on the terrain, up to several kilometres<ref>Mortensen N. G., Landberg L., Troen I.,fckLRPetersen E. L., Rathmann O. and Nielsen M.(2004) WAsP Utility Programs, retrieved 25.7.2011 [[http://www.wasp.dk/Download/DownloadFiles/General/WUPs30.pdf]]</ref>.<br/>
  
[[Image:Orographic map of ashegoda.jpg|frame|center|Figure 1: SRTM height contour map of Ashegoda wind park site in Ethiopia]]Besides this advanced method of gathering topographical data, national or regional institutions can be asked for topographical maps of the area. The developers have to take care, whether the maps are available in an appropriate scale. Sources should be compared regarding accuracy and potential failures.
+
[[Estimation_of_Wind_Energy_Production#toc|►Go to Top]]
  
The height data is than processed to a three-dimensional digital elevation model of the wind farm site. An example for the Ashegoda site is shown in figure 2.
+
= Model Input Parameters<br/> =
  
=== [[Image:Three-dimensional digital elevation model of Ashegoda site.jpg|frame|center|Three-dimensional digital elevation model of Ashegoda site, view from south-western direction]] Roughness  ===
+
Besides the processed wind data, important input parameters for the energy yield calculation model are as described the terrain description, comprising of the orographical (topographical) model and the description of the earth´s surface (roughness description).<br/>
  
For the model simulations the roughness classification for the surface in close proximity to the wind farm site is derived from topographical maps, data obtained during site visits as well as aerial photos of the region. A basic description of the roughness classes is given in the following (roughness length is a second roughness description unit), it has to be noted that the roughness class is a defined value which can not be measured directly. The roughness length describes the height where the wind speed in a logarithmic wind profile is becoming zero; the coarser the surface, the higher the roughness length.&nbsp;<br>
+
[[Estimation_of_Wind_Energy_Production#toc|►Go to Top]]
  
{| cellspacing="1" cellpadding="1" border="1" align="center" width="600"
+
== Orography<br/> ==
|+ '''Roughness classes<ref>WindPro Manual</ref>'''
+
 
 +
A method to gather data describing the orographical terrain is the analysis of data collected by satellites. As an example the SRTM -Shuttle Radar Topography Mission data base – provided by the US Geological Survey – scanned the earth´s surface between 60° latitude north and 54° latitude south, with a resolution of 90 x 90 m.
 +
 
 +
The data in between these points can be interpolated using the WindPro software to gain the topographical model of the proposed site, with a height contour density of 5 metres, as shown in Figure 1 (the example shows the orographic map of the Ashegoda site in Ethipia, where a feasibility study for a wind park has been conducted by '''German Technical Cooperation (GTZ)''').<br/>
 +
 
 +
[[File:Orographic map of ashegoda.jpg|frame|center|180px|Figure 1: SRTM height contour map of Ashegoda wind park site in Ethiopia]]Besides this advanced method of gathering topographical data, national or regional institutions can be asked for topographical maps of the area. The developers have to take care, whether the maps are available in an appropriate scale. Sources should be compared regarding accuracy and potential failures.<br/>
 +
 
 +
The height data is than processed to a three-dimensional digital elevation model of the wind farm site. An example for the Ashegoda site is shown in figure 2.
 +
 
 +
[[File:Three-dimensional digital elevation model of Ashegoda site.jpg|frame|center|180px|Figure 2: Three-dimensional digital elevation model of Ashegoda site, view from south-western direction]]
 +
 
 +
[[Estimation_of_Wind_Energy_Production#toc|►Go to Top]]
 +
 
 +
== Roughness ==
 +
 
 +
For the model simulations the roughness classification for the surface in close proximity to the wind farm site is derived from topographical maps, data obtained during site visits as well as aerial photos of the region. A basic description of the roughness classes is given in the following (roughness length is a second roughness description unit), it has to be noted that the roughness class is a defined value which can not be measured directly. The roughness length describes the height where the wind speed in a logarithmic wind profile is becoming zero; the coarser the surface, the higher the roughness length.
 +
 
 +
{| border="1" align="center" cellspacing="1" cellpadding="1" style="width: 100%"
 
|-
 
|-
! scope="col" | Roughness class<br>  
+
! scope="col" style="background-color: rgb(204, 204, 204)" | Roughness class<br/>
! scope="col" | Roughness length<br>  
+
! scope="col" style="background-color: rgb(204, 204, 204)" | Roughness length<br/>
! scope="col" | Relative energy<br>  
+
! scope="col" style="background-color: rgb(204, 204, 204)" | Relative energy<br/>
! scope="col" | Description of surface<br>
+
! scope="col" style="background-color: rgb(204, 204, 204)" | Description of surface<br/>
 
|-
 
|-
| 0<br>  
+
| 0<br/>
| 0,0002<br>  
+
| 0,0002<br/>
| 100<br>  
+
| 100<br/>
| Water areas<br>
+
| Water areas<br/>
 
|-
 
|-
| 0,5<br>  
+
| 0,5<br/>
| 0,0024<br>  
+
| 0,0024<br/>
| 73<br>  
+
| 73<br/>
| Mixed Water and land area of very smooth land<br>
+
| Mixed Water and land area of very smooth land<br/>
 
|-
 
|-
| 1<br>  
+
| 1<br/>
| 0,03<br>  
+
| 0,03<br/>
| 52<br>  
+
| 52<br/>
| Open farmland with no crossing hedges and with scattered buildings. Only smooth hills<br>
+
| Open farmland with no crossing hedges and with scattered buildings. Only smooth hills<br/>
 
|-
 
|-
| 1,5<br>  
+
| 1,5<br/>
| 0,055<br>  
+
| 0,055<br/>
| 45<br>  
+
| 45<br/>
| Farmland with some buildings and crossing hedges of 8m height and about 1250 m apart.<br>
+
| Farmland with some buildings and crossing hedges of 8m height and about 1250 m apart.<br/>
 
|-
 
|-
| 2<br>  
+
| 2<br/>
| 0,10<br>  
+
| 0,10<br/>
| 39<br>  
+
| 39<br/>
| Farmland with some buildings and crossing hedges of 8m height and about 800 m apart.<br>
+
| Farmland with some buildings and crossing hedges of 8m height and about 800 m apart.<br/>
 
|-
 
|-
| 2,5<br>  
+
| 2,5<br/>
| 0,20<br>  
+
| 0,20<br/>
| 31<br>  
+
| 31<br/>
| Farmland with some buildings and crossing hedges of 8m height and about 250 m apart.<br>
+
| Farmland with some buildings and crossing hedges of 8m height and about 250 m apart.<br/>
 
|-
 
|-
| 3<br>  
+
| 3<br/>
| 0,40<br>  
+
| 0,40<br/>
| 24<br>  
+
| 24<br/>
| Villages, small towns, very closed farmladn with many or high hedges, Forrest, many abrupt orographic changes. <br>
+
| Villages, small towns, very closed farmladn with many or high hedges, Forrest, many abrupt orographic changes.<br/>
 
|-
 
|-
| 3,5<br>  
+
| 3,5<br/>
| 0,80<br>  
+
| 0,80<br/>
| 18<br>  
+
| 18<br/>
| Large towns, cities with extended build-up areas<br>
+
| Large towns, cities with extended build-up areas<br/>
 
|-
 
|-
| 4<br>  
+
| 4<br/>
| 1,6<br>  
+
| 1,6<br/>
| 13<br>  
+
| 13<br/>
| Large cities with build-up areas and high buildings <br>
+
| Large cities with build-up areas and high buildings<br/>
 
|}
 
|}
  
<br>  
+
<br/>
 +
 
 +
As an example for a roughness description the map of Ashegoda site is presented in the following Figure 3.
 +
 
