Difference between revisions of "Micro Hydro Power Manufacturer - Detailed Overview"

From energypedia
***** (***** | *****)
m
***** (***** | *****)
m
 
(4 intermediate revisions by 2 users not shown)
Line 1: Line 1:
= Note<br/> =
 
  
For a better representation of the following tables it might be helpful to adjust your screen size to values slightly below 100%.
+
= Overview<br/> =
 +
Find here a detailed overview of micro hydro power manufacturers.  
  
An empty ready-to-print version of the following table (to be filled out on site) can be found [http://energypedia.info/index.php/File:Printable_manufacturer_list_microhydro_turbines.xlsx here].
+
►Please [http://help.energypedia.info/wiki/Edit add further manufacturers] and [http://help.energypedia.info/wiki/Link_Articles set internal or external links]
  
 +
► For a better representation of the following tables it might be helpful to adjust your screen size to values slightly below 100%.
 +
 +
► An empty ready-to-print version of the following table (to be filled out on site) can be found [[:File:Printable manufacturer list microhydro turbines.xlsx|here]].
 +
 +
<br/>
  
  
Line 11: Line 16:
 
== Francais<br/> ==
 
== Francais<br/> ==
  
{| style="width: 100%" border="1" cellpadding="1" cellspacing="1" width="25%"
+
{| cellspacing="1" cellpadding="1" border="1" style="width: 25%;  width: 100%"
 
|-
 
|-
| colspan="2" | '''Constructeur'''&nbsp;<br/>
+
| style="width: 473px;  background-color: rgb(204, 204, 204)" colspan="2" | '''Constructeur'''<br/>
| &nbsp;
+
 
| MADAGASKAR
+
| style="width: 74px; background-color: rgb(204, 204, 204)" |
| nowrap="nowrap" width="15%" | ENTEC Indonesien
+
| style="width: 180px;  background-color: rgb(204, 204, 204)" | MADAGASKAR
| IREM Italy
+
| style="white-space: nowrapwidth: 15%;  background-color: rgb(204, 204, 204)" | ENTEC Indonesien
| IREM Italy
+
| style="background-color: rgb(204, 204, 204)" | IREM Italy
| IREM Italy
+
| style="background-color: rgb(204, 204, 204)" | IREM Italy
| Vitasoa
+
| style="background-color: rgb(204, 204, 204)" | IREM Italy
| AIDER
+
| style="background-color: rgb(204, 204, 204)" | Vitasoa
| AIDER
+
| style="background-color: rgb(204, 204, 204)" | AIDER
| Shao Yang
+
| style="background-color: rgb(204, 204, 204)" | AIDER
| Vitasoa
+
| style="background-color: rgb(204, 204, 204)" | Shao Yang
| AIDER
+
| style="background-color: rgb(204, 204, 204)" | Vitasoa
| JLA & Co.
+
| style="background-color: rgb(204, 204, 204)" | AIDER
| C.Dumont (n'existe plus)
+
| style="background-color: rgb(204, 204, 204)" | JLA & Co.
| &nbsp;
+
| style="background-color: rgb(204, 204, 204)" | C.Dumont (n'existe plus)
| &nbsp;
+
| style="background-color: rgb(204, 204, 204)" |
| &nbsp;
+
| style="background-color: rgb(204, 204, 204)" |
| &nbsp;
+
| style="background-color: rgb(204, 204, 204)" |
| nowrap="nowrap" width="10%" | Hunan Lingling
+
| style="background-color: rgb(204, 204, 204)" |
| &nbsp;
+
| style="white-space: nowrapwidth: 10%;  background-color: rgb(204, 204, 204)" | Hunan Lingling
| &nbsp;
+
| style="background-color: rgb(204, 204, 204)" |
| &nbsp;
+
| style="background-color: rgb(204, 204, 204)" |
| &nbsp;
+
| style="background-color: rgb(204, 204, 204)" |
| &nbsp;
+
| style="background-color: rgb(204, 204, 204)" |
| &nbsp;
+
| style="background-color: rgb(204, 204, 204)" |
| VA TECH (fr)
+
| style="background-color: rgb(204, 204, 204)" |
| &nbsp;
+
| style="background-color: rgb(204, 204, 204)" | VA TECH (fr)
| &nbsp;
+
| style="background-color: rgb(204, 204, 204)" |
 +
| style="background-color: rgb(204, 204, 204)" |
 
|-
 
|-
| colspan="2" nowrap="nowrap" width="10%" | '''Site (locationi, région)'''
+
| style="white-space: nowrap;  width: 473px" colspan="2" | '''Site (locationi, région)'''
| &nbsp;
+
| style="width: 74px" |
| &nbsp;
+
| style="width: 180px" |
 
| Ankazomiriotra/ Andriatsemboka
 
| Ankazomiriotra/ Andriatsemboka
 
| Mangamila (Anjozorobe)/ Antananarive
 
| Mangamila (Anjozorobe)/ Antananarive
Line 51: Line 57:
 
| Ampitafa
 
| Ampitafa
 
| Ranotsara Nord (Iakora)/ Fianaratsoa
 
| Ranotsara Nord (Iakora)/ Fianaratsoa
| nowrap="nowrap" width="20%" | Anosibe Trimoloharano (Andramasina)/ Antananarive
+
| style="white-space: nowrapwidth: 20%" | Anosibe Trimoloharano (Andramasina)/ Antananarive
 
| Ambohijoky/ Antananarive
 
| Ambohijoky/ Antananarive
 
| Ranomainty
 
| Ranomainty
 
| Ambosary gara
 
| Ambosary gara
 
| Merikanjaka
 
| Merikanjaka
| nowrap="nowrap" width="20%" | Antetezambato, Tsarasaotra, Ambositra
+
| style="white-space: nowrapwidth: 20%" | Antetezambato, Tsarasaotra, Ambositra
 
| Sahamadio- Fisakana
 
| Sahamadio- Fisakana
| nowrap="nowrap" width="15%" | Ankazobe/ Antananarive
+
| style="white-space: nowrapwidth: 15%" | Ankazobe/ Antananarive
 
| Tsiazompaniry
 
| Tsiazompaniry
 
| Fianarantsoa
 
| Fianarantsoa
| nowrap="nowrap" width="15%" | Volobe/ Toamasine
+
| style="white-space: nowrapwidth: 15%" | Volobe/ Toamasine
 
| Sahanivotry
 
| Sahanivotry
| nowrap="nowrap" width="15%" | Antelomita (pour Tana)
+
| style="white-space: nowrapwidth: 15%" | Antelomita (pour Tana)
| nowrap="nowrap" width="15%" | Namorona (Fianarantsoa)
+
| style="white-space: nowrapwidth: 15%" | Namorona (Fianarantsoa)
| nowrap="nowrap" width="15%" | Tsiazompaniry/Antananarive
+
| style="white-space: nowrapwidth: 15%" | Tsiazompaniry/Antananarive
| nowrap="nowrap" width="15%" | Manandray (Fianarantsoa)
+
| style="white-space: nowrapwidth: 15%" | Manandray (Fianarantsoa)
| nowrap="nowrap" width="15%" | Vatomandry/ Toamasina
+
| style="white-space: nowrapwidth: 15%" | Vatomandry/ Toamasina
 
| Andekaleka (district Brickaville), pour Tana
 
| Andekaleka (district Brickaville), pour Tana
 
| Mandraka (70 km de Tana), pour Tana
 
| Mandraka (70 km de Tana), pour Tana
| Lily&nbsp;?/Ampefy? /Antananarive
+
| Lily ?/Ampefy? /Antananarive
| nowrap="nowrap" width="15%" | Manandona/ Antanarivo
+
| style="white-space: nowrapwidth: 15%" | Manandona/ Antanarivo
 
|-
 
|-
| colspan="2" | '''Opérateur'''
+
| style="width: 473px" colspan="2" | '''Opérateur'''
| '''(SME/NGO/Community)'''
+
| style="width: 74px" | '''(SME/NGO/Community)'''
| &nbsp;
+
| style="width: 180px" |
 
| Power and Water (SME)
 
| Power and Water (SME)
 
| Elec. & Eau (SME)
 
| Elec. & Eau (SME)
Line 100: Line 106:
 
| JIRAMA
 
| JIRAMA
 
| JIRAMA
 
| JIRAMA
| &nbsp;
+
|  
| &nbsp;
+
|  
 
|-
 
|-
| colspan="2" | '''Source&nbsp;d'investissement'''&nbsp;<br/>
+
| style="width: 473px" colspan="2" | '''Source d'investissement'''
| &nbsp;
+
| style="width: 74px" |
| &nbsp;
+
| style="width: 180px" |
| 70&nbsp;% ADER, 30&nbsp;% fonds (propre et emprunt)
+
| 70 % ADER, 30 % fonds (propre et emprunt)
 
| 70% ADER, <30% Elec. & Eau, contribution commune: main d'oeuvre
 
| 70% ADER, <30% Elec. & Eau, contribution commune: main d'oeuvre
 
| ADER, Elec. & Eau et commune
 
| ADER, Elec. & Eau et commune
Line 112: Line 118:
 
| ADER, Commune
 
| ADER, Commune
 
| ADER - AIDER- Tany Meva - IME
 
| ADER - AIDER- Tany Meva - IME
| nowrap="nowrap" width="20%" | ADER - AIDER - Tany Meva - IME
+
| style="white-space: nowrapwidth: 20%" | ADER - AIDER - Tany Meva - IME
 
| 70% ADER, 30% Sermad
 
| 70% ADER, 30% Sermad
 
| ADER, Vitasoa, Commune
 
| ADER, Vitasoa, Commune
 
| ADER , AIDER, Tany Meva
 
| ADER , AIDER, Tany Meva
 
| 100% GEPF
 
| 100% GEPF
| nowrap="nowrap" width="25%" | 90% fond europeen (FED), 5% etat madagscar, 5% ambassadeur canadien
+
| style="white-space: nowrapwidth: 25%" | 90% fond europeen (FED), 5% etat madagscar, 5% ambassadeur canadien
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
| FNE (fonds nationale électricité)
 
| FNE (fonds nationale électricité)
 
| BEI (europe)
 
| BEI (europe)
| &nbsp;
+
|  
| &nbsp;
+
|  
 
|-
 
|-
| colspan="2" | '''Mise en service'''
+
| style="width: 473px" colspan="2" | '''Mise en service'''
| &nbsp;
+
| style="width: 74px" |
| &nbsp;
+
| style="width: 180px" |
 
| 2009
 
| 2009
 
| 2009 (juin)
 
| 2009 (juin)
Line 148: Line 154:
 
| 2000
 
| 2000
 
| 1985
 
| 1985
| &nbsp;
+
|  
 
| 2009
 
| 2009
| &nbsp;
+
|  
| &nbsp;
+
|  
 
| 2008
 
| 2008
 
| 1952, rénouvellement
 
| 1952, rénouvellement
| &nbsp;
+
|  
 
| 2008
 
| 2008
| &nbsp;
+
|  
| &nbsp;
+
|  
 
| nouveau bloc 2009
 
| nouveau bloc 2009
 
| 2004
 
| 2004
 
| 2009
 
| 2009
| &nbsp;
+
|  
 
|-
 
|-
| rowspan="11" | <br/>'''Equipement'''
+
| style="width: 114px" rowspan="11" | <br/>'''Equipement'''
| '''Type de turbine'''&nbsp;
+
| style="width: 299px" | '''Type de turbine'''
| &nbsp;
+
| style="width: 74px" |
| &nbsp;
+
| style="width: 180px" |
 
