Difference between revisions of "Hydropower Stations in Kenya"

From energypedia
***** (***** | *****)
m
***** (***** | *****)
m
 
(12 intermediate revisions by 4 users not shown)
Line 1: Line 1:
As of 2007, Kenya’s hydropower stations have had a total installed capacity of 677.3 MW. The power stations comprise the Seven Forks hydro stations, the Mini hydro stations and Turkwel Power Station. Seven Forks Hydro Stations are situated along the lower part of the Tana River. They comprise:
 
  
*[[GPS_coordinates_-_Hydropower_sites#List_of_hydropower_sites:|Masinga Power Station]],
+
= Overview<br/> =
*[[GPS_coordinates_-_Hydropower_sites#List_of_hydropower_sites:|Kamburu Power Station]],
+
 
*[[GPS_coordinates_-_Hydropower_sites#List_of_hydropower_sites:|Gitaru Power Station]],
+
As of 2007, [[Kenya_Energy_Situation|Kenya]]’s hydropower stations have had a total installed capacity of 677.3 MW.
*[[GPS_coordinates_-_Hydropower_sites#List_of_hydropower_sites:|Kindaruma Power Station]]
+
 
*[[GPS_coordinates_-_Hydropower_sites#List_of_hydropower_sites:|Kiambere Power Station]].
+
<u>The power stations comprise:</u>
 +
 
 +
*the Seven Forks Hydro Stations
 +
*the Mini Hydro Stations
 +
*Turkwel Power Station
 +
 
 +
<br/>
 +
 
 +
= Seven Fork Hydro Stations<br/> =
 +
 
 +
<u>'''Seven Forks Hydro Stations '''are situated along the lower part of the Tana River. They comprise:</u>
 +
 
 +
*[[Hydropower_Sites_-_GPS_Coordinates#Kenya|Masinga Power Station]]
 +
*[[Hydropower_Sites_-_GPS_Coordinates#Kenya|Kamburu Power Station]]
 +
*[[Hydropower_Sites_-_GPS_Coordinates#Kenya|Gitaru Power Station]]
 +
*[[Hydropower_Sites_-_GPS_Coordinates#Kenya|Kindaruma Power Station]]
 +
*[[Hydropower_Sites_-_GPS_Coordinates#Kenya|Kiambere Power Station]]
 +
 
 +
<br/>
  
 
The five stations have an installed capacity of 543.2 MW. Water has been cascaded from one station to the next, taking advantage of the head created by each dam to produce power. To provide adequate flow during the dry periods, water is stored at Masinga Reservoir and released during the dry season. Two other sites along the river, Mutonga and Grand Falls were yet to be developed in 2007.
 
The five stations have an installed capacity of 543.2 MW. Water has been cascaded from one station to the next, taking advantage of the head created by each dam to produce power. To provide adequate flow during the dry periods, water is stored at Masinga Reservoir and released during the dry season. Two other sites along the river, Mutonga and Grand Falls were yet to be developed in 2007.
  
= Masinga Power Station =
+
<br/>
 +
 
 +
== Masinga Power Station<br/> ==
  
 
Masinga Power Station has an installed capacity of 40 MW, and was commissioned in 1981. Two vertical Kaplan turbines drive two generators capable of generating 40 MW of power. The power generated is transmitted to Kamburu power station for transmission to Nairobi. In addition to the 40MW produced by this station, Masinga serves as a crucial reservoir, which has a capacity of 1.56 billion cubic meters of water. This reservoir is used for water regulation throughout the year. The dam occupies a surface area of 120 km².
 
Masinga Power Station has an installed capacity of 40 MW, and was commissioned in 1981. Two vertical Kaplan turbines drive two generators capable of generating 40 MW of power. The power generated is transmitted to Kamburu power station for transmission to Nairobi. In addition to the 40MW produced by this station, Masinga serves as a crucial reservoir, which has a capacity of 1.56 billion cubic meters of water. This reservoir is used for water regulation throughout the year. The dam occupies a surface area of 120 km².
  
= Kamburu Power Station =
+
<br/>
 +
 
 +
== Kamburu Power Station<br/> ==
  
 
Kamburu Power Station has an installed a capacity of 94.2 MW and was commissioned in 1974. Kamburu is the first underground power station in the complex. Electric power from Kamburu is conveyed to Nairobi via two 220 kV transmission lines from a primary 132 kV substation. Water is conveyed to Gitaru Power Station via a 2.9 km tailrace tunnel.
 
Kamburu Power Station has an installed a capacity of 94.2 MW and was commissioned in 1974. Kamburu is the first underground power station in the complex. Electric power from Kamburu is conveyed to Nairobi via two 220 kV transmission lines from a primary 132 kV substation. Water is conveyed to Gitaru Power Station via a 2.9 km tailrace tunnel.
  
= Gitaru Power Station =
+
<br/>
 +
 
 +
== Gitaru Power Station<br/> ==
  
 
Gitaru Power Station has an installed capacity of 225 MW, and was commissioned in 1978 (145 MW) and 1999 (80 MW) Gitaru is the biggest power station in Kenya in terms of installed capacity. The power produced is transmitted to Kamburu 132 kV substation via two 132 kV circuits. The discharge from Gitaru Station is conveyed through a 5 km tailrace tunnel which empties into Kindaruma reservoir.
 
Gitaru Power Station has an installed capacity of 225 MW, and was commissioned in 1978 (145 MW) and 1999 (80 MW) Gitaru is the biggest power station in Kenya in terms of installed capacity. The power produced is transmitted to Kamburu 132 kV substation via two 132 kV circuits. The discharge from Gitaru Station is conveyed through a 5 km tailrace tunnel which empties into Kindaruma reservoir.
  