 +
[[File:Roughness Description of Ashegoda wind park site.jpg|frame|center|180px|Figure 3: Roughness map for Ashegoda wind park site in Ethiopia]]
 +
 
 +
[[Estimation_of_Wind_Energy_Production#toc|►Go to Top]]
 +
 
 +
== Wind Shear ==
 +
 
 +
In many [[Assessing Wind Potentials|assessments of the wind potential]] the upper anemometers of the wind measurement are installed at a height of 40 m above ground while the hub height of modern wind turbines today often reaches heights between 55 m and 60 m above ground level. To estimate the wind regime at hub height of the wind turbines (the WAsP model simplifies the wind speed distribution over the rotor as concentrated to the hub height) the wind speed is extrapolated according to the following formula:
 +
 
 +
<br/>
  
As an example for a roughness description the map of Ashegoda site is presented in the following Figure 3.&nbsp;
+
Whereas <span class="texhtml">γ</span> is the Power Law Exponent or Wind Gradient which is depending on the roughness of the terrain, the thermical lamination of the atmosphere, the wind speed itself and the height above ground. The exponent must be calculated sectorwise for the wind park site. This can be done by the WindPro-Software package from the measured wind data at the heights of 10 m a.g.l. respectively 40 m a.g.l..
  
[[Image:Roughness Description of Ashegoda wind park site.jpg|frame|center|Figure 3: Roughness map for Ashegoda wind park site in Ethiopia]]
+
The wind gradients for the twelve wind distribution sectors describe the wind speed at different heights for all wind directions diveded in sectors of 30°. An example for a calculated wind profile (increase of the wind speed with height) for the main wind direction of this site (sector south-southeast) is displayed in Figure 4.
  
=== Wind Shear  ===
+
[[File:Wind profile of Ashegoda wind park site.jpg|frame|right|180px|Figure 4:Wind profile of Ashegoda wind park site (main wind direction south-southeast)]]Combining considerations of terrain and roughness, the wind profile for the area of each individual wind turbine is then calculated by WAsP. The extrapolation from 40 m measuring height to 60 m hub height can be considered as reasonable but a further increase of the wind speed for hub heights of 80 m and more is not stringent as the power law is not suitable for height extrapolations over this range.
  
In many [[Assessing wind potentials|assessments of the wind potential]] the upper anemometers of the wind measurement are installed at a height of 40 m above ground while the hub height of modern wind turbines today often reaches heights between 55 m and 60 m above ground level. To estimate the wind regime at hub height of the wind turbines (the WAsP model simplifies the wind speed distribution over the rotor as concentrated to the hub height) the wind speed is extrapolated according to the following formula:
+
[[Estimation_of_Wind_Energy_Production#toc|►Go to Top]]
  
<math>v_{new}=v_{old} \cdot (\frac{h_{new}}{h_{old}})^\gamma</math>
+
== Wind Turbine Parameters ==
  
Whereas&nbsp;<math>\gamma</math> is the Power Law Exponent or Wind Gradient which is depending on the roughness of the terrain, the thermical lamination of the atmosphere, the wind speed itself and the height above ground. The exponent must be calculated sectorwise for the wind park site. This can be done by the WindPro-Software package from the measured wind data at the heights of 10 m a.g.l. respectively 40 m a.g.l..  
+
To estimate the performance of different turbine types for the development of a new project usually several scenarios using different turbine types are calculated. Important turbine parameters, which should be included are hub height, nominal power and rotor diameter.
  
The wind gradients for the twelve wind distribution sectors describe the wind speed at different heights for all wind directions diveded in sectors of 30°. An example for a calculated wind profile (increase of the wind speed with height) for the main wind direction of this site (sector south-southeast) is displayed in Figure 5.
+
[[Estimation_of_Wind_Energy_Production#toc|►Go to Top]]
  
[[Image:Wind profile of Ashegoda wind park site.jpg|frame|right|Figure 4:Wind profile of Ashegoda wind park site (main wind direction south-southeast)]]Combining considerations of terrain and roughness, the wind profile for the area of each individual wind turbine is then calculated by WAsP. The extrapolation from 40 m measuring height to 60 m hub height can be considered as reasonable but a further increase of the wind speed for hub heights of 80 m and more is not stringent as the power law is not suitable for height extrapolations over this range.&nbsp;
+
== Power Curve and Air Density ==
  
=== Wind Turbine Parameters  ===
+
The Power curve of a wind turbine is an important parameter, describing the relation between the wind speed on site and the respective electrical energy output. Power curves and ct-values (a parameter for the calculation of the wake effect) of the turbines under consideration are applied for the energy calculation. Power curves which had been measured by independent institutions are of higher quality than calculated ones. Due to the fluctuations of both the characteristics of the wind turbine components, and the measuring conditions power curves of different measurements differing slightly between each other.
  
To estimate the performance of different turbine types for the development of a new project usually several scenarios using different turbine types are calculated. Important turbine parameters, which should be included are hub height, nominal power and rotor diameter.  
+
Several manufacturers are thus providing power curves which are calculated from the results of several measured ones; the performance of these calculated power curves might be contractually guaranteed by the manufacturers.
  
=== Power Curve and Air Density  ===
+
During the calculation of the energy yield, the power curves, given for the standard conditions of air density = 1.225 kg/m<sup>3</sup> are adapted to the air density of each individual turbine location at hub height, with the transformed power curves for the average air density. The air density can be calculated by WindPro for each individual wind turbine according to the site conditions, height above sea level plus the hub height of the turbines (e.g. 57 m / 60 m) and an annual average temperature level. As verification, the calculated adaptations for air density at the turbine sites should be compared to information provided by nearby meteorological stations. Figure 5 shows the power curves of several wind turbines at an air density of <span class="texhtml">ρ = 1,225''kg''/ ''m''<sup>3</sup></span>.
  
The Power curve of a wind turbine is an important parameter, describing the relation between the wind speed on site and the respective electrical energy output. Power curves and ct-values (a parameter for the calculation of the wake effect) of the turbines under consideration are applied for the energy calculation. Power curves which had been measured by independent institutions are of higher quality than calculated ones. Due to the fluctuations of both the characteristics of the wind turbine components, and the measuring conditions power curves of different measurements differing slightly between each other.
+
[[File:Power curves for wind turbines proposed Ethiopian wind project.jpg|frame|center|180px|Figure 5: Power curves for wind turbines proposed for the Ashegoda wind park in Ethiopia]]
  
Several manufacturers are thus providing power curves which are calculated from the results of several measured ones; the performance of these calculated power curves might be contractually guaranteed by the manufacturers.  
+
As can be clearly seen, the Enercon E-53 and Gamesa G-58 wind turbines are generating more energy in the wind speed range from about 6 m/s to 12 m/s which occur more frequently then the other wind speed ranges, see the Weibull-distribution in Figure 6 This is mainly caused by be larger rotor diameter compared to the Enercon E-48 and Vestas V52 wind turbines.
  