| Banki, T14- D300
 
| Banki, T14- D300
 
| Banki
 
| Banki
Line 179: Line 185:
 
| Banki
 
| Banki
 
| Francis
 
| Francis
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
| Francis
 
| Francis
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
| Pelton (verticale, 4 jet, 2 rotor)
 
| Pelton (verticale, 4 jet, 2 rotor)
| &nbsp;
+
|  
| &nbsp;
+
|  
 
|-
 
|-
| '''puissance'''
+
| style="width: 299px" | '''puissance'''
| '''[kW]'''
+
| style="width: 74px" | '''[kW]'''
| &nbsp;
+
| style="width: 180px" |
 
| 2 x 58
 
| 2 x 58
 
| 85
 
| 85
Line 214: Line 220:
 
| 6760
 
| 6760
 
| 5676
 
| 5676
| &nbsp;
+
|  
 
| 5000
 
| 5000
 
| 5200
 
| 5200
Line 224: Line 230:
 
| 20000
 
| 20000
 
|-
 
|-
| nowrap="nowrap" width="10%" | '''Rendement nominal'''
+
| style="white-space: nowrapwidth: 299px" | '''Rendement nominal'''
| &nbsp;
+
| style="width: 74px" |
| &nbsp;
+
| style="width: 180px" |
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
| 0,75
 
| 0,75
 
| 0,75
 
| 0,75
Line 236: Line 242:
 
| 0,8
 
| 0,8
 
| 0,65
 
| 0,65
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
| 0,89
 
| 0,89
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
|-
 
|-
| '''Autre equipement fourni par le constructeur'''
+
| style="width: 299px" | '''Autre equipement fourni par le constructeur'''
| &nbsp;
+
| style="width: 74px" |  
| &nbsp;
+
| style="width: 180px" |
| align="left" nowrap="nowrap" valign="middle" width="25%" | couplage "Straub" pour la conduit forcée, génerateur synchrone de "meccalte"<br/>(EU) (triphase, n=1500 tr/min, production de 80 kVA, 3x400V, PT100 pour<br/>contrôler la température des paliers et du enroelement) armoire électrique,<br/>installation et mise en marche
+
| style="text-align: left;  white-space: nowrap;  vertical-align: middlewidth: 25%" | couplage "Straub" pour la conduit forcée, génerateur synchrone de "meccalte"<br/>(EU) (triphase, n=1500 tr/min, production de 80 kVA, 3x400V, PT100 pour<br/>contrôler la température des paliers et du enroelement) armoire électrique,<br/>installation et mise en marche
| nowrap="nowrap" width="25%" | flasque pour la conduite, turbine INOX F14/2, génrateur synchrone<br/>AZ100 (triphase, n= 1500 tr/min, fournit électr. tri- et monophasé),<br/>régulateur électrique, amoire électrique CT100.000, pièces de rechrage
+
| style="white-space: nowrapwidth: 25%" | flasque pour la conduite, turbine INOX F14/2, génrateur synchrone<br/>AZ100 (triphase, n= 1500 tr/min, fournit électr. tri- et monophasé),<br/>régulateur électrique, amoire électrique CT100.000, pièces de rechrage
| nowrap="nowrap" width="25%" | flasque pour la conduite, génrateur synchrone AZ100 (triphase,<br/>n= 1500 tr/min, fournit électr. tri- et monophasé), régulateur électrique,<br/>amoire électrique, pièces de recharge
+
| style="white-space: nowrapwidth: 25%" | flasque pour la conduite, génrateur synchrone AZ100 (triphase,<br/>n= 1500 tr/min, fournit électr. tri- et monophasé), régulateur électrique,<br/>amoire électrique, pièces de recharge
| nowrap="nowrap" width="20%" | flasque pour la conduite, turbine, génrateur synchrone,<br/>amoire électrique, pièces de recharge
+
| style="white-space: nowrapwidth: 20%" | flasque pour la conduite, turbine, génrateur synchrone,<br/>amoire électrique, pièces de recharge
| nowrap="nowrap" width="20%" | alternateur (30 kVA) de la marque Euro Power, 50Hz,<br/>1500tr/min, monophasé
+
| style="white-space: nowrapwidth: 20%" | alternateur (30 kVA) de la marque Euro Power, 50Hz,<br/>1500tr/min, monophasé
| nowrap="nowrap" width="20%" | équipement électrique acheté sur l<br/>e marché malgache
+
| style="white-space: nowrapwidth: 20%" | équipement électrique acheté sur l<br/>e marché malgache
| nowrap="nowrap" width="20%" | équipement électrique acheté<br/>sur le marché malgache
+
| style="white-space: nowrapwidth: 20%" | équipement électrique acheté<br/>sur le marché malgache
| nowrap="nowrap" width="20%" | turbine, génerateur synchrone (triphasé,<br/>160 kVA, cos φ= 0,8), régulateru de vitesse, armoire électrique
+
| style="white-space: nowrapwidth: 20%" | turbine, génerateur synchrone (triphasé,<br/>160 kVA, cos φ= 0,8), régulateru de vitesse, armoire électrique
| nowrap="nowrap" width="20%" | équipement électrique acheté sur le marché<br/>malgache, générateur triphasé 35 kVA
+
| style="white-space: nowrapwidth: 20%" | équipement électrique acheté sur le marché<br/>malgache, générateur triphasé 35 kVA
| nowrap="nowrap" width="20%" | turbine, alternateur triphasé, système de<br/>régulation, coupleur, contrôle et commande
+
| style="white-space: nowrapwidth: 20%" | turbine, alternateur triphasé, système de<br/>régulation, coupleur, contrôle et commande
| nowrap="nowrap" width="20%" | turbine, génerateur, armoire électrique<br/>et installation
+
| style="white-space: nowrapwidth: 20%" | turbine, génerateur, armoire électrique<br/>et installation
| nowrap="nowrap" width="20%" | turbine, génerateur synchrone (triphasé,<br/>160 kVA, cos φ= 0,8), régulateru de vitesse, armoire électrique
+
| style="white-space: nowrapwidth: 20%" | turbine, génerateur synchrone (triphasé,<br/>160 kVA, cos φ= 0,8), régulateru de vitesse, armoire électrique
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
| Réhabilitation avec<br/>l'université d'Antsiranana
 
| Réhabilitation avec<br/>l'université d'Antsiranana
| &nbsp;
+
|  
 
| endommagé, ne<br/>fontionne pas
 
| endommagé, ne<br/>fontionne pas
 
| la centrale hydroélectrique la plus grande de Madagaskar
 
| la centrale hydroélectrique la plus grande de Madagaskar
 
| (diamètre rotot = 1 m; 600 tr/min; 2 rotor par arbre<br/>génerateur synchrone, soupape d'admission, équipement<br/>électrique, contrôle et protection
 
| (diamètre rotot = 1 m; 600 tr/min; 2 rotor par arbre<br/>génerateur synchrone, soupape d'admission, équipement<br/>électrique, contrôle et protection
 
| Lily pas encore en exploitation, Ampefy endommagé
 
| Lily pas encore en exploitation, Ampefy endommagé
| &nbsp;
+
|  
 
|-
 
|-
| '''Multiplicateur'''
+
| style="width: 299px" | '''Multiplicateur'''
| &nbsp;
+
| style="width: 74px" |
| &nbsp;
+
| style="width: 180px" |
 
| multiplicateur à courroie plate
 
| multiplicateur à courroie plate
 
| multiplicatuer à courroie dentée
 
| multiplicatuer à courroie dentée
Line 296: Line 302:
 
| direct, avec volant d'intertie
 
| direct, avec volant d'intertie
 
| multiplicateur à courroie
 
| multiplicateur à courroie
| &nbsp;
+
|  
 
| multiplicateur à courroie
 
| multiplicateur à courroie
 
| direct, avec volant d'intertie
 
| direct, avec volant d'intertie
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
|-
 
|-
| '''Régulation de turbine'''
+
| style="width: 299px" | '''Régulation de turbine'''
| &nbsp;
+
| style="width: 74px" |
| &nbsp;
+
| style="width: 180px" |
 
| DTC- Vario ( Saia-Burgess- Suisse) combiné avec régulateuer de charge (systéme hydraulique TA-31 pour régler la vanne distributrice) avec ballst variable (40 kW) pour démarrage, manomètre pour contrôler le niveau de bief d'amont, PT100 pour contrôler la températur des paliers
 
| DTC- Vario ( Saia-Burgess- Suisse) combiné avec régulateuer de charge (systéme hydraulique TA-31 pour régler la vanne distributrice) avec ballst variable (40 kW) pour démarrage, manomètre pour contrôler le niveau de bief d'amont, PT100 pour contrôler la températur des paliers
 
| régulateur électronique avec ballast variable (10kW) de dissipation en eau RMP10000/B, régulation de débit manuel avec vanne générale
 
| régulateur électronique avec ballast variable (10kW) de dissipation en eau RMP10000/B, régulation de débit manuel avec vanne générale
Line 326: Line 332:
 
| régulation des aubes manuelle pour une plage des débit, régulateur automatique (hydraulique) qui ajuste le débit d'eau pour maintenir la vitesse (n=1000tr/min= constant) pour la demande variée
 
| régulation des aubes manuelle pour une plage des débit, régulateur automatique (hydraulique) qui ajuste le débit d'eau pour maintenir la vitesse (n=1000tr/min= constant) pour la demande variée
 
| régulation par absorption
 
| régulation par absorption
| &nbsp;
+
|  
 
| régulation électrique avec ballast variable et régulateur hydraulique
 
| régulation électrique avec ballast variable et régulateur hydraulique
 
| régulateur automatique qui régule la vanne distributrice et ajuste le débit d'eau pour maintenir la vitesse (n=1000tr/min= constant) pour la demande variée
 
| régulateur automatique qui régule la vanne distributrice et ajuste le débit d'eau pour maintenir la vitesse (n=1000tr/min= constant) pour la demande variée
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
| régulatuer de vitesse
 
| régulatuer de vitesse
| &nbsp;
+
|  
| &nbsp;
+
|  
 
|-
 
|-
| nowrap="nowrap" width="15%" | '''Longeur du canal d'amené'''
+
| style="white-space: nowrapwidth: 299px" | '''Longeur du canal d'amené'''
| '''[m]'''
+
| style="width: 74px" | '''[m]'''
| &nbsp;
+
| style="width: 180px" |
 
| 271
 
| 271
 
| 140
 
| 140
 
| 1044
 
| 1044
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
| 630
 
| 630
 
| 510
 
| 510
 
| 135
 
| 135
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
|-
 
|-
| nowrap="nowrap" width="10%" | '''Conduite forcée (matérial, longeur, diamètre)'''
+
| style="white-space: nowrapwidth: 299px" | '''Conduite forcée (matérial, longeur, diamètre)'''
| '''[-/m/mm]'''
+
| style="width: 74px" | '''[-/m/mm]'''
| &nbsp;
+
| style="width: 180px" |
 
| acier/ 42/ 600
 
| acier/ 42/ 600
 
| acier/~35/400
 
| acier/~35/400
Line 389: Line 395:
 
| acier/>12/ 800
 
| acier/>12/ 800
 
| acier/300/800
 
| acier/300/800
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
|-
 
|-
| nowrap="nowrap" width="20%" | '''Production locale de la conduite forcée'''
+
| style="white-space: nowrapwidth: 299px" | '''Production locale de la conduite forcée'''
| '''[x/-]'''
+
| style="width: 74px" | '''[x/-]'''
| &nbsp;
+
| style="width: 180px" |
 