= Kindaruma Power Station =
+
<br/>
 +
 
 +
== Kindaruma Power Station<br/> ==
  
 
Kindaruma Power Station has an installed capacity of 44 MW, and was commissioned in 1968. Kindaruma is the first station to be constructed in the Seven Forks complex. Power from Kindaruma is transmitted directly to Nairobi via a 132 kV line or to Kamburu 132 kV substation. The water is then passed down to Kiambere - the latest development in the complex.
 
Kindaruma Power Station has an installed capacity of 44 MW, and was commissioned in 1968. Kindaruma is the first station to be constructed in the Seven Forks complex. Power from Kindaruma is transmitted directly to Nairobi via a 132 kV line or to Kamburu 132 kV substation. The water is then passed down to Kiambere - the latest development in the complex.
  
= Kiambere Power Station =
+
<br/>
 +
 
 +
== Kiambere Power Station<br/> ==
  
 
Kiambere Power Station has an installed a capacity of 144 MW, and was commissioned in 1988. The reservoir’s capacity is 585 million m³. As it is currently the last dam on the Tana, the machines run mostly as base load hence the large power output. The underground powerhouse is situated 4 km away from the saddle dam where the intake structure is located. The water conveyance is by a 6m-diameter headrace tunnel.
 
Kiambere Power Station has an installed a capacity of 144 MW, and was commissioned in 1988. The reservoir’s capacity is 585 million m³. As it is currently the last dam on the Tana, the machines run mostly as base load hence the large power output. The underground powerhouse is situated 4 km away from the saddle dam where the intake structure is located. The water conveyance is by a 6m-diameter headrace tunnel.
 +
 +
<br/>
 +
 +
= Further Information =
 +
 +
*[[Portal:Hydro|Hydro portal on energypedia]]
 +
*[[Kenya_Energy_Situation|Kenya Energy Situation]]<br/>
 +
 +
<br/>
  
 
= References<br/> =
 
= References<br/> =
  
GTZ (2007): Eastern Africa Resource Base: GTZ Online Regional Energy Resource Base: Regional and Country Specific Energy Resource Database: II - Energy Resource.
+
*GTZ (2007): Eastern Africa Resource Base: GTZ Online Regional Energy Resource Base: Regional and Country Specific Energy Resource Database: II - Energy Resource.
  
 +
<references />
 +
 +
[[Category:Large_Hydro]]
 +
[[Category:Hydro]]
 
[[Category:Kenya]]
 
[[Category:Kenya]]
[[Category:Hydro]]
 
[[Category:Hydro_(large)]]
 

Latest revision as of 09:23, 8 April 2015

Overview

As of 2007, Kenya’s hydropower stations have had a total installed capacity of 677.3 MW.

The power stations comprise:

  • the Seven Forks Hydro Stations
  • the Mini Hydro Stations
  • Turkwel Power Station


Seven Fork Hydro Stations

Seven Forks Hydro Stations are situated along the lower part of the Tana River. They comprise:


The five stations have an installed capacity of 543.2 MW. Water has been cascaded from one station to the next, taking advantage of the head created by each dam to produce power. To provide adequate flow during the dry periods, water is stored at Masinga Reservoir and released during the dry season. Two other sites along the river, Mutonga and Grand Falls were yet to be developed in 2007.


Masinga Power Station

Masinga Power Station has an installed capacity of 40 MW, and was commissioned in 1981. Two vertical Kaplan turbines drive two generators capable of generating 40 MW of power. The power generated is transmitted to Kamburu power station for transmission to Nairobi. In addition to the 40MW produced by this station, Masinga serves as a crucial reservoir, which has a capacity of 1.56 billion cubic meters of water. This reservoir is used for water regulation throughout the year. The dam occupies a surface area of 120 km².


Kamburu Power Station

Kamburu Power Station has an installed a capacity of 94.2 MW and was commissioned in 1974. Kamburu is the first underground power station in the complex. Electric power from Kamburu is conveyed to Nairobi via two 220 kV transmission lines from a primary 132 kV substation. Water is conveyed to Gitaru Power Station via a 2.9 km tailrace tunnel.


Gitaru Power Station

Gitaru Power Station has an installed capacity of 225 MW, and was commissioned in 1978 (145 MW) and 1999 (80 MW) Gitaru is the biggest power station in Kenya in terms of installed capacity. The power produced is transmitted to Kamburu 132 kV substation via two 132 kV circuits. The discharge from Gitaru Station is conveyed through a 5 km tailrace tunnel which empties into Kindaruma reservoir.


Kindaruma Power Station

Kindaruma Power Station has an installed capacity of 44 MW, and was commissioned in 1968. Kindaruma is the first station to be constructed in the Seven Forks complex. Power from Kindaruma is transmitted directly to Nairobi via a 132 kV line or to Kamburu 132 kV substation. The water is then passed down to Kiambere - the latest development in the complex.


Kiambere Power Station

Kiambere Power Station has an installed a capacity of 144 MW, and was commissioned in 1988. The reservoir’s capacity is 585 million m³. As it is currently the last dam on the Tana, the machines run mostly as base load hence the large power output. The underground powerhouse is situated 4 km away from the saddle dam where the intake structure is located. The water conveyance is by a 6m-diameter headrace tunnel.


Further Information


References

  • GTZ (2007): Eastern Africa Resource Base: GTZ Online Regional Energy Resource Base: Regional and Country Specific Energy Resource Database: II - Energy Resource.