During the calculation of the energy yield, the power curves, given for the standard conditions of air density = 1.225 kg/m3 are adapted to the air density of each individual turbine location at hub height, with the transformed power curves for the average air density. The air density can be calculated by WindPro for each individual wind turbine according to the site conditions, height above sea level plus the hub height of the turbines (e.g. 57 m / 60 m) and an annual average temperature level. As verification, the calculated adaptations for air density at the turbine sites should be compared to information provided by nearby meteorological stations. Figure 5 shows the power curves of several wind turbines at an air density of <math>\rho=1,225 kg /m^3</math>.
+
[[File:Weibull-distribution for Ashegoda wind project site.jpg|frame|center|180px|Figure 6: Weibull distribution for Ashegoda wind project site]] [[Estimation_of_Wind_Energy_Production#toc|►Go to Top]]
  
[[Image:Power curves for wind turbines proposed Ethiopian wind project.jpg|frame|center|Power curves for wind turbines proposed for the Ashegoda wind park in Ethiopia]]
+
= Losses and Uncertainties<br/> =
  
As can be clearly seen, the Enercon E-53 and Gamesa G-58 wind turbines are generating more energy in the wind speed range from about 6 m/s to 12 m/s which occur more frequently then the other wind speed ranges, see the Weibull-distribution in Figure 7 This is mainly caused by be larger rotor diameter compared to the Enercon E-48 and Vestas V52 wind turbines. <br>
+
Meteorological phenomena can only be predicted to a certain limited degree. As a consequence it is not possible to make an exact forecast of the wind conditions even if longterm reference data (which can only represent the past) is used. Furthermore, data collection and processing is always afflicted with errors and inaccuracies as is every mathematical or physical model used to describe or predict real procedures. To compensate the inaccuracies in modelling approach and basic input data, it is advisable to use factors of safety to adjust, or discount the final output. Two blocks determine the factors of safety: losses and uncertainties.
  
== [[Image:Weibull-distribution for Ashegoda wind project site.jpg|frame|center|Figure 7: Weibull distribution for Ashegoda wind project site]]Losses and Uncertainties <br>  ==
+
[[Estimation_of_Wind_Energy_Production#toc|►Go to Top]]
  
Meteorological phenomena can only be predicted to a certain limited degree. As a consequence it is not possible to make an exact forecast of the wind conditions even if longterm reference data (which can only represent the past) is used. Furthermore, data collection and processing is always afflicted with errors and inaccuracies as is every mathematical or physical model used to describe or predict real procedures. To compensate the inaccuracies in modelling approach and basic input data, it is advisable to use factors of safety to adjust, or discount the final output. Two blocks determine the factors of safety: losses and uncertainties.
+
== Losses<br/> ==
  
=== Losses <br>  ===
+
Losses are found on the whole energetic transformation chain from the rotor (kinetic energy) to the substation (electrical energy). The losses are simple add-ups to the total reduction of the calculated energy yield. In detail:
  
Losses are found on the whole energetic transformation chain from the rotor (kinetic energy) to the substation (electrical energy). The losses are simple add-ups to the total reduction of the calculated energy yield. In detail:
+
[[Estimation_of_Wind_Energy_Production#toc|►Go to Top]]
  
==== Park Efficiency ====
+
=== Park Efficiency ===
  
After passing the rotor of a wind turbine, the wind has a decreased speed due to the kinetic energy taken away by the rotor and increased turbulence caused by the rotating rotor and the difference in speed compared to the undisturbed flow. Until the speed difference to undisturbed flow is not equalised, the result is a lower energy yield for the wind turbines following in the direction of the flow. These losses are called array or wake losses.  
+
After passing the rotor of a wind turbine, the wind has a decreased speed due to the kinetic energy taken away by the rotor and increased turbulence caused by the rotating rotor and the difference in speed compared to the undisturbed flow. Until the speed difference to undisturbed flow is not equalised, the result is a lower energy yield for the wind turbines following in the direction of the flow. These losses are called array or wake losses.
  
==== Turbine Availability  ====
+
[[Estimation_of_Wind_Energy_Production#toc|►Go to Top]]
  
The turbine availability is the percentage of a year (i.e. 8760 hours) where the turbine is able to generate electrical energy while being connected to the grid. Reasons for the non-availability of a wind turbine are various, and include downtimes for regular maintenance and servicing, component failures (including defect sensors), overheating of components, repairs or exchange of components, as well as errors and downtimes of the superior electrical grid. The turbine availability can be set to a value by taking into account the experience in the operation of windturbines in the region and skills of local staff. For a country without experiences and a high need for capacity building during the first years of a project a standard value of 95&nbsp;% can be applied. Later on and after the first years of sufficient turbine availability averages, the aim should be to raise the level up to 97&nbsp;% which could be seen as a good value for the first wind parks in a country with few experiences in wind turbine operation. A common value for countries with a very established wind energy industry, an availability of 98&nbsp;% is assumed.
+
=== Turbine Availability ===
  
==== Electrical Losses  ====
+
The turbine availability is the percentage of a year (i.e. 8760 hours) where the turbine is able to generate electrical energy while being connected to the grid. Reasons for the non-availability of a wind turbine are various, and include downtimes for regular maintenance and servicing, component failures (including defect sensors), overheating of components, repairs or exchange of components, as well as errors and downtimes of the superior electrical grid. The turbine availability can be set to a value by taking into account the experience in the operation of windturbines in the region and skills of local staff. For a country without experiences and a high need for capacity building during the first years of a project a standard value of 95 % can be applied. Later on and after the first years of sufficient turbine availability averages, the aim should be to raise the level up to 97 % which could be seen as a good value for the first wind parks in a country with few experiences in wind turbine operation. A common value for countries with a very established wind energy industry, an availability of 98 % is assumed.
  
The electrical losses depend on the resistance of the conductors and on the current intensity. To assess the current intensity of the wind park the following methodology is used: the duration curve of the wind park for one year is approximated by a two stage approach. For 10% of the year (876 hours) full power is assumed and for the rest of the year (7,884 hours) the load is estimated to 25% of full load.
+
[[Estimation_of_Wind_Energy_Production#toc|►Go to Top]]
  
For this power pattern of the wind park, the turbine current is derived and the losses for the internal wind park cabling, and for the wind park cabling connection to the substation are calculated relative to the total energy output. For the Ashegoda wind park in Ethiopia the following values have been calculated:
+
=== Electrical Losses ===
  
*internal park cabling: 0.2%  
+
The electrical losses depend on the resistance of the conductors and on the current intensity. To assess the current intensity of the wind park the following methodology is used: the duration curve of the wind park for one year is approximated by a two stage approach. For 10% of the year (876 hours) full power is assumed and for the rest of the year (7,884 hours) the load is estimated to 25% of full load.
*internal park transmission lines: 0.5%  
+
 
*turbine transformers: 1.1%  
+
For this power pattern of the wind park, the turbine current is derived and the losses for the internal wind park cabling, and for the wind park cabling connection to the substation are calculated relative to the total energy output.
*transmission line 230kV: 0.5%  
+
 
 +
<u>For the Ashegoda wind park in Ethiopia the following values have been calculated:</u>
 +
*internal park cabling: 0.2%
 +
*internal park transmission lines: 0.5%
 +
*turbine transformers: 1.1%
 +
*transmission line 230kV: 0.5%
 
*substation transformer 0.5%
 
*substation transformer 0.5%
  
The total electrical losses of the park are estimated at 2.8% of that amount of electricity which is produced by the wind turbines.  
+
The total electrical losses of the park are estimated at 2.8% of that amount of electricity which is produced by the wind turbines.
 +
 