| x
 
| x
 
| non (production francaise)
 
| non (production francaise)
 
| x
 
| x
 
| non (production francaise)
 
| non (production francaise)
| &nbsp;
+
|  
 
| x
 
| x
 
| x
 
| x
 
| x
 
| x
 
| x
 
| x
| &nbsp;
+
|  
 
| x
 
| x
 
| x
 
| x
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
|-
 
|-
| '''Maintenance'''
+
| style="width: 299px" | '''Maintenance'''
| &nbsp;
+
| style="width: 74px" |
| &nbsp;
+
| style="width: 180px" |
 
| vidage du système hydraulique aprés 2-3 ans
 
| vidage du système hydraulique aprés 2-3 ans
| nowrap="nowrap" width="15%" | contrôle des grilles/ filtres, injecteur, courroie; lubrifaction pendant l'opération;<br/>tout le 3 moins hors service pour 1 journée: nettoyage canal d'amené
+
| style="white-space: nowrapwidth: 15%" | contrôle des grilles/ filtres, injecteur, courroie; lubrifaction pendant l'opération;<br/>tout le 3 moins hors service pour 1 journée: nettoyage canal d'amené
| &nbsp;
+
|  
| nowrap="nowrap" width="10%" | contrôle des grilles/ filtres, injecteur, courroie; lubrifaction<br/>pendant l'opération; tout le moins nettoyage de la conduite forcée des algues
+
| style="white-space: nowrapwidth: 10%" | contrôle des grilles/ filtres, injecteur, courroie; lubrifaction<br/>pendant l'opération; tout le moins nettoyage de la conduite forcée des algues
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
| le collaborateur chinois qui est employé à Madagascar s'occupe de la maintenace technique
 
| le collaborateur chinois qui est employé à Madagascar s'occupe de la maintenace technique
| &nbsp;
+
|  
| &nbsp;
+
|  
| nowrap="nowrap" width="10%" | ouverture de la turbine une fois par an, après<br/>la crue nettoyage de la canal d'amenée
+
| style="white-space: nowrapwidth: 10%" | ouverture de la turbine une fois par an, après<br/>la crue nettoyage de la canal d'amenée
| nowrap="nowrap" width="10%" | tous le lundi martin hors service pour l'entretien, problèmes avec la surtension qui endommage le régulateur de tension d'alternateur<br/>et l'arbre qui ne supporte pas le grand moment pendant un changement de charge rapide (3 fois en 25 ans de service)
+
| style="white-space: nowrapwidth: 10%" | tous le lundi martin hors service pour l'entretien, problèmes avec la surtension qui endommage le régulateur de tension d'alternateur<br/>et l'arbre qui ne supporte pas le grand moment pendant un changement de charge rapide (3 fois en 25 ans de service)
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
|-
 
|-
| '''Période de garantie'''
+
| style="width: 299px" | '''Période de garantie'''
| '''[yrs]'''
+
| style="width: 74px" | '''[yrs]'''
| &nbsp;
+
| style="width: 180px" |
 
| 1
 
| 1
 
| 2
 
| 2
Line 474: Line 480:
 
| 10
 
| 10
 
| 10
 
| 10
| &nbsp;
+
|  
 
| 10
 
| 10
| &nbsp;
+
|  
 
| 25
 
| 25
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
|-
 
|-
| rowspan="5" | <br/>'''Spécification du site'''&nbsp;
+
| style="width: 114px" rowspan="5" | <br/>'''Spécification du site'''
| '''Hauteur de chute nette'''
+
| style="width: 299px" | '''Hauteur de chute nette'''
| '''[m]'''
+
| style="width: 74px" | '''[m]'''
| &nbsp;
+
| style="width: 180px" |
 
| 20,3
 
| 20,3
 
| 15
 
| 15
 
| ~75
 
| ~75
 
| 35
 
| 35
| 20&nbsp;
+
| 20
 
| 10
 
| 10
 
| 5
 
| 5
 
| 53
 
| 53
 
| 52
 
| 52
| &nbsp;17
+
| 17
 
| 12
 
| 12
 
| 42
 
| 42
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
| 210
 
| 210
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
| 234
 
| 234
| &nbsp;
+
|  
| &nbsp;
+
|  
 
|-
 
|-
| '''Débit d'équipement'''
+
| style="width: 299px" | '''Débit d'équipement'''
| '''[m³/s]'''
+
| style="width: 74px" | '''[m³/s]'''
| &nbsp;
+
| style="width: 180px" |
 
| 2x 0,442
 
| 2x 0,442
 
| 0,8
 
| 0,8
Line 537: Line 543:
 
| ≈ 0,68
 
| ≈ 0,68
 
| 0,06
 
| 0,06
| &nbsp;
+
|  
 
| 0,545
 
| 0,545
 
| 0,25
 
| 0,25
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
|-
 
|-
| '''Facteur d'utilisation<ref name="null">Please do not consider off-times due to regular maintenance / sans considération des périodes d'immobilisation à cause de la maintenance</ref>'''
+
| style="width: 299px" | '''Facteur d'utilisation<ref name="null">Please do not consider off-times due to regular maintenance / sans considération des périodes d'immobilisation à cause de la maintenance</ref>'''
| '''[full load h/ h per yr]'''
+
| style="width: 74px" | '''[full load h/ h per yr]'''
| &nbsp;
+
| style="width: 180px" |
 
| 1
 
| 1
 
| 1
 
| 1
Line 565: Line 571:
 
| 0,3
 
| 0,3
 
| 0,3
 
| 0,3
| &nbsp;
+
|  
 
| 0,4
 
| 0,4
| &nbsp;
+
|  
| &nbsp;
+
|  
 
| 0,77 (h de fonctionnement/h per year)
 
| 0,77 (h de fonctionnement/h per year)
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
|-
 
|-
| nowrap="nowrap" width="15%" | '''Durée d'immobilisation à cause de la pénurie d'eau&nbsp;'''
+
| style="white-space: nowrapwidth: 299px" | '''Durée d'immobilisation à cause de la pénurie d'eau'''
| '''[days]'''
+
| style="width: 74px" | '''[days]'''
| &nbsp;
+
| style="width: 180px" |
 
| 0
 
| 0
 
| 0
 
| 0
Line 595: Line 601:
 
| 2 moins
 
| 2 moins
 
| presque 0
 
| presque 0
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
| 30
 
| 30
 
| 0
 
| 0
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
|-
 
|-
| '''Connexion au réseau existant'''
+
| style="width: 299px" | '''Connexion au réseau existant'''
| '''[x/-]'''
+
| style="width: 74px" | '''[x/-]'''
| &nbsp;
+
| style="width: 180px" |
 
| -
 
| -
 
| -
 
| -
 
| -
 
| -
| nowrap="nowrap" width="20%" | - (il existe un système hybride avec les panneau photo- voltaik)
+
| style="white-space: nowrapwidth: 20%" | - (il existe un système hybride avec les panneau photo- voltaik)
| &nbsp;
+
|  
 
| -
 
| -
 
| -
 
| -
 
| -
 
| -
| &nbsp;
+
|  
| &nbsp;
+
|  
 
| -
 
| -
 
| -
 
| -
Line 634: Line 640:
 
| x
 
| x
 
| x
 
| x
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
| -
 
| -
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
|-
 
|-
| rowspan="4" nowrap="nowrap" width="7%" | '''Coûts d' investissement<br/>initials<br/>[monnaie du<br/>contract d'achet]'''<br/>
+
| style="white-space: nowrap;  width: 114px" rowspan="4" | '''Coûts d' investissement<br/>initials<br/>[monnaie du<br/>contract d'achet]'''
| '''Turbine'''
+
| style="width: 299px" | '''Turbine'''
| &nbsp;
+
| style="width: 74px" |
| nowrap="nowrap" width="10%" |  
+
| style="white-space: nowrapwidth: 180px" |  
 
| 2 x 66585 USD
 
| 2 x 66585 USD
 
| 287 870 004 Ar
 
| 287 870 004 Ar
| &nbsp;
+
|  
| &nbsp;
+
|  
 
| 12000000 Ar
 
| 12000000 Ar
| &nbsp;5050000 Ar
+
| 5050000 Ar
| nowrap="nowrap" width="10%" | 5080000
+
| style="white-space: nowrapwidth: 10%" | 5080000
 
| rowspan="2" | 60 000 USD
 
| rowspan="2" | 60 000 USD
 
| 18000000 Ar
 
| 18000000 Ar
| &nbsp;
+
|  
 
| rowspan="2" | 5400046144 FMG
 
| rowspan="2" | 5400046144 FMG
 
| rowspan="3" | 1200000 Franc (francais en 1982)
 
| rowspan="3" | 1200000 Franc (francais en 1982)
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
|-
 
|-
| '''Génerateur'''
+
| style="width: 299px" | '''Génerateur'''
| &nbsp;
+
| style="width: 74px" |
| &nbsp;
+
| style="width: 180px" |
 
| 2 x 28050 USD
 
| 2 x 28050 USD
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
| 5000000 Ar
 
| 5000000 Ar
 
| 2100000 Ar
 
| 2100000 Ar
 
| 2100000 Ar
 
| 2100000 Ar
| 2500000 Ar&nbsp;
+
| 2500000 Ar
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
|-
 
|-
| '''Conduite forcée'''
+
| style="width: 299px" | '''Conduite forcée'''
| &nbsp;
+
| style="width: 74px" |
| &nbsp;
+
| style="width: 180px" |
| &nbsp;
+
|  
 
| 28 000 000 Ar
 
| 28 000 000 Ar
| &nbsp;
+
|  
| &nbsp;
+
|  
 
| 20240000 Ar
 
| 20240000 Ar
 
| 11040000 Ar
 
| 11040000 Ar
 
| 5060000 Ar
 
| 5060000 Ar
| &nbsp;
+
|  
 
| 35000000 Ar
 
| 35000000 Ar
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
|-
 
|-
| '''Exonération de T.V.A.'''
+
| style="width: 299px" | '''Exonération de T.V.A.'''
| '''[x/-]'''
+
| style="width: 74px" | '''[x/-]'''
| &nbsp;
+
| style="width: 180px" |
 
| -
 
| -
 
| -
 
| -
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
| - (mais pas de tax d'im-porta-tion)
 
| - (mais pas de tax d'im-porta-tion)
| &nbsp;
+
|  
| &nbsp;
+
|  
 
| -
 
| -
 
| x
 
| x
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
|-
 
|-
| colspan="2" | '''Remarques'''
+
| style="width: 473px" colspan="2" | '''Remarques'''
| &nbsp;
+
| style="width: 74px" |
| &nbsp;
+
| style="width: 180px" |
 
| système de contrôle et diagnostique à distance envisager, problème d'arrêt d'urgence (piques de demande) (<ref name="eins">fonctionnement: problème avec l'arrêt d'urgence (2 fois par jour de 2 à 15 minutes): à cause de démarrage des moteur (triphasé) sans montage en étoile- triangle qui provoquent un courant énorme (effet comme court-circuit U vers 0, I vers ∞), cela produit un pique de demande (P vers ∞) pour un instant qui ne peut pas être compenser par la centrale rapidement ( P↑ conduit à n↓) et les fusibles effectue l'arrêt d'urgence, en plus: le transmission par le réseau et le temps de réaction de système de réglage ralenti l'adaptation, il faudra mieux le montage en triangle- étoile ou un système électrique (réglage électrique) amélioré dans la centrale qui est très cher; constructeur ENTEC: le service d'ENTEC est super mais aussi cher, au début pour gagner d'expérience mais prochainement la turbine directement de Heysa Indonésie est préféré sans service d'ENTEC, on transfère les dates de fonctionnement périodiquement, un système d'opération, contrôle et diagnostique à distance est envisagé dans 5 ans peut- être, maintenant il y a des problèmes de début, pas encore fonctionnement routinier</ref>)
 
| système de contrôle et diagnostique à distance envisager, problème d'arrêt d'urgence (piques de demande) (<ref name="eins">fonctionnement: problème avec l'arrêt d'urgence (2 fois par jour de 2 à 15 minutes): à cause de démarrage des moteur (triphasé) sans montage en étoile- triangle qui provoquent un courant énorme (effet comme court-circuit U vers 0, I vers ∞), cela produit un pique de demande (P vers ∞) pour un instant qui ne peut pas être compenser par la centrale rapidement ( P↑ conduit à n↓) et les fusibles effectue l'arrêt d'urgence, en plus: le transmission par le réseau et le temps de réaction de système de réglage ralenti l'adaptation, il faudra mieux le montage en triangle- étoile ou un système électrique (réglage électrique) amélioré dans la centrale qui est très cher; constructeur ENTEC: le service d'ENTEC est super mais aussi cher, au début pour gagner d'expérience mais prochainement la turbine directement de Heysa Indonésie est préféré sans service d'ENTEC, on transfère les dates de fonctionnement périodiquement, un système d'opération, contrôle et diagnostique à distance est envisagé dans 5 ans peut- être, maintenant il y a des problèmes de début, pas encore fonctionnement routinier</ref>)
 
| installation par elec.&eau même, incident à cause d'une plache dans la conduite forcée
 
| installation par elec.&eau même, incident à cause d'une plache dans la conduite forcée
| &nbsp;
+
|  
 
| alimentation d'un hospitale, demande constante, réglage suplementaire pas necessaire (<ref name="zwei">opérateur: ESF (électricité Sans Frontières: electriciens-sans-frontieres.org) est une association française (ONG) qui était fondé par salariés d'EDF, ils sont aussi engagés dans la domaine solaire, photovoltaik et éolienne partout à Madagascar et dans le monde, par l'aide de la France et Europe; projet social: projet à Ampitafa: aide au développement de Akamasoa (projet d'aide fondé par Pater Pedro, aussi à Tana, www.perepedro.com), qui ont aussi 3 centres de formation professionnelle (aussi mécanique général) qui sont connecté avec les ouvrage technique de l'association pour informes les jeunes et les recruter</ref>)
 
| alimentation d'un hospitale, demande constante, réglage suplementaire pas necessaire (<ref name="zwei">opérateur: ESF (électricité Sans Frontières: electriciens-sans-frontieres.org) est une association française (ONG) qui était fondé par salariés d'EDF, ils sont aussi engagés dans la domaine solaire, photovoltaik et éolienne partout à Madagascar et dans le monde, par l'aide de la France et Europe; projet social: projet à Ampitafa: aide au développement de Akamasoa (projet d'aide fondé par Pater Pedro, aussi à Tana, www.perepedro.com), qui ont aussi 3 centres de formation professionnelle (aussi mécanique général) qui sont connecté avec les ouvrage technique de l'association pour informes les jeunes et les recruter</ref>)
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
| (<ref name="drei">constructeur: sont choisi un constructeur chinois parce' que la durée de fabrication chez Ossberger p.e. est trop longue: 18 mois; la production en Chine ou Indonésie dure seulement 6 mois; conduite forcée: une conduite en PVC était prévu mais on a installé une conduite en acier production locale parce que c'est moins cher (tuyaux PVC diamètre supérieur à 250 mm importé) et plus pratique à l'air libre (pas d'intégration et moins risque d'érosion du terrain</ref>)
 
| (<ref name="drei">constructeur: sont choisi un constructeur chinois parce' que la durée de fabrication chez Ossberger p.e. est trop longue: 18 mois; la production en Chine ou Indonésie dure seulement 6 mois; conduite forcée: une conduite en PVC était prévu mais on a installé une conduite en acier production locale parce que c'est moins cher (tuyaux PVC diamètre supérieur à 250 mm importé) et plus pratique à l'air libre (pas d'intégration et moins risque d'érosion du terrain</ref>)
| &nbsp;
+
|  
| &nbsp;
+
|  
 
| (<ref name="vier">production: maintenant (avril 2010) production entre 18 et 39 kW (24h/24h) pour l'alimentation de 180 ménages et 3 stations productives</ref>)
 
| (<ref name="vier">production: maintenant (avril 2010) production entre 18 et 39 kW (24h/24h) pour l'alimentation de 180 ménages et 3 stations productives</ref>)
 
| système hybride pour les demande point et pendant la periode de pénurie d'eau, 3 groupe électro- méc. étaient prevu (<ref name="fünf">coté technique: l'arbre devant l'accouplement était 3 fois cassé pendant les 25 ans de fonctionnement à cause de la variation de charge très forte, cela à causé des grandes entretiens; coté technique: problèmes avec le régulateur de tension d'alternateur à cause de la surtension</ref>)
 
| système hybride pour les demande point et pendant la periode de pénurie d'eau, 3 groupe électro- méc. étaient prevu (<ref name="fünf">coté technique: l'arbre devant l'accouplement était 3 fois cassé pendant les 25 ans de fonctionnement à cause de la variation de charge très forte, cela à causé des grandes entretiens; coté technique: problèmes avec le régulateur de tension d'alternateur à cause de la surtension</ref>)
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
| [http://www.eib.europa.eu/projects/pipeline/2007/20070306.htm http://www.eib.europa.eu/projects/pipeline/2007/20070306.htm]
 
| [http://www.eib.europa.eu/projects/pipeline/2007/20070306.htm http://www.eib.europa.eu/projects/pipeline/2007/20070306.htm]
 
| [http://www.andritz.com/ANONID3E7C786C66706EFF/hydro-references-compact-hydro-mandraka http://www.andritz.com/ANONID3E7C786C66706EFF/hydro-references-compact-hydro-mandraka]
 
| [http://www.andritz.com/ANONID3E7C786C66706EFF/hydro-references-compact-hydro-mandraka http://www.andritz.com/ANONID3E7C786C66706EFF/hydro-references-compact-hydro-mandraka]
| &nbsp;
+
|  
| &nbsp;
+
|  
 
|}
 
|}
 
 
== <br/>English<br/> ==
 
== <br/>English<br/> ==
  
{| style="width: 100%" border="1" cellpadding="1" cellspacing="1" width="25%"
+
{| cellspacing="1" cellpadding="1" border="1" style="width: 25%;  width: 100%"
 
|-
 
|-
| colspan="2" | '''Turbine manufacturer'''
+
| colspan="2" style="background-color: rgb(204, 204, 204)" | '''Turbine manufacturer'''
| &nbsp;
+
 
| MADAGASKAR
+
| style="background-color: rgb(204, 204, 204)" |
| nowrap="nowrap" width="15%" | ENTEC Indonesien
+
| style="background-color: rgb(204, 204, 204)" | MADAGASKAR
| IREM Italy
+
| style="white-space: nowrapwidth: 15%;  background-color: rgb(204, 204, 204)" | ENTEC Indonesien
| IREM Italy
+
| style="background-color: rgb(204, 204, 204)" | IREM Italy
| IREM Italy
+
| style="background-color: rgb(204, 204, 204)" | IREM Italy
| Vitasoa
+
| style="background-color: rgb(204, 204, 204)" | IREM Italy
| AIDER
+
| style="background-color: rgb(204, 204, 204)" | Vitasoa
| AIDER
+
| style="background-color: rgb(204, 204, 204)" | AIDER
| Shao Yang
+
| style="background-color: rgb(204, 204, 204)" | AIDER
| Vitasoa
+
| style="background-color: rgb(204, 204, 204)" | Shao Yang
| AIDER
+
| style="background-color: rgb(204, 204, 204)" | Vitasoa
| JLA & Co.
+
| style="background-color: rgb(204, 204, 204)" | AIDER
| C.Dumont (n'existe plus)
+
| style="background-color: rgb(204, 204, 204)" | JLA & Co.
| &nbsp;
+
| style="background-color: rgb(204, 204, 204)" | C.Dumont (n'existe plus)
| &nbsp;
+
| style="background-color: rgb(204, 204, 204)" |
| &nbsp;
+
| style="background-color: rgb(204, 204, 204)" |
| &nbsp;
+
| style="background-color: rgb(204, 204, 204)" |
| nowrap="nowrap" width="10%" | Hunan Lingling
+
| style="background-color: rgb(204, 204, 204)" |
| &nbsp;
+
| style="white-space: nowrapwidth: 10%;  background-color: rgb(204, 204, 204)" | Hunan Lingling
| &nbsp;
+
| style="background-color: rgb(204, 204, 204)" |
| &nbsp;
+
| style="background-color: rgb(204, 204, 204)" |
| &nbsp;
+
| style="background-color: rgb(204, 204, 204)" |
| &nbsp;
+
| style="background-color: rgb(204, 204, 204)" |
| &nbsp;
+
| style="background-color: rgb(204, 204, 204)" |
| VA TECH (fr)
+
| style="background-color: rgb(204, 204, 204)" |
| &nbsp;
+
| style="background-color: rgb(204, 204, 204)" | VA TECH (fr)
| &nbsp;
+
| style="background-color: rgb(204, 204, 204)" |
 +
| style="background-color: rgb(204, 204, 204)" |
 
|-
 
|-
| colspan="2" nowrap="nowrap" width="10%" | '''Project site (place, region)'''
+
| style="white-space: nowrap;  width: 10%" colspan="2" | '''Project site (place, region)'''
| &nbsp;
+
|  
| &nbsp;
+
|  
 
| Ankazomiriotra/ Andriatsemboka
 
| Ankazomiriotra/ Andriatsemboka
 
| Mangamila (Anjozorobe)/ Antananarivo
 
| Mangamila (Anjozorobe)/ Antananarivo
Line 835: Line 841:
 
| Ampitafa
 
| Ampitafa
 
| Ranotsara Nord (Iakora)/ Fianaratsoa
 
| Ranotsara Nord (Iakora)/ Fianaratsoa
| nowrap="nowrap" width="20%" | Anosibe Trimoloharano (Andramasina)/ Antananarivo
+
| style="white-space: nowrapwidth: 20%" | Anosibe Trimoloharano (Andramasina)/ Antananarivo
 
| Ambohijoky/ Antananarivo
 
| Ambohijoky/ Antananarivo
 
| Ranomainty
 
| Ranomainty
 
| Ambosary gara
 
| Ambosary gara
 
| Merikanjaka
 
| Merikanjaka
| nowrap="nowrap" width="20%" | Antetezambato, Tsarasaotra, Ambositra
+
| style="white-space: nowrapwidth: 20%" | Antetezambato, Tsarasaotra, Ambositra
 
| Sahamadio- Fisakana
 
| Sahamadio- Fisakana
| nowrap="nowrap" width="15%" | Ankazobe/ Antananarive
+
| style="white-space: nowrapwidth: 15%" | Ankazobe/ Antananarive
 
| Tsiazompaniry
 
| Tsiazompaniry
 
| Fianarantsoa
 
| Fianarantsoa
| nowrap="nowrap" width="15%" | Volobe/ Toamasine
+
| style="white-space: nowrapwidth: 15%" | Volobe/ Toamasine
 