 +
[[Estimation_of_Wind_Energy_Production#toc|►Go to Top]]
 +
 
 +
=== Miscellaneous Losses ===
 +
 
 +
In addition to the transmission losses and lost production due to reduced availability a number of other losses should be taken into account. The aerodynamic turbine performance described by the power curve is strongly depending on the profile and surface of the wind rotor blades. Blade fouling from dirt or insects on the surface of the blades lead to non-expected change of airfoil characteristics and to lower energy yield. Whether a change of blade characteristics has to be expected, depends on climatic conditions like humidity. For example an average air density of a temperature of 17° in 2.400 m above sea level provides no thermal problems for the wind turbines. No effect of the low air density is to be expected than the reduced energy production.
 +
 
 +
High wind control losses are caused by the turbine cut-in and cut-out strategy. The turbines will cut-off when cut-out wind speed is reached and will not re-cut-in until wind speed is below a defined wind speed level, lower than the cut-out level. A reduction factor of 0.1% to the gross energy output was applied to take these effects into account.
 +
 
 +
[[Estimation_of_Wind_Energy_Production#toc|►Go to Top]]
 +
 
 +
== Wind Speed related Uncertainties ==
  
==== Miscellaneous Losses  ====
+
Uncertainties cover the inaccuracy of the data processing from the measurement, the internal data processing and the long-term prediction. A percentage value describes the standard deviation of scattering results around the expected true value. For the energy calculation, these wind speed-related uncertainty values have to be transformed to the energy production level. Additional uncertainties have to be determined for modelling and mathematical algorithms.
  
In addition to the transmission losses and lost production due to reduced availability a number of other losses should be taken into account. The aerodynamic turbine performance described by the power curve is strongly depending on the profile and surface of the wind rotor blades. Blade fouling from dirt or insects on the surface of the blades lead to non-expected change of airfoil characteristics and to lower energy yield. Whether a change of blade characteristics has to be expected, depends on climatic conditions like humidity. For example an average air density of a temperature of 17° in 2.400 m above sea level provides no thermal problems for the wind turbines. No effect of the low air density is to be expected than the reduced energy production.
+
[[Estimation_of_Wind_Energy_Production#toc|►Go to Top]]
  
High wind control losses are caused by the turbine cut-in and cut-out strategy. The turbines will cut-off when cut-out wind speed is reached and will not re-cut-in until wind speed is below a defined wind speed level, lower than the cut-out level. A reduction factor of 0.1% to the gross energy output was applied to take these effects into account.
+
=== Uncertainties of the WAsP-Model ===
  
=== Wind Speed related Uncertainties  ===
+
The WAsP (Wind Atlas Analysis and Application Program) software is a proven tool used in the wind industry for more than 15 years. As every model it has limitations and uncertainties mainly due to the simplifications behind it which had been done to handle the calculations on desktop computers in an acceptable time frame. Mesoscalic meteorological models require powerful computers and a calculation time of several days. However, WAsP has been used for a considerable time worldwide and the uncertainties have been evaluated over the years. In case of Ashegoda, the existence of modestly shaped hills and ridges lead to a suffiecient quality of the calculation.
 +
*Transfer Wind to Energy<br/>The discrete wind flow from discrete wind directions is simplified to 10-minute average values for 12 direction sectors and statistically preprocessed before being applied to the power curve.
 +
*Site modelling<br/>Consists basically of two input parameters: the topographical model and the surface description (roughness description).
 +
*Flow modelling<br/>WasP has been developed for use in areas with only modestly shaped hills which is the case at Ashogoda site. The uncertainty of the flow modelling is set to the medium value of 3.0% .
 +
*Wake modelling<br/>The uncertainty of the selected wake model will be low, if the area of the wind farm itself is nearly plain (no additional uncertainties due to the influence of the terrain). In case a high roughness length is found for the terrain, the uncerainty in wake modelling can be much higher.
  
Uncertainties cover the inaccuracy of the data processing from the measurement, the internal data processing and the long-term prediction. A percentage value describes the standard deviation of scattering results around the expected true value. For the energy calculation, these wind speed-related uncertainty values have to be transformed to the energy production level. Additional uncertainties have to be determined for modelling and mathematical algorithms.  
+
To calculate the total uncertainty all single uncertainties can be considered as stochastically independent and the commonly used way of estimating the joint uncertainty of independent (un-correlated) uncertainties is to calculate the RMS (root mean square) value.
  
==== Uncertainties of the WAsP-Model  ====
+
[[Estimation_of_Wind_Energy_Production#toc|►Go to Top]]
  
The WAsP (Wind Atlas Analysis and Application Program) software is a proven tool used in the wind industry for more than 15 years. As every model it has limitations and uncertainties mainly due to the simplifications behind it which had been done to handle the calculations on desktop computers in an acceptable time frame. Mesoscalic meteorological models require powerful computers and a calculation time of several days. However, WAsP has been used for a considerable time worldwide and the uncertainties have been evaluated over the years. In case of Ashegoda, the existence of modestly shaped hills and ridges lead to a suffiecient quality of the calculation.
+
=== Uncertainties of the Wind Data ===
  
*Transfer Wind to Energy <br>The discrete wind flow from discrete wind directions is simplified to 10-minute average values for 12 direction sectors and statistically preprocessed before being applied to the power curve.  
+
The reliability of the WAsP calculation is highly dependent on the quality of the input parameters of which wind data is the most important one. The collection and processing of wind date is subject to several uncertainties.
*Site modelling <br>Consists basically of two input parameters: the topographical model and the surface description (roughness description).  
+
*Anemometer calibration<br/>Anemometers should be calibrated in order to secure that the measured wind speed equals the actual wind speed.
*Flow modelling <br>WasP has been developed for use in areas with only modestly shaped hills which is the case at Ashogoda site. The uncertainty of the flow modelling is set to the medium value of 3.0% .  
+
*Anemometer characteristics<br/>Describes the uncertainty of the quality the anemometer detects the wind flow and processes the values to digital data.
*Wake modelling <br> The uncertainty of the selected wake model will be low, if the area of the wind farm itself is nearly plain (no additional uncertainties due to the influence of the terrain). In case a high roughness length is found for the terrain, the uncerainty in wake modelling can be much higher.
+
*Mounting error<br/>The anemometer has to be vertically mounted. The uncertainty describes the effect if this is not done properly.
 +
*Data recording<br/>Describes the uncertainties related to processing and storage of the data provided by the anemometer and the wind vane in the data logger.
 +
*Terrain description<br/>Describes the uncertainty of the influence of the terrain to the measurement. Inclined wind flow and strong turbulence can not be measured accurately by a cup anemometer.
 +
*Long term correlation<br/>The data used for the long term correlation as well as the MCP-Process includes uncertainties;
  
To calculate the total uncertainty all single uncertainties can be considered as stochastically independent and the commonly used way of estimating the joint uncertainty of independent (un-correlated) uncertainties is to calculate the RMS (root mean square) value.  
+
To calculate the total uncertainty all single uncertainties can be considered as stochastically independent and the commonly used way of estimating the joint uncertainty of independent (un-correlated) uncertainties is to calculate the RMS value.
  