| Sahanivotry
 
| Sahanivotry
| nowrap="nowrap" width="15%" | Antelomita (for Tana)
+
| style="white-space: nowrapwidth: 15%" | Antelomita (for Tana)
| nowrap="nowrap" width="15%" | Namorona (Fianarantsoa)
+
| style="white-space: nowrapwidth: 15%" | Namorona (Fianarantsoa)
| nowrap="nowrap" width="15%" | Tsiazompaniry/Antananarive
+
| style="white-space: nowrapwidth: 15%" | Tsiazompaniry/Antananarive
| nowrap="nowrap" width="15%" | Manandray (Fianarantsoa)
+
| style="white-space: nowrapwidth: 15%" | Manandray (Fianarantsoa)
| nowrap="nowrap" width="15%" | Vatomandry/ Toamasina
+
| style="white-space: nowrapwidth: 15%" | Vatomandry/ Toamasina
 
| Andekaleka (district Brickaville), for Tana
 
| Andekaleka (district Brickaville), for Tana
 
| Mandraka (70 km de Tana), for Tana
 
| Mandraka (70 km de Tana), for Tana
| Lily&nbsp;?/Ampefy? /Antananarive
+
| Lily ?/Ampefy? /Antananarive
| nowrap="nowrap" width="15%" | Manandona/ Antanarivo
+
| style="white-space: nowrapwidth: 15%" | Manandona/ Antanarivo
 
|-
 
|-
 
| colspan="2" | '''Operator'''
 
| colspan="2" | '''Operator'''
 
| '''(SME/NGO/Community)'''
 
| '''(SME/NGO/Community)'''
| &nbsp;
+
|  
 
| Power and Water (SME)
 
| Power and Water (SME)
 
| Elec. & Eau (SME)
 
| Elec. & Eau (SME)
Line 884: Line 890:
 
| JIRAMA
 
| JIRAMA
 
| JIRAMA
 
| JIRAMA
| &nbsp;
+
|  
| &nbsp;
+
|  
 
|-
 
|-
 
| colspan="2" | '''Financing institution'''
 
| colspan="2" | '''Financing institution'''
| &nbsp;
+
|  
| &nbsp;
+
|  
| 70&nbsp;% ADER, 30&nbsp;% fund (own contribution and credit)
+
| 70 % ADER, 30 % fund (own contribution and credit)
| 70% ADER, <30% Elec. & Eau,&nbsp;community contribution:&nbsp;workforce
+
| 70% ADER, <30% Elec. & Eau, community contribution: workforce
 
| ADER, Elec. & Eau and community
 
| ADER, Elec. & Eau and community
 
| 100% ESF
 
| 100% ESF
 
| ADER, Community
 
| ADER, Community
 
| ADER - AIDER- Tany Meva - IME
 
| ADER - AIDER- Tany Meva - IME
| nowrap="nowrap" width="20%" | ADER - AIDER - Tany Meva - IME
+
| style="white-space: nowrapwidth: 20%" | ADER - AIDER - Tany Meva - IME
 
| 70% ADER, 30% Sermad
 
| 70% ADER, 30% Sermad
 
| ADER, Vitasoa, Community
 
| ADER, Vitasoa, Community
 
| ADER , AIDER, Tany Meva
 
| ADER , AIDER, Tany Meva
 
| 100% GEPF
 
| 100% GEPF
| nowrap="nowrap" width="25%" | 90%&nbsp;european fund&nbsp;(FED), 5% etat Madagscar, 5% canadian embassy
+
| style="white-space: nowrapwidth: 25%" | 90% european fund (FED), 5% etat Madagscar, 5% canadian embassy
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
| FNE (national electrification fund)
 
| FNE (national electrification fund)
 
| BEI (europe)
 
| BEI (europe)
| &nbsp;
+
|  
| &nbsp;
+
|  
 
|-
 
|-
 
| colspan="2" | '''Commissioning'''
 
| colspan="2" | '''Commissioning'''
| &nbsp;
+
|  
| &nbsp;
+
|  
 
| 2009
 
| 2009
 
| 2009 (June)
 
| 2009 (June)
Line 927: Line 933:
 
| 2009
 
| 2009
 
| 2009
 
| 2009
| May&nbsp;2010
+
| May 2010
 
| 2010
 
| 2010
 
| 2010
 
| 2010
 
| 2000
 
| 2000
 
| 1985
 
| 1985
| &nbsp;
+
|  
 
| 2009
 
| 2009
| &nbsp;
+
|  
| &nbsp;
+
|  
 
| 2008
 
| 2008
 
| 1952, renewal
 
| 1952, renewal
| &nbsp;
+
|  
 
| 2008
 
| 2008
| &nbsp;
+
|  
| &nbsp;
+
|  
| new bloc&nbsp;2009
+
| new bloc 2009
 
| 2004
 
| 2004
 
| 2009
 
| 2009
| &nbsp;
+
|  
 
|-
 
|-
 
| rowspan="11" | <br/>'''Equipment'''
 
| rowspan="11" | <br/>'''Equipment'''
 
| '''Turbine type'''
 
| '''Turbine type'''
| &nbsp;
+
|  
| &nbsp;
+
|  
 
| Banki, T14- D300
 
| Banki, T14- D300
 
| Banki
 
| Banki
Line 963: Line 969:
 
| Banki
 
| Banki
 
| Francis
 
| Francis
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
| Francis
 
| Francis
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
| Pelton (vertical, 4 jet, 2 rotor)
 
| Pelton (vertical, 4 jet, 2 rotor)
| &nbsp;
+
|  
| &nbsp;
+
|  
 
|-
 
|-
 
| '''Capacity'''
 
| '''Capacity'''
 
| '''[kW]'''
 
| '''[kW]'''
| &nbsp;
+
|  
 
| 2 x 58
 
| 2 x 58
 
| 85
 
| 85
Line 998: Line 1,004:
 
| 6760
 
| 6760
 
| 5676
 
| 5676
| &nbsp;
+
|  
 
| 5000
 
| 5000
 
| 5200
 
| 5200
Line 1,008: Line 1,014:
 
| 20000
 
| 20000
 
|-
 
|-
| nowrap="nowrap" width="10%" | '''Nominal efficiency'''
+
| style="white-space: nowrapwidth: 10%" | '''Nominal efficiency'''
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
| 0,75
 
| 0,75
 
| 0,75
 
| 0,75
Line 1,020: Line 1,026:
 
| 0,8
 
| 0,8
 
| 0,65
 
| 0,65
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
| 0,89
 
| 0,89
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
|-
 
|-
 
| '''Other equipment delivered by the manufacturer'''
 
| '''Other equipment delivered by the manufacturer'''
| &nbsp;
+
|  
| &nbsp;
+
|  
| nowrap="nowrap" width="15%" | "Straub" coupling for the high pressure pipe, synchronized generator by "Mecc Alte" (EU)<br/>&nbsp;three-phase, n=1500 rpm, production of 80 kVA, 3x400V, PT100&nbsp;to control temperature of<br/>bearings and coil of wire), electric control cabinet, installation and initial operation
+
| style="white-space: nowrapwidth: 15%" | "Straub" coupling for the high pressure pipe, synchronized generator by "Mecc Alte" (EU)<br/>three-phase, n=1500 rpm, production of 80 kVA, 3x400V, PT100 to control temperature of<br/>bearings and coil of wire), electric control cabinet, installation and initial operation
| nowrap="nowrap" width="25%" | flange for plumbing, turbine INOX F14/2, synchronized generator<br/>AZ100 (three-phase, n= 1500 rpm, fournit électr. three- and mono-phase),<br/>electrical controller, electric control cabinet CT100.000, charging station
+
| style="white-space: nowrapwidth: 25%" | flange for plumbing, turbine INOX F14/2, synchronized generator<br/>AZ100 (three-phase, n= 1500 rpm, fournit électr. three- and mono-phase),<br/>electrical controller, electric control cabinet CT100.000, charging station
| nowrap="nowrap" width="25%" | flange for plumbing, synchronized generator AZ100 (three-phase,<br/>n= 1500 rpm, fournit électr. three- and mono-phase), electrical<br/>controller, electric control cabinet, charging station
+
| style="white-space: nowrapwidth: 25%" | flange for plumbing, synchronized generator AZ100 (three-phase,<br/>n= 1500 rpm, fournit électr. three- and mono-phase), electrical<br/>controller, electric control cabinet, charging station
| nowrap="nowrap" width="20%" | flange for plumbing, turbine, synchronized generator,<br/>electric control cabinet, charging station
+
| style="white-space: nowrapwidth: 20%" | flange for plumbing, turbine, synchronized generator,<br/>electric control cabinet, charging station
| nowrap="nowrap" width="20%" | alternator (30 kVA)&nbsp; Euro Power, 50Hz,<br/>1500 rpm, mono-phase
+
| style="white-space: nowrapwidth: 20%" | alternator (30 kVA) Euro Power, 50Hz,<br/>1500 rpm, mono-phase
| nowrap="nowrap" width="20%" | electrical equipment bought<br/>at&nbsp;the madagascan market&nbsp;
+
| style="white-space: nowrapwidth: 20%" | electrical equipment bought<br/>at the madagascan market
| nowrap="nowrap" width="20%" | electrical equipment bought<br/>at the madagascan market
+
| style="white-space: nowrapwidth: 20%" | electrical equipment bought<br/>at the madagascan market
| nowrap="nowrap" width="20%" | turbine,&nbsp;synchronized generator&nbsp;(three-phase,<br/>160 kVA, cos φ= 0,8), speed governor, electric<br/>control cabinet
+
| style="white-space: nowrapwidth: 20%" | turbine, synchronized generator (three-phase,<br/>160 kVA, cos φ= 0,8), speed governor, electric<br/>control cabinet
| nowrap="nowrap" width="20%" | electrical equipment bought<br/>at the madagascan market,<br/>three-phased generator 35 kVA
+
| style="white-space: nowrapwidth: 20%" | electrical equipment bought<br/>at the madagascan market,<br/>three-phased generator 35 kVA
| nowrap="nowrap" width="20%" | turbine, three-phased alternator, regulation system,<br/>circuit breaker,&nbsp;control and command&nbsp;
+
| style="white-space: nowrapwidth: 20%" | turbine, three-phased alternator, regulation system,<br/>circuit breaker, control and command
| nowrap="nowrap" width="20%" | turbine, generator, electric control cabinet<br/>and installation
+
| style="white-space: nowrapwidth: 20%" | turbine, generator, electric control cabinet<br/>and installation
| nowrap="nowrap" width="20%" | turbine,&nbsp;synchronized&nbsp;generator&nbsp;(three-phased,<br/>160 kVA, cos φ= 0,8), speed governor, electric control&nbsp;cabinet
+
| style="white-space: nowrapwidth: 20%" | turbine, synchronized generator (three-phased,<br/>160 kVA, cos φ= 0,8), speed governor, electric control cabinet
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
| renovation together with the university of Antsiranana
 
| renovation together with the university of Antsiranana
| &nbsp;
+
|  
 
| damaged, does not work anymore
 
| damaged, does not work anymore
 
| the biggest hydroelectric control centre in Madagascar
 
| the biggest hydroelectric control centre in Madagascar
 
| (rotor diameter = 1 m; 600 rpm; 2 rotors each arbor<br/>synchronized generator, admission valve, electrical equipment, control and protection
 
| (rotor diameter = 1 m; 600 rpm; 2 rotors each arbor<br/>synchronized generator, admission valve, electrical equipment, control and protection
 