==== Uncertainties of the Wind Data  ====
+
[[Estimation_of_Wind_Energy_Production#toc|►Go to Top]]
  
The reliability of the WAsP calculation is highly dependent on the quality of the input parameters of which wind data is the most important one. The collection and processing of wind date is subject to several uncertainties.
+
=== Uncertainties of the Power Curve ===
  
*Anemometer calibration <br>Anemometers should be calibrated in order to secure that the measured wind speed equals the actual wind speed.  
+
It has to be considered that the power curve used for the gross energy calculation is also subject to uncertainties which had been described in the section 'Power curve and air density'. Due to the non linear relation of mean wind speed and energy these uncertainties can not be integrated into the uncertainties of wind conditions but have to be dealt with separately. In the following section an example for the calculation of the uncertainties of the energy yield for one wind turbine type is given.
*Anemometer characteristics <br>Describes the uncertainty of the quality the anemometer detects the wind flow and processes the values to digital data.&nbsp;
 
*Mounting error <br>The anemometer has to be vertically mounted. The uncertainty describes the effect if this is not done properly.
 
*Data recording <br>Describes the uncertainties related to processing and storage of the data provided by the anemometer and the wind vane in the data logger.
 
*Terrain description <br>Describes the uncertainty of the influence of the terrain to the measurement. Inclined wind flow and strong turbulence can not be measured accurately by a cup anemometer.&nbsp;
 
*Long term correlation <br>The data used for the long term correlation as well as the MCP-Process includes uncertainties;
 
  
To calculate the total uncertainty all single uncertainties can be considered as stochastically independent and the commonly used way of estimating the joint uncertainty of independent (un-correlated) uncertainties is to calculate the RMS value.&nbsp;
+
The uncertainty of the power curve is, assuming the power performance of the turbine as independent of the energy deviation due to wind uncertainties, connected to the uncertainties of the energy yield by the following equation:
  
==== Uncertainties of the Power Curve  ====
+
<br/>
  
It has to be considered that the power curve used for the gross energy calculation is also subject to uncertainties which had been described in the section 'Power curve and air density'. Due to the non linear relation of mean wind speed and energy these uncertainties can not be integrated into the uncertainties of wind conditions but have to be dealt with separately. In the following section an example for the calculation of the uncertainties of the energy yield for one wind turbine type is given.  
+
The turbine supplier usually gives a guarantee of 95 % of the energy values, which leads to an uncertainty to the predicted figures of 5 %; the actual guarantee value has to be negotiated with the manufacturer, the uncertainty can be adapted accordingly. This figure has been taken for every wind turbine type as it is sufficiently conservative for both calculated and measured power curves.
  
The uncertainty of the power curve is, assuming the power performance of the turbine as independent of the energy deviation due to wind uncertainties, connected to the uncertainties of the energy yield by the following equation:
+
[[Estimation_of_Wind_Energy_Production#toc|►Go to Top]]
  
<math>Total\; uncertainty=\sqrt{(uncertainty\; energy\; yield)^2+(uncertainty\; power\; curve)^2}</math>&nbsp;
+
== Uncertainties Energy Yield<br/> ==
  
The turbine supplier usually gives a guarantee of 95&nbsp;% of the energy values, which leads to an uncertainty to the predicted figures of 5&nbsp;%; the actual guarantee value has to be negotiated with the manufacturer, the uncertainty can be adapted accordingly. This figure has been taken for every wind turbine type as it is sufficiently conservative for both calculated and measured power curves. <br>
+
The interpretation of uncertainty in energy yield from the total uncertainty in wind speed is not straightforward. The theoretical cubic relation of wind speed and energy does not give a correct description of the phenomena.
  
=== Uncertainties Energy Yield <br>  ===
+
For the long term mean wind speed averaged over all turbine locations at hub height the average wind speed value is derived from the wind data processing. The uncertainty is equivalent to a reduction to the mean wind speed when considering the worst case. To translate this reduced mean wind speed into energy yield the parameters of a Weibull distribution are adapted and this new Weibull distribution is then applied to the individual turbine power curves. The results for the considered wind park layout can be found in the examinations in the following tables Deviation of Energy due to wind uncertainties, indicating an energy deviation due to the uncertainty in wind speed assessment.
  
The interpretation of uncertainty in energy yield from the total uncertainty in wind speed is not straightforward. The theoretical cubic relation of wind speed and energy does not give a correct description of the phenomena. <br>
+
[[Estimation_of_Wind_Energy_Production#toc|►Go to Top]]
  
For the long term mean wind speed averaged over all turbine locations at hub height the average wind speed value is derived from the wind data processing. The uncertainty is equivalent to a reduction to the mean wind speed when considering the worst case. To translate this reduced mean wind speed into energy yield the parameters of a Weibull distribution are adapted and this new Weibull distribution is then applied to the individual turbine power curves. The results for the considered wind park layout can be found in the examinations in the following tables Deviation of Energy due to wind uncertainties, indicating an energy deviation due to the uncertainty in wind speed assessment. <br>  
+
<br/>
  
==== Calculation of uncertainties in energy yield for a specific wind turbine<br> ====
+
=== Calculation of Uncertainties in Energy Yield for a Specific Wind Turbine<br/> ===
  
The transformation of the wind speed related uncertainties into the energy related uncertainty by appropriately reducing the wind speed at hub height leads to the following results:<br>
+
The transformation of the wind speed related uncertainties into the energy related uncertainty by appropriately reducing the wind speed at hub height leads to the following results:
  
{| cellspacing="1" cellpadding="1" border="1" align="center" width="600"
+
{| border="1" align="center" cellspacing="1" cellpadding="1" style="width: 100%"
|+ '''Deviation of Energy due to wind uncertainties'''
 
 
|-
 
|-
! scope="col" | <br>  
+
! scope="col" | <br/>
! scope="col" | Mean wind speed [m/s]<br>  
+
! scope="col" | Mean wind speed [m/s]<br/>
! scope="col" | Deviation wind speed<br>  
+
! scope="col" | Deviation wind speed<br/>
! scope="col" | A-factor [m/s]<br>  
+
! scope="col" | A-factor [m/s]<br/>
! scope="col" | k-factor<br>  
+
! scope="col" | k-factor<br/>
! scope="col" | Energy Yield [MWh/y]<br>  
+
! scope="col" | Energy Yield [MWh/y]<br/>
! scope="col" | Deviation Energy<br>
+
! scope="col" | Deviation Energy<br/>
 
|-
 
|-
! scope="row" | calculated WAsP<br>  
+
! scope="row" | calculated WAsP<br/>
| 8,84<br>  
+
| 8,84<br/>
| 0,0%<br>  
+
| 0,0%<br/>
| 9,81<br>  
+
| 9,81<br/>
| 3,62<br>  
+
| 3,62<br/>
| 248,854<br>  
+
| 248,854<br/>
| 0,0%<br>
+
| 0,0%<br/>
 
|-
 
|-
! scope="row" | reduced wind speed;<br>uncertainties taken into<br>account<br>  
+
! scope="row" | reduced wind speed;<br/>uncertainties taken into<br/>account<br/>
| 8,35<br>  
+
| 8,35<br/>
| 5,6%<br>  
+
| 5,6%<br/>
| 9,26<br>  
+
| 9,26<br/>
| 3,62<br>  
+
| 3,62<br/>
| 218,642<br>  
+
| 218,642<br/>
| 12,14%<br>
+
| 12,14%<br/>
 
|}
 
|}
  
<br>  
+
<br/>
  
Assuming the power performance of the turbine as independent of the energy deviation due to wind uncertainties, the total uncertainty for energy yield can be determined from the uncertainties of wind conditions and power curve.  
+
Assuming the power performance of the turbine as independent of the energy deviation due to wind uncertainties, the total uncertainty for energy yield can be determined from the uncertainties of wind conditions and power curve.
  
The analysis of uncertainties is an important step for the risk assessment of the project. From the predicted annual energy and from the total uncertainty on the energy level the probability of exceeding of certain energy yields can be calculated by statistical methods. Applying a Gauss process for the statistic analysis, the calculated gross annual energy can be understood as the mean annual energy yield having the highest rate of probability of all single results. The uncertainty shall be understood as standard deviation of the expected results around the most probable event.  
+
The analysis of uncertainties is an important step for the risk assessment of the project. From the predicted annual energy and from the total uncertainty on the energy level the probability of exceeding of certain energy yields can be calculated by statistical methods. Applying a Gauss process for the statistic analysis, the calculated gross annual energy can be understood as the mean annual energy yield having the highest rate of probability of all single results. The uncertainty shall be understood as standard deviation of the expected results around the most probable event.
  
Figure 10 displays the probabilities that a certain amount of annual electricity production is exceeded for the example wind turbine.  
+
Figure 7 displays the probabilities that a certain amount of annual electricity production is exceeded for the example wind turbine.
  
[[Image:Probability of exceedance for Ashegoda wind park.jpg|frame|center|Figure 10: Probability of exceedance of certain energy yields for Ashegoda wind park]]  
+
[[File:Probability of exceedance for Ashegoda wind park.jpg|frame|center|180px|Figure 7: Probability of exceedance of certain energy yields for Ashegoda wind park]]
  
Gross annual energy describes the energy yield as calculated and net annual energy the energy yield considering the losses and uncertainties.  
+
Gross annual energy describes the energy yield as calculated and net annual energy the energy yield considering the losses and uncertainties.
  
Besides the uncertainties for wind conditions and power curve, the losses for electricity transmission (e.g. 2,8&nbsp;%) and reduced availability of the turbines (e.g. 95&nbsp;%) have also to be considered as constant factors, reducing the estimated energy yield.&nbsp;
+
Besides the uncertainties for wind conditions and power curve, the losses for electricity transmission (e.g. 2,8 %) and reduced availability of the turbines (e.g. 95 %) have also to be considered as constant factors, reducing the estimated energy yield.
  
== References<br> ==
+
[[Estimation_of_Wind_Energy_Production#toc|►Go to Top]]
 +
 
 +
<br/>
 +
 
 +
= Further Information =
 +
 
 +
*[[Portal:Wind|Wind Portal on energypedia]]
 +
*[[Assessing Wind Potentials|Assessing Wind Potentials]]<br/>
 +
 
 +
<br/>
 +
 
 +
[[Estimation_of_Wind_Energy_Production#toc|►Go to Top]]
 +
 
 +
= References<br/> =
  
 
<references />
 
<references />
 +
 +
<br/>
 +
 +
[[Category:Wind]]

Latest revision as of 12:30, 29 August 2014

► Back to Wind Portal

Overview

The calculation of the wind resources on-site and the corresponding energy production are based on the assessment of wind potentials by anemometric measurement. The wind data is processed by software packages to calculate the expected wind energy yield for the proposed site[1].


Meteorology

Generally, wind flows are large-scale balancing air movements in the atmosphere between high pressure and low pressure-areas, in some cases superposed by local balancing movements. The pressure differences are caused, and driven by, the solar heating of the Earths atmosphere, landmasses and water bodies. Warm air is rising, leaving a low pressure area at the surface and causing high pressure areas within higher layers of the atmosphere where the air is cooling down and falling to lower layers with respective pressure effects.

Since the balancing air movements also run near the earth's surface they are significantly affected by the surface roughness and the orographic terrain structure.

Roughness is a quantitative description for the friction of the surface causing a slowdown of the near-surface air flow. Water and land without vegetation has a low roughness and therefore a minimal effect to the wind, forests or cities have a high roughness.

On top of a hill, the air flow is compressed and thus the wind has a higher energy density compared to the same air flow over flat terrain. Furthermore, valleys and similar terrain structures can act as a blast pipe, concentrating the air flow. Behind mountain ridges and inside valleys the air flow is disturbed by recirculation and shading effects.

►Go to Top

Software Basics

WindPro

The WindPRO philosophy is object orientated projecting. A wind park project consists of a number of objects, whereby the wind turbines are key elements. Objects are: wind turbines, wind monitoring stations, local obstacles etc. Some of the objects directly determine the wind energy, others focus on the environmental aspects and yet some others can also influence the feasibility of the project. The characteristics of the objects are combined with the terrain data such as the surface roughness maps and the height level contour lines and serve as basic input data for the energy calculations with WAsP, which is the WindPRO integrated meteorological simulation model[2].

►Go to Top

WAsP

WAsP is a software program for predicting wind climate and energy yield of wind turbines. The predictions are based on wind data measured on site or from stations in the same region and considers the effects of the surrounding terrain to the wind flow (topography, surface description, obstacles). WAsP uses the wind atlas methodology. In a first step the influence of the terrain to the wind flow is calculated, creating a generalised regional wind climate.

In a reverse process, this generalised regional wind climate (called wind statistic) is then applied to topography, surface description and obstacles at the vicinity of each individual wind turbine, providing the wind flow at this point even if the wind data has measured in some distance which can be, depending on the terrain, up to several kilometres[3].

►Go to Top

Model Input Parameters

Besides the processed wind data, important input parameters for the energy yield calculation model are as described the terrain description, comprising of the orographical (topographical) model and the description of the earth´s surface (roughness description).

►Go to Top

Orography

A method to gather data describing the orographical terrain is the analysis of data collected by satellites. As an example the SRTM -Shuttle Radar Topography Mission data base – provided by the US Geological Survey – scanned the earth´s surface between 60° latitude north and 54° latitude south, with a resolution of 90 x 90 m.

The data in between these points can be interpolated using the WindPro software to gain the topographical model of the proposed site, with a height contour density of 5 metres, as shown in Figure 1 (the example shows the orographic map of the Ashegoda site in Ethipia, where a feasibility study for a wind park has been conducted by German Technical Cooperation (GTZ)).

Figure 1: SRTM height contour map of Ashegoda wind park site in Ethiopia

Besides this advanced method of gathering topographical data, national or regional institutions can be asked for topographical maps of the area. The developers have to take care, whether the maps are available in an appropriate scale. Sources should be compared regarding accuracy and potential failures.

The height data is than processed to a three-dimensional digital elevation model of the wind farm site. An example for the Ashegoda site is shown in figure 2.

Figure 2: Three-dimensional digital elevation model of Ashegoda site, view from south-western direction

►Go to Top

Roughness

For the model simulations the roughness classification for the surface in close proximity to the wind farm site is derived from topographical maps, data obtained during site visits as well as aerial photos of the region. A basic description of the roughness classes is given in the following (roughness length is a second roughness description unit), it has to be noted that the roughness class is a defined value which can not be measured directly. The roughness length describes the height where the wind speed in a logarithmic wind profile is becoming zero; the coarser the surface, the higher the roughness length.