| Lily no longer operating, Ampefy damaged
 
| Lily no longer operating, Ampefy damaged
| &nbsp;
+
|  
 
|-
 
|-
 
| '''Speed ''''''increaser'''
 
| '''Speed ''''''increaser'''
| &nbsp;
+
|  
| &nbsp;
+
|  
 
| multiplicator to flat belt
 
| multiplicator to flat belt
| multiplicator to&nbsp;gear belt
+
| multiplicator to gear belt
 
| direct
 
| direct
 
| multiplicator to gear belt
 
| multiplicator to gear belt
Line 1,080: Line 1,086:
 
| direct, with balance wheel
 
| direct, with balance wheel
 
| multiplicator to belt
 
| multiplicator to belt
| &nbsp;
+
|  
| multiplicator&nbsp;to belt&nbsp;
+
| multiplicator to belt
 
| direct, with balance wheel
 
| direct, with balance wheel
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
|-
 
|-
 
| '''Turbine control'''
 
| '''Turbine control'''
| &nbsp;
+
|  
| &nbsp;
+
|  
| DTC- Vario ( Saia-Burgess-Suisse) combined with charge regulator (hydraulic system&nbsp;TA-31&nbsp;to control&nbsp;the guide vane) with variable ballast (40 kW) for start-up,&nbsp;manometer for controlling&nbsp;the level of headwater, PT100 for controlling the temperature of bearings
+
| DTC- Vario ( Saia-Burgess-Suisse) combined with charge regulator (hydraulic system TA-31 to control the guide vane) with variable ballast (40 kW) for start-up, manometer for controlling the level of headwater, PT100 for controlling the temperature of bearings
| electrical controller with variable (10kW) dissipation loss in water RMP10000/B, manual regulation of&nbsp;discharge with&nbsp;general guide vane
+
| electrical controller with variable (10kW) dissipation loss in water RMP10000/B, manual regulation of discharge with general guide vane
 
| electrical controller with variable dissipation loss in water, manual regulation of discharge with general guide vane
 
| electrical controller with variable dissipation loss in water, manual regulation of discharge with general guide vane
 
| electrical controller with variable dissipation loss, manual regulation of discharge with general guide vane
 
| electrical controller with variable dissipation loss, manual regulation of discharge with general guide vane
Line 1,108: Line 1,114:
 
| electric regulation with variable ballast
 
| electric regulation with variable ballast
 
| electric regulation with variable ballast
 
| electric regulation with variable ballast
| nowrap="nowrap" width="15%" | regulation of manual paddles for a&nbsp;range of discharge, automatic regulator<br/>(hydraulic) that adjusts&nbsp;the discharge of water&nbsp;to&nbsp;maintain velocity&nbsp;<br/>(n=1000rpm= constant) for a varying demand
+
| style="white-space: nowrapwidth: 15%" | regulation of manual paddles for a range of discharge, automatic regulator<br/>(hydraulic) that adjusts the discharge of water to maintain velocity<br/>(n=1000rpm= constant) for a varying demand
 
| regulation by absorption
 
| regulation by absorption
| &nbsp;
+
|  
| electric regulation with variable ballast and&nbsp;hydraulic regulation
+
| electric regulation with variable ballast and hydraulic regulation
| &nbsp;automatic regulator that regulates the distribution valve and adjusts the discharge<br/>of water to maintain velocity (n=1000rpm= constant) for a varying demand
+
| automatic regulator that regulates the distribution valve and adjusts the discharge<br/>of water to maintain velocity (n=1000rpm= constant) for a varying demand
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
| speed governor
 
| speed governor
| &nbsp;
+
|  
| &nbsp;
+
|  
 
|-
 
|-
| nowrap="nowrap" width="15%" | '''Length head-race channel'''
+
| style="white-space: nowrapwidth: 15%" | '''Length head-race channel'''
 
| '''[m]'''
 
| '''[m]'''
| &nbsp;
+
|  
 
| 271
 
| 271
 
| 140
 
| 140
 
| 1044
 
| 1044
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
| 630
 
| 630
 
| 510
 
| 510
 
| 135
 
| 135
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
|-
 
|-
| nowrap="nowrap" width="10%" | '''Penstock (material, length, diameter)'''
+
| style="white-space: nowrapwidth: 10%" | '''Penstock (material, length, diameter)'''
 
| '''[-/m/mm]'''
 
| '''[-/m/mm]'''
| &nbsp;
+
|  
 
| steel/ 42/ 600
 
| steel/ 42/ 600
 
| steel/~35/400
 
| steel/~35/400
Line 1,173: Line 1,179:
 
| steel/>12/ 800
 
| steel/>12/ 800
 
| steel/300/800
 
| steel/300/800
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
|-
 
|-
| nowrap="nowrap" width="20%" | '''Local production of penstock'''
+
| style="white-space: nowrapwidth: 20%" | '''Local production of penstock'''
 
| '''[x/-]'''
 
| '''[x/-]'''
| &nbsp;
+
|  
 
| x
 
| x
 
| no (french production)
 
| no (french production)
 
| x
 
| x
 
| no (french production)
 
| no (french production)
| &nbsp;
+
|  
 
| x
 
| x
 
| x
 
| x
 
| x
 
| x
 
| x
 
| x
| &nbsp;
+
|  
 
| x
 
| x
 
| x
 
| x
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
|-
 
|-
| '''Maintenance'''<br/>&nbsp;
+
| '''Maintenance'''
| &nbsp;
+
|  
| &nbsp;
+
|  
 
| draining of the hydraulic system every 2-3 years
 
| draining of the hydraulic system every 2-3 years
| nowrap="nowrap" width="15%" | control of fence/filtres,injection valve, belt; lubrication while operation;every<br/>three months switching-off for one day:cleaning of intake canal
+
| style="white-space: nowrapwidth: 15%" | control of fence/filtres,injection valve, belt; lubrication while operation;every<br/>three months switching-off for one day:cleaning of intake canal
| &nbsp;
+
|  
| nowrap="nowrap" width="10%" | control of fence/filtres, injection valve, belt; lubrication while operation;<br/>every&nbsp;month cleaning of&nbsp;the high pressure pipe from algae
+
| style="white-space: nowrapwidth: 10%" | control of fence/filtres, injection valve, belt; lubrication while operation;<br/>every month cleaning of the high pressure pipe from algae
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
| the chinese partner in Madagascar is in charge of the technical<br/>maintenace
 
| the chinese partner in Madagascar is in charge of the technical<br/>maintenace
| &nbsp;
+
|  
| &nbsp;
+
|  
| nowrap="nowrap" width="10%" | notch of the turbine once a year, after flooding<br/>cleaning of the head race canal
+
| style="white-space: nowrapwidth: 10%" | notch of the turbine once a year, after flooding<br/>cleaning of the head race canal
| nowrap="nowrap" width="10%" | every monday morning switching-off due to maintenance, problems with capacity overload that damages<br/>the voltage controller of the alternator and the arbor that does not endure the moments during quick charge changing (3 times in 25 years of service)
+
| style="white-space: nowrapwidth: 10%" | every monday morning switching-off due to maintenance, problems with capacity overload that damages<br/>the voltage controller of the alternator and the arbor that does not endure the moments during quick charge changing (3 times in 25 years of service)
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
|-
 
|-
 
| '''Warrenty period'''
 
| '''Warrenty period'''
 
| '''[yrs]'''
 
| '''[yrs]'''
| &nbsp;
+
|  
 
| 1
 
| 1
 
| 2
 
| 2
Line 1,258: Line 1,264:
 
| 10
 
| 10
 
| 10
 
| 10
| &nbsp;
+
|  
 
| 10
 
| 10
| &nbsp;
+
|  
 
| 25
 
| 25
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
|-
 
|-
 
| rowspan="5" | <br/>'''Side specification'''
 
| rowspan="5" | <br/>'''Side specification'''
 
| '''Net head'''
 
| '''Net head'''
 
| '''[m]'''
 
| '''[m]'''
| &nbsp;
+
|  
 
| 20,3
 
| 20,3
 
| 15
 
| 15
 
| ~75
 
| ~75
 
| 35
 
| 35
| 20&nbsp;
+
| 20
 
| 10
 
| 10
 
| 5
 
| 5
 
| 53
 
| 53
 
| 52
 
| 52
| &nbsp;17
+
| 17
 
| 12
 
| 12
 
| 42
 
| 42
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
| 210
 
| 210
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
| 234
 
| 234
| &nbsp;
+
|  
| &nbsp;
+
|  
 
|-
 
|-
 
| '''Design flow'''
 
| '''Design flow'''
 
| '''[m³/s]'''
 
| '''[m³/s]'''
| &nbsp;
+
|  
 
| 2x 0,442
 
| 2x 0,442
 
| 0,8
 
| 0,8
Line 1,321: Line 1,327:
 
| ≈ 0,68
 
| ≈ 0,68
 
| 0,06
 
| 0,06
| &nbsp;
+
|  
 
| 0,545
 
| 0,545
 
| 0,25
 
| 0,25
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
|-
 
|-
 
| '''Utilisation factor<ref name="null">_</ref>'''
 
| '''Utilisation factor<ref name="null">_</ref>'''
 
| '''[full load h/ h per yr]'''
 
| '''[full load h/ h per yr]'''
| &nbsp;
+
|  
 
| 1
 
| 1
 
| 1
 
| 1
Line 1,349: Line 1,355:
 
| 0,3
 
| 0,3
 
| 0,3
 
| 0,3
| &nbsp;
+
|  
 
| 0,4
 
| 0,4
| &nbsp;
+
|  
| &nbsp;
+
|  
 
| 0,77 (h of work/h per year)
 
| 0,77 (h of work/h per year)
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
|-
 
|-
| nowrap="nowrap" width="15%" | '''Off time due to water shortage'''
+
| style="white-space: nowrapwidth: 15%" | '''Off time due to water shortage'''
 
| '''[days]'''
 
| '''[days]'''
| &nbsp;
+
|  
 
| 0
 
| 0
 
| 0
 
| 0
Line 1,378: Line 1,384:
 
| 4h/day during shortages
 
| 4h/day during shortages
 
| 2 months
 
| 2 months
| close to&nbsp;0
+
| close to 0
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
| 30
 
| 30
 
| 0
 
| 0
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
|-
 
|-
 
| '''Grid connection'''
 
| '''Grid connection'''
 
| '''[x/-]'''
 
| '''[x/-]'''
| &nbsp;
+
|  
 
| -
 
| -
 
| -
 
| -
 
| -
 
| -
| nowrap="nowrap" width="20%" | - (there is a hybrid system with PV&nbsp;panels)
+
| style="white-space: nowrapwidth: 20%" | - (there is a hybrid system with PV panels)
| &nbsp;
+
|  
 
| -
 
| -
 
| -
 
| -
 
| -
 
| -
| &nbsp;
+
|  
| &nbsp;
+
|  
 
| -
 
| -
 
| -
 
| -
Line 1,418: Line 1,424:
 
| x
 
| x
 
| x
 
| x
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
| -
 
| -
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
|-
 
|-
| rowspan="4" nowrap="nowrap" width="7%" | '''Initial investment costs<br/>[Indicate currency quoted<br/>in the purchase contract]'''
+
| style="white-space: nowrap;  width: 7%" rowspan="4" | '''Initial investment costs<br/>[Indicate currency quoted<br/>in the purchase contract]'''
 
| '''Turbine'''
 