Roughness class
Roughness length
Relative energy
Description of surface
0
0,0002
100
Water areas
0,5
0,0024
73
Mixed Water and land area of very smooth land
1
0,03
52
Open farmland with no crossing hedges and with scattered buildings. Only smooth hills
1,5
0,055
45
Farmland with some buildings and crossing hedges of 8m height and about 1250 m apart.
2
0,10
39
Farmland with some buildings and crossing hedges of 8m height and about 800 m apart.
2,5
0,20
31
Farmland with some buildings and crossing hedges of 8m height and about 250 m apart.
3
0,40
24
Villages, small towns, very closed farmladn with many or high hedges, Forrest, many abrupt orographic changes.
3,5
0,80
18
Large towns, cities with extended build-up areas
4
1,6
13
Large cities with build-up areas and high buildings


As an example for a roughness description the map of Ashegoda site is presented in the following Figure 3.

Figure 3: Roughness map for Ashegoda wind park site in Ethiopia

►Go to Top

Wind Shear

In many assessments of the wind potential the upper anemometers of the wind measurement are installed at a height of 40 m above ground while the hub height of modern wind turbines today often reaches heights between 55 m and 60 m above ground level. To estimate the wind regime at hub height of the wind turbines (the WAsP model simplifies the wind speed distribution over the rotor as concentrated to the hub height) the wind speed is extrapolated according to the following formula:


Whereas γ is the Power Law Exponent or Wind Gradient which is depending on the roughness of the terrain, the thermical lamination of the atmosphere, the wind speed itself and the height above ground. The exponent must be calculated sectorwise for the wind park site. This can be done by the WindPro-Software package from the measured wind data at the heights of 10 m a.g.l. respectively 40 m a.g.l..

The wind gradients for the twelve wind distribution sectors describe the wind speed at different heights for all wind directions diveded in sectors of 30°. An example for a calculated wind profile (increase of the wind speed with height) for the main wind direction of this site (sector south-southeast) is displayed in Figure 4.

Figure 4:Wind profile of Ashegoda wind park site (main wind direction south-southeast)

Combining considerations of terrain and roughness, the wind profile for the area of each individual wind turbine is then calculated by WAsP. The extrapolation from 40 m measuring height to 60 m hub height can be considered as reasonable but a further increase of the wind speed for hub heights of 80 m and more is not stringent as the power law is not suitable for height extrapolations over this range.

►Go to Top

Wind Turbine Parameters

To estimate the performance of different turbine types for the development of a new project usually several scenarios using different turbine types are calculated. Important turbine parameters, which should be included are hub height, nominal power and rotor diameter.

►Go to Top

Power Curve and Air Density

The Power curve of a wind turbine is an important parameter, describing the relation between the wind speed on site and the respective electrical energy output. Power curves and ct-values (a parameter for the calculation of the wake effect) of the turbines under consideration are applied for the energy calculation. Power curves which had been measured by independent institutions are of higher quality than calculated ones. Due to the fluctuations of both the characteristics of the wind turbine components, and the measuring conditions power curves of different measurements differing slightly between each other.

Several manufacturers are thus providing power curves which are calculated from the results of several measured ones; the performance of these calculated power curves might be contractually guaranteed by the manufacturers.

During the calculation of the energy yield, the power curves, given for the standard conditions of air density = 1.225 kg/m3 are adapted to the air density of each individual turbine location at hub height, with the transformed power curves for the average air density. The air density can be calculated by WindPro for each individual wind turbine according to the site conditions, height above sea level plus the hub height of the turbines (e.g. 57 m / 60 m) and an annual average temperature level. As verification, the calculated adaptations for air density at the turbine sites should be compared to information provided by nearby meteorological stations. Figure 5 shows the power curves of several wind turbines at an air density of ρ = 1,225kg/ m3.

Figure 5: Power curves for wind turbines proposed for the Ashegoda wind park in Ethiopia

As can be clearly seen, the Enercon E-53 and Gamesa G-58 wind turbines are generating more energy in the wind speed range from about 6 m/s to 12 m/s which occur more frequently then the other wind speed ranges, see the Weibull-distribution in Figure 6 This is mainly caused by be larger rotor diameter compared to the Enercon E-48 and Vestas V52 wind turbines.

Figure 6: Weibull distribution for Ashegoda wind project site

►Go to Top

Losses and Uncertainties

Meteorological phenomena can only be predicted to a certain limited degree. As a consequence it is not possible to make an exact forecast of the wind conditions even if longterm reference data (which can only represent the past) is used. Furthermore, data collection and processing is always afflicted with errors and inaccuracies as is every mathematical or physical model used to describe or predict real procedures. To compensate the inaccuracies in modelling approach and basic input data, it is advisable to use factors of safety to adjust, or discount the final output. Two blocks determine the factors of safety: losses and uncertainties.

►Go to Top

Losses

Losses are found on the whole energetic transformation chain from the rotor (kinetic energy) to the substation (electrical energy). The losses are simple add-ups to the total reduction of the calculated energy yield. In detail:

►Go to Top

Park Efficiency

After passing the rotor of a wind turbine, the wind has a decreased speed due to the kinetic energy taken away by the rotor and increased turbulence caused by the rotating rotor and the difference in speed compared to the undisturbed flow. Until the speed difference to undisturbed flow is not equalised, the result is a lower energy yield for the wind turbines following in the direction of the flow. These losses are called array or wake losses.

►Go to Top

Turbine Availability

The turbine availability is the percentage of a year (i.e. 8760 hours) where the turbine is able to generate electrical energy while being connected to the grid. Reasons for the non-availability of a wind turbine are various, and include downtimes for regular maintenance and servicing, component failures (including defect sensors), overheating of components, repairs or exchange of components, as well as errors and downtimes of the superior electrical grid. The turbine availability can be set to a value by taking into account the experience in the operation of windturbines in the region and skills of local staff. For a country without experiences and a high need for capacity building during the first years of a project a standard value of 95 % can be applied. Later on and after the first years of sufficient turbine availability averages, the aim should be to raise the level up to 97 % which could be seen as a good value for the first wind parks in a country with few experiences in wind turbine operation. A common value for countries with a very established wind energy industry, an availability of 98 % is assumed.

►Go to Top

Electrical Losses

The electrical losses depend on the resistance of the conductors and on the current intensity. To assess the current intensity of the wind park the following methodology is used: the duration curve of the wind park for one year is approximated by a two stage approach. For 10% of the year (876 hours) full power is assumed and for the rest of the year (7,884 hours) the load is estimated to 25% of full load.

For this power pattern of the wind park, the turbine current is derived and the losses for the internal wind park cabling, and for the wind park cabling connection to the substation are calculated relative to the total energy output.

For the Ashegoda wind park in Ethiopia the following values have been calculated:

  • internal park cabling: 0.2%
  • internal park transmission lines: 0.5%
  • turbine transformers: 1.1%
  • transmission line 230kV: 0.5%
  • substation transformer 0.5%

The total electrical losses of the park are estimated at 2.8% of that amount of electricity which is produced by the wind turbines.

►Go to Top

Miscellaneous Losses

In addition to the transmission losses and lost production due to reduced availability a number of other losses should be taken into account. The aerodynamic turbine performance described by the power curve is strongly depending on the profile and surface of the wind rotor blades. Blade fouling from dirt or insects on the surface of the blades lead to non-expected change of airfoil characteristics and to lower energy yield. Whether a change of blade characteristics has to be expected, depends on climatic conditions like humidity. For example an average air density of a temperature of 17° in 2.400 m above sea level provides no thermal problems for the wind turbines. No effect of the low air density is to be expected than the reduced energy production.

High wind control losses are caused by the turbine cut-in and cut-out strategy. The turbines will cut-off when cut-out wind speed is reached and will not re-cut-in until wind speed is below a defined wind speed level, lower than the cut-out level. A reduction factor of 0.1% to the gross energy output was applied to take these effects into account.

►Go to Top

Wind Speed related Uncertainties

Uncertainties cover the inaccuracy of the data processing from the measurement, the internal data processing and the long-term prediction. A percentage value describes the standard deviation of scattering results around the expected true value. For the energy calculation, these wind speed-related uncertainty values have to be transformed to the energy production level. Additional uncertainties have to be determined for modelling and mathematical algorithms.

►Go to Top

Uncertainties of the WAsP-Model

The WAsP (Wind Atlas Analysis and Application Program) software is a proven tool used in the wind industry for more than 15 years. As every model it has limitations and uncertainties mainly due to the simplifications behind it which had been done to handle the calculations on desktop computers in an acceptable time frame. Mesoscalic meteorological models require powerful computers and a calculation time of several days. However, WAsP has been used for a considerable time worldwide and the uncertainties have been evaluated over the years. In case of Ashegoda, the existence of modestly shaped hills and ridges lead to a suffiecient quality of the calculation.

  • Transfer Wind to Energy
    The discrete wind flow from discrete wind directions is simplified to 10-minute average values for 12 direction sectors and statistically preprocessed before being applied to the power curve.
  • Site modelling
    Consists basically of two input parameters: the topographical model and the surface description (roughness description).
  • Flow modelling
    WasP has been developed for use in areas with only modestly shaped hills which is the case at Ashogoda site. The uncertainty of the flow modelling is set to the medium value of 3.0% .
  • Wake modelling
    The uncertainty of the selected wake model will be low, if the area of the wind farm itself is nearly plain (no additional uncertainties due to the influence of the terrain). In case a high roughness length is found for the terrain, the uncerainty in wake modelling can be much higher.

To calculate the total uncertainty all single uncertainties can be considered as stochastically independent and the commonly used way of estimating the joint uncertainty of independent (un-correlated) uncertainties is to calculate the RMS (root mean square) value.

►Go to Top

Uncertainties of the Wind Data

The reliability of the WAsP calculation is highly dependent on the quality of the input parameters of which wind data is the most important one. The collection and processing of wind date is subject to several uncertainties.

  • Anemometer calibration
    Anemometers should be calibrated in order to secure that the measured wind speed equals the actual wind speed.
  • Anemometer characteristics
    Describes the uncertainty of the quality the anemometer detects the wind flow and processes the values to digital data.
  • Mounting error
    The anemometer has to be vertically mounted. The uncertainty describes the effect if this is not done properly.
  • Data recording
    Describes the uncertainties related to processing and storage of the data provided by the anemometer and the wind vane in the data logger.
  • Terrain description
    Describes the uncertainty of the influence of the terrain to the measurement. Inclined wind flow and strong turbulence can not be measured accurately by a cup anemometer.
  • Long term correlation
    The data used for the long term correlation as well as the MCP-Process includes uncertainties;

To calculate the total uncertainty all single uncertainties can be considered as stochastically independent and the commonly used way of estimating the joint uncertainty of independent (un-correlated) uncertainties is to calculate the RMS value.

►Go to Top

Uncertainties of the Power Curve

It has to be considered that the power curve used for the gross energy calculation is also subject to uncertainties which had been described in the section 'Power curve and air density'. Due to the non linear relation of mean wind speed and energy these uncertainties can not be integrated into the uncertainties of wind conditions but have to be dealt with separately. In the following section an example for the calculation of the uncertainties of the energy yield for one wind turbine type is given.

The uncertainty of the power curve is, assuming the power performance of the turbine as independent of the energy deviation due to wind uncertainties, connected to the uncertainties of the energy yield by the following equation:


The turbine supplier usually gives a guarantee of 95 % of the energy values, which leads to an uncertainty to the predicted figures of 5 %; the actual guarantee value has to be negotiated with the manufacturer, the uncertainty can be adapted accordingly. This figure has been taken for every wind turbine type as it is sufficiently conservative for both calculated and measured power curves.

►Go to Top

Uncertainties Energy Yield

The interpretation of uncertainty in energy yield from the total uncertainty in wind speed is not straightforward. The theoretical cubic relation of wind speed and energy does not give a correct description of the phenomena.

For the long term mean wind speed averaged over all turbine locations at hub height the average wind speed value is derived from the wind data processing. The uncertainty is equivalent to a reduction to the mean wind speed when considering the worst case. To translate this reduced mean wind speed into energy yield the parameters of a Weibull distribution are adapted and this new Weibull distribution is then applied to the individual turbine power curves. The results for the considered wind park layout can be found in the examinations in the following tables Deviation of Energy due to wind uncertainties, indicating an energy deviation due to the uncertainty in wind speed assessment.

►Go to Top


Calculation of Uncertainties in Energy Yield for a Specific Wind Turbine

The transformation of the wind speed related uncertainties into the energy related uncertainty by appropriately reducing the wind speed at hub height leads to the following results:


Mean wind speed [m/s]
Deviation wind speed
A-factor [m/s]
k-factor
Energy Yield [MWh/y]
Deviation Energy
calculated WAsP
8,84
0,0%
9,81
3,62
248,854
0,0%
reduced wind speed;
uncertainties taken into
account
8,35
5,6%
9,26
3,62
218,642
12,14%


Assuming the power performance of the turbine as independent of the energy deviation due to wind uncertainties, the total uncertainty for energy yield can be determined from the uncertainties of wind conditions and power curve.

The analysis of uncertainties is an important step for the risk assessment of the project. From the predicted annual energy and from the total uncertainty on the energy level the probability of exceeding of certain energy yields can be calculated by statistical methods. Applying a Gauss process for the statistic analysis, the calculated gross annual energy can be understood as the mean annual energy yield having the highest rate of probability of all single results. The uncertainty shall be understood as standard deviation of the expected results around the most probable event.

Figure 7 displays the probabilities that a certain amount of annual electricity production is exceeded for the example wind turbine.

Figure 7: Probability of exceedance of certain energy yields for Ashegoda wind park

Gross annual energy describes the energy yield as calculated and net annual energy the energy yield considering the losses and uncertainties.

Besides the uncertainties for wind conditions and power curve, the losses for electricity transmission (e.g. 2,8 %) and reduced availability of the turbines (e.g. 95 %) have also to be considered as constant factors, reducing the estimated energy yield.

►Go to Top


Further Information


►Go to Top

References

  1. The contents of this article have been prepared by the project team of the feasibility study of the Ethiopian wind park Ashegoda, conducted by the Deutsche Gesellschaft für internationale Zusammenarbeit (GIZ) in cooperation with the Austrian development agency and Lahmeyer international. Originally the contents have been published as: GTZ (2006) Feasibility Study for Wind Park Development in Ethiopia and Capacity Building - Ashegoda Wind Park Site), retrieved 11.7.2011 [[1]]
  2. EMDinternational (2010) WindPro users manual, retrieved 26.7.2011 [[2]]
  3. Mortensen N. G., Landberg L., Troen I.,fckLRPetersen E. L., Rathmann O. and Nielsen M.(2004) WAsP Utility Programs, retrieved 25.7.2011 [[3]]