| '''Turbine'''
| &nbsp;
+
|  
| &nbsp;
+
|  
 
| 2 x 66585 USD
 
| 2 x 66585 USD
 
| 287 870 004 Ar
 
| 287 870 004 Ar
| &nbsp;
+
|  
| &nbsp;
+
|  
 
| 12000000 Ar
 
| 12000000 Ar
| &nbsp;5050000 Ar
+
| 5050000 Ar
| nowrap="nowrap" width="10%" | 5080000
+
| style="white-space: nowrapwidth: 10%" | 5080000
 
| rowspan="2" | 60 000 USD
 
| rowspan="2" | 60 000 USD
 
| 18000000 Ar
 
| 18000000 Ar
| &nbsp;
+
|  
 
| rowspan="2" | 5400046144 FMG
 
| rowspan="2" | 5400046144 FMG
 
| rowspan="3" | 1200000 Franc (french in 1982)
 
| rowspan="3" | 1200000 Franc (french in 1982)
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
|-
 
|-
 
| '''Generator'''
 
| '''Generator'''
| &nbsp;
+
|  
| &nbsp;
+
|  
 
| 2 x 28050 USD
 
| 2 x 28050 USD
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
| 5000000 Ar
 
| 5000000 Ar
 
| 2100000 Ar
 
| 2100000 Ar
 
| 2100000 Ar
 
| 2100000 Ar
| 2500000 Ar&nbsp;
+
| 2500000 Ar
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
|-
 
|-
 
| '''Penstock'''
 
| '''Penstock'''
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
| 28 000 000 Ar
 
| 28 000 000 Ar
| &nbsp;
+
|  
| &nbsp;
+
|  
 
| 20240000 Ar
 
| 20240000 Ar
 
| 11040000 Ar
 
| 11040000 Ar
 
| 5060000 Ar
 
| 5060000 Ar
| &nbsp;
+
|  
 
| 35000000 Ar
 
| 35000000 Ar
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
|-
 
|-
 
| '''Exemption of VAT'''
 
| '''Exemption of VAT'''
 
| '''[x/-]'''
 
| '''[x/-]'''
| &nbsp;
+
|  
 
| -
 
| -
 
| -
 
| -
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
| - (but no import taxes)
 
| - (but no import taxes)
| &nbsp;
+
|  
| &nbsp;
+
|  
 
| -
 
| -
 
| x
 
| x
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
|-
 
|-
| colspan="2" | '''Remarks'''<br/>
+
| colspan="2" | '''Remarks'''
| &nbsp;
+
|  
| &nbsp;
+
|  
| considerations about&nbsp;distant control and diagnostic system, problems with emergency shut-off (demand peaks) (<ref name="eins">_</ref>)
+
| considerations about distant control and diagnostic system, problems with emergency shut-off (demand peaks) (<ref name="eins">_</ref>)
| installation&nbsp;by elec.&eau themselves, incidence due to a plank in the high pressure pipe
+
| installation by elec.&eau themselves, incidence due to a plank in the high pressure pipe
| &nbsp;
+
|  
| supply of a hospital, constant demand,&nbsp;supplementary adjustment not necessary&nbsp;(<ref name="zwei">_</ref>)
+
| supply of a hospital, constant demand, supplementary adjustment not necessary (<ref name="zwei">_</ref>)
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
| (<ref name="drei">_</ref>)
 
| (<ref name="drei">_</ref>)
| &nbsp;
+
|  
| &nbsp;
+
|  
 
| (<ref name="vier">_</ref>)
 
| (<ref name="vier">_</ref>)
 
| hybrid system for point demand and during the period of flooding,<br/>3 electromechanical groups were scheduled (<ref name="fünf">_</ref>)
 
| hybrid system for point demand and during the period of flooding,<br/>3 electromechanical groups were scheduled (<ref name="fünf">_</ref>)
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
| &nbsp;
+
|  
 
| [http://www.eib.europa.eu/projects/pipeline/2007/20070306.htm http://www.eib.europa.eu/projects/pipeline/2007/20070306.htm]
 
| [http://www.eib.europa.eu/projects/pipeline/2007/20070306.htm http://www.eib.europa.eu/projects/pipeline/2007/20070306.htm]
 
| [http://www.andritz.com/ANONID3E7C786C66706EFF/hydro-references-compact-hydro-mandraka http://www.andritz.com/ANONID3E7C786C66706EFF/hydro-references-compact-hydro-mandraka]
 
| [http://www.andritz.com/ANONID3E7C786C66706EFF/hydro-references-compact-hydro-mandraka http://www.andritz.com/ANONID3E7C786C66706EFF/hydro-references-compact-hydro-mandraka]
| &nbsp;
+
|  
| &nbsp;
+
|  
 
|}
 
|}
 +
<br/>
 +
 +
 +
= Further Information =
 +
 +
*[[Portal:Hydro|Hydro Portal on energypedia]]
 +
*[[Micro_Hydro_Power_-_Manufacturers_worldwide|Micro Hydro Power - Manufacturers worldwide]]
 +
*[[Micro_Hydro_Power_-_Organisations_worldwide|Micro Hydro Power - Organisations worldwide]]
  
  
  
 
= References<br/> =
 
= References<br/> =
 
 
<references />
 
<references />
  
 
[[Category:Hydro]]
 
[[Category:Hydro]]
 
[[Category:Research]]
 
[[Category:Research]]

Latest revision as of 11:59, 19 January 2015

Overview

Find here a detailed overview of micro hydro power manufacturers.

►Please add further manufacturers and set internal or external links

► For a better representation of the following tables it might be helpful to adjust your screen size to values slightly below 100%.

► An empty ready-to-print version of the following table (to be filled out on site) can be found here.



Manufacturer

Francais

Constructeur
MADAGASKAR ENTEC Indonesien IREM Italy IREM Italy IREM Italy Vitasoa AIDER AIDER Shao Yang Vitasoa AIDER JLA & Co. C.Dumont (n'existe plus) Hunan Lingling VA TECH (fr)
Site (locationi, région) Ankazomiriotra/ Andriatsemboka Mangamila (Anjozorobe)/ Antananarive Ranomafana Est (Brickaville)/ Toamasina Ampitafa Ranotsara Nord (Iakora)/ Fianaratsoa Anosibe Trimoloharano (Andramasina)/ Antananarive Ambohijoky/ Antananarive Ranomainty Ambosary gara Merikanjaka Antetezambato, Tsarasaotra, Ambositra Sahamadio- Fisakana Ankazobe/ Antananarive Tsiazompaniry Fianarantsoa Volobe/ Toamasine Sahanivotry Antelomita (pour Tana) Namorona (Fianarantsoa) Tsiazompaniry/Antananarive Manandray (Fianarantsoa) Vatomandry/ Toamasina Andekaleka (district Brickaville), pour Tana Mandraka (70 km de Tana), pour Tana Lily ?/Ampefy? /Antananarive Manandona/ Antanarivo
Opérateur (SME/NGO/Community) Power and Water (SME) Elec. & Eau (SME) Elec. & Eau (SME) ESF (NGO) Vitasoa Energy (SME) AIDER (SME) AIDER (SME) Sermad Vitasoa AIDER Coopérative ADITSARA JIRAFI JIRAMA JIRAMA JIRAMA JIRAMA JIRAMA JIRAMA JIRAMA JIRAMA JIRAMA JIRAMA JIRAMA JIRAMA
Source d'investissement 70 % ADER, 30 % fonds (propre et emprunt) 70% ADER, <30% Elec. & Eau, contribution commune: main d'oeuvre ADER, Elec. & Eau et commune 100% ESF ADER, Commune ADER - AIDER- Tany Meva - IME ADER - AIDER - Tany Meva - IME 70% ADER, 30% Sermad ADER, Vitasoa, Commune ADER , AIDER, Tany Meva 100% GEPF 90% fond europeen (FED), 5% etat madagscar, 5% ambassadeur canadien FNE (fonds nationale électricité) BEI (europe)
Mise en service 2009 2009 (juin) 2007 2008 2009 2009 2009 mai 2010 2010 2010 2000 1985 2009 2008 1952, rénouvellement 2008 nouveau bloc 2009 2004 2009

Equipement
Type de turbine Banki, T14- D300 Banki Pelton Banki Banki Banki Banki Francis Pelton Banki Banki Francis Francis Pelton (verticale, 4 jet, 2 rotor)
puissance [kW] 2 x 58 85 30 20 25 7,5 2 x 7,5 2x60 2x35 40 42 128 50 5300 6050 6760 5676 5000 5200 280 130 139 000 (2x 29 MW?) 4 x 6100 3600 20000
Rendement nominal 0,75 0,75 0,75 0,8 0,65 0,89
Autre equipement fourni par le constructeur couplage "Straub" pour la conduit forcée, génerateur synchrone de "meccalte"
(EU) (triphase, n=1500 tr/min, production de 80 kVA, 3x400V, PT100 pour
contrôler la température des paliers et du enroelement) armoire électrique,
installation et mise en marche
flasque pour la conduite, turbine INOX F14/2, génrateur synchrone
AZ100 (triphase, n= 1500 tr/min, fournit électr. tri- et monophasé),
régulateur électrique, amoire électrique CT100.000, pièces de rechrage
flasque pour la conduite, génrateur synchrone AZ100 (triphase,
n= 1500 tr/min, fournit électr. tri- et monophasé), régulateur électrique,
amoire électrique, pièces de recharge
flasque pour la conduite, turbine, génrateur synchrone,
amoire électrique, pièces de recharge
alternateur (30 kVA) de la marque Euro Power, 50Hz,
1500tr/min, monophasé
équipement électrique acheté sur l
e marché malgache
équipement électrique acheté
sur le marché malgache
turbine, génerateur synchrone (triphasé,
160 kVA, cos φ= 0,8), régulateru de vitesse, armoire électrique
équipement électrique acheté sur le marché
malgache, générateur triphasé 35 kVA
turbine, alternateur triphasé, système de
régulation, coupleur, contrôle et commande
turbine, génerateur, armoire électrique
et installation
turbine, génerateur synchrone (triphasé,
160 kVA, cos φ= 0,8), régulateru de vitesse, armoire électrique
Réhabilitation avec
l'université d'Antsiranana
endommagé, ne
fontionne pas
la centrale hydroélectrique la plus grande de Madagaskar (diamètre rotot = 1 m; 600 tr/min; 2 rotor par arbre
génerateur synchrone, soupape d'admission, équipement
électrique, contrôle et protection
Lily pas encore en exploitation, Ampefy endommagé
Multiplicateur multiplicateur à courroie plate multiplicatuer à courroie dentée direct multiplicatuer à courroie dentée multipli-cateur par courroie multiplicateur à courroie multiplicateur à courroie direct, avec volant d'intertie multiplicateur à courroie multiplicateur à courroie direct, avec volant d'intertie
Régulation de turbine DTC- Vario ( Saia-Burgess- Suisse) combiné avec régulateuer de charge (systéme hydraulique TA-31 pour régler la vanne distributrice) avec ballst variable (40 kW) pour démarrage, manomètre pour contrôler le niveau de bief d'amont, PT100 pour contrôler la températur des paliers régulateur électronique avec ballast variable (10kW) de dissipation en eau RMP10000/B, régulation de débit manuel avec vanne générale régulateur électronique avec ballast variable de dissipation en eau, régulation de débit manuel avec vanne générale régulateur électrique avec ballast variable, régulation de débit manuel pour démarrage avec vanne générale régulation par absorption régulation électrique avec ballast variable régulation électrique avec ballast variable régulation des aubes manuelle pour une plage des débit, régulateur automatique (hydraulique) qui ajuste le débit d'eau pour maintenir la vitesse (n=1000tr/min= constant) pour la demande variée régulation par absorption régulation électrique avec ballast variable et régulateur hydraulique régulateur automatique qui régule la vanne distributrice et ajuste le débit d'eau pour maintenir la vitesse (n=1000tr/min= constant) pour la demande variée régulatuer de vitesse
Longeur du canal d'amené [m] 271 140 1044 630 510 135
Conduite forcée (matérial, longeur, diamètre) [-/m/mm] acier/ 42/ 600 acier/~35/400 PVC/167/160 PVC//250 PVC/27/250 PVC/18/200 PVC/6/320 acier/170/630 acier/80/250 acier/70/ DN250 acier/>12/ 800 acier/300/800
Production locale de la conduite forcée [x/-] x non (production francaise) x non (production francaise) x x x x x x
Maintenance vidage du système hydraulique aprés 2-3 ans contrôle des grilles/ filtres, injecteur, courroie; lubrifaction pendant l'opération;
tout le 3 moins hors service pour 1 journée: nettoyage canal d'amené
contrôle des grilles/ filtres, injecteur, courroie; lubrifaction
pendant l'opération; tout le moins nettoyage de la conduite forcée des algues
le collaborateur chinois qui est employé à Madagascar s'occupe de la maintenace technique ouverture de la turbine une fois par an, après
la crue nettoyage de la canal d'amenée
tous le lundi martin hors service pour l'entretien, problèmes avec la surtension qui endommage le régulateur de tension d'alternateur
et l'arbre qui ne supporte pas le grand moment pendant un changement de charge rapide (3 fois en 25 ans de service)
Période de garantie [yrs] 1 2 2 2 10 10 10 10 25

Spécification du site
Hauteur de chute nette [m] 20,3 15 ~75 35 20 10 5 53 52 17 12 42 210 234
Débit d'équipement [m³/s] 2x 0,442 0,8 min. 0,066 0,05-0,1 0,177 0,131 0,196 ≈ 0,68 0,06 0,545 0,25
Facteur d'utilisation[1] [full load h/ h per yr] 1 1 <1 1 0,5 0,3 0,3 0,4 0,77 (h de fonctionnement/h per year)
Durée d'immobilisation à cause de la pénurie d'eau [days] 0 0 quelque jours pendant oct./nov. 0 4h/jr pendant la pénurie 2 moins presque 0 30 0
Connexion au réseau existant [x/-] - - - - (il existe un système hybride avec les panneau photo- voltaik) - - - - - - - x x -
Coûts d' investissement
initials
[monnaie du
contract d'achet]
Turbine 2 x 66585 USD 287 870 004 Ar 12000000 Ar 5050000 Ar 5080000 60 000 USD 18000000 Ar 5400046144 FMG 1200000 Franc (francais en 1982)
Génerateur 2 x 28050 USD 5000000 Ar 2100000 Ar 2100000 Ar 2500000 Ar
Conduite forcée 28 000 000 Ar 20240000 Ar 11040000 Ar 5060000 Ar 35000000 Ar
Exonération de T.V.A. [x/-] - - - (mais pas de tax d'im-porta-tion) - x
Remarques système de contrôle et diagnostique à distance envisager, problème d'arrêt d'urgence (piques de demande) ([2]) installation par elec.&eau même, incident à cause d'une plache dans la conduite forcée alimentation d'un hospitale, demande constante, réglage suplementaire pas necessaire ([3]) ([4]) ([5]) système hybride pour les demande point et pendant la periode de pénurie d'eau, 3 groupe électro- méc. étaient prevu ([6]) http://www.eib.europa.eu/projects/pipeline/2007/20070306.htm http://www.andritz.com/ANONID3E7C786C66706EFF/hydro-references-compact-hydro-mandraka


English

Turbine manufacturer MADAGASKAR ENTEC Indonesien IREM Italy IREM Italy IREM Italy Vitasoa AIDER AIDER Shao Yang Vitasoa AIDER JLA & Co. C.Dumont (n'existe plus) Hunan Lingling VA TECH (fr)
Project site (place, region) Ankazomiriotra/ Andriatsemboka Mangamila (Anjozorobe)/ Antananarivo Ranomafana Est (Brickaville)/ Toamasina Ampitafa Ranotsara Nord (Iakora)/ Fianaratsoa Anosibe Trimoloharano (Andramasina)/ Antananarivo Ambohijoky/ Antananarivo Ranomainty Ambosary gara Merikanjaka Antetezambato, Tsarasaotra, Ambositra Sahamadio- Fisakana Ankazobe/ Antananarive Tsiazompaniry Fianarantsoa Volobe/ Toamasine Sahanivotry Antelomita (for Tana) Namorona (Fianarantsoa) Tsiazompaniry/Antananarive Manandray (Fianarantsoa) Vatomandry/ Toamasina Andekaleka (district Brickaville), for Tana Mandraka (70 km de Tana), for Tana Lily ?/Ampefy? /Antananarive Manandona/ Antanarivo
Operator (SME/NGO/Community) Power and Water (SME) Elec. & Eau (SME) Elec. & Eau (SME) ESF (NGO) Vitasoa Energy (SME) AIDER (SME) AIDER (SME) Sermad Vitasoa AIDER Coopérative ADITSARA JIRAFI JIRAMA JIRAMA JIRAMA JIRAMA JIRAMA JIRAMA JIRAMA JIRAMA JIRAMA JIRAMA JIRAMA JIRAMA
Financing institution 70 % ADER, 30 % fund (own contribution and credit) 70% ADER, <30% Elec. & Eau, community contribution: workforce ADER, Elec. & Eau and community 100% ESF ADER, Community ADER - AIDER- Tany Meva - IME ADER - AIDER - Tany Meva - IME 70% ADER, 30% Sermad ADER, Vitasoa, Community ADER , AIDER, Tany Meva 100% GEPF 90% european fund (FED), 5% etat Madagscar, 5% canadian embassy FNE (national electrification fund) BEI (europe)
Commissioning 2009 2009 (June) 2007 2008 2009 2009 2009 May 2010 2010 2010 2000 1985 2009 2008 1952, renewal 2008 new bloc 2009 2004 2009

Equipment
Turbine type Banki, T14- D300 Banki Pelton Banki Banki Banki Banki Francis Pelton Banki Banki Francis Francis Pelton (vertical, 4 jet, 2 rotor)
Capacity [kW] 2 x 58 85 30 20 25 7,5 2 x 7,5 2x60 2x35 40 42 128 50 5300 6050 6760 5676 5000 5200 280 130 139 000 (2x 29 MW?) 4 x 6100 3600 20000
Nominal efficiency 0,75 0,75 0,75 0,8 0,65 0,89
Other equipment delivered by the manufacturer "Straub" coupling for the high pressure pipe, synchronized generator by "Mecc Alte" (EU)
three-phase, n=1500 rpm, production of 80 kVA, 3x400V, PT100 to control temperature of
bearings and coil of wire), electric control cabinet, installation and initial operation
flange for plumbing, turbine INOX F14/2, synchronized generator
AZ100 (three-phase, n= 1500 rpm, fournit électr. three- and mono-phase),
electrical controller, electric control cabinet CT100.000, charging station
flange for plumbing, synchronized generator AZ100 (three-phase,
n= 1500 rpm, fournit électr. three- and mono-phase), electrical
controller, electric control cabinet, charging station
flange for plumbing, turbine, synchronized generator,
electric control cabinet, charging station
alternator (30 kVA) Euro Power, 50Hz,
1500 rpm, mono-phase
electrical equipment bought
at the madagascan market
electrical equipment bought
at the madagascan market
turbine, synchronized generator (three-phase,
160 kVA, cos φ= 0,8), speed governor, electric
control cabinet
electrical equipment bought
at the madagascan market,
three-phased generator 35 kVA
turbine, three-phased alternator, regulation system,
circuit breaker, control and command
turbine, generator, electric control cabinet
and installation
turbine, synchronized generator (three-phased,
160 kVA, cos φ= 0,8), speed governor, electric control cabinet
renovation together with the university of Antsiranana damaged, does not work anymore the biggest hydroelectric control centre in Madagascar (rotor diameter = 1 m; 600 rpm; 2 rotors each arbor
synchronized generator, admission valve, electrical equipment, control and protection
Lily no longer operating, Ampefy damaged
'Speed 'increaser multiplicator to flat belt multiplicator to gear belt direct multiplicator to gear belt multiplicator to belt multiplicator to belt multiplicator to belt direct, with balance wheel multiplicator to belt multiplicator to belt direct, with balance wheel
Turbine control DTC- Vario ( Saia-Burgess-Suisse) combined with charge regulator (hydraulic system TA-31 to control the guide vane) with variable ballast (40 kW) for start-up, manometer for controlling the level of headwater, PT100 for controlling the temperature of bearings electrical controller with variable (10kW) dissipation loss in water RMP10000/B, manual regulation of discharge with general guide vane electrical controller with variable dissipation loss in water, manual regulation of discharge with general guide vane electrical controller with variable dissipation loss, manual regulation of discharge with general guide vane regulation by absorption electric regulation with variable ballast electric regulation with variable ballast regulation of manual paddles for a range of discharge, automatic regulator
(hydraulic) that adjusts the discharge of water to maintain velocity
(n=1000rpm= constant) for a varying demand
regulation by absorption electric regulation with variable ballast and hydraulic regulation automatic regulator that regulates the distribution valve and adjusts the discharge
of water to maintain velocity (n=1000rpm= constant) for a varying demand
speed governor
Length head-race channel [m] 271 140 1044 630 510 135
Penstock (material, length, diameter) [-/m/mm] steel/ 42/ 600 steel/~35/400 PVC/167/160 PVC//250 PVC/27/250 PVC/18/200 PVC/6/320 steel/170/630 steel/80/250 steel/70/ DN250 steel/>12/ 800 steel/300/800
Local production of penstock [x/-] x no (french production) x no (french production) x x x x x x
Maintenance draining of the hydraulic system every 2-3 years control of fence/filtres,injection valve, belt; lubrication while operation;every
three months switching-off for one day:cleaning of intake canal
control of fence/filtres, injection valve, belt; lubrication while operation;
every month cleaning of the high pressure pipe from algae
the chinese partner in Madagascar is in charge of the technical
maintenace
notch of the turbine once a year, after flooding
cleaning of the head race canal
every monday morning switching-off due to maintenance, problems with capacity overload that damages
the voltage controller of the alternator and the arbor that does not endure the moments during quick charge changing (3 times in 25 years of service)
Warrenty period [yrs] 1 2 2 2 10 10 10 10 25

Side specification
Net head [m] 20,3 15 ~75 35 20 10 5 53 52 17 12 42 210 234
Design flow [m³/s] 2x 0,442 0,8 min. 0,066 0,05-0,1 0,177 0,131 0,196 ≈ 0,68 0,06 0,545 0,25
Utilisation factor[1] [full load h/ h per yr] 1 1 <1 1 0,5 0,3 0,3 0,4 0,77 (h of work/h per year)
Off time due to water shortage [days] 0 0 a few day in October/November 0 4h/day during shortages 2 months close to 0 30 0
Grid connection [x/-] - - - - (there is a hybrid system with PV panels) - - - - - - - x x -
Initial investment costs
[Indicate currency quoted
in the purchase contract]
Turbine 2 x 66585 USD 287 870 004 Ar 12000000 Ar 5050000 Ar 5080000 60 000 USD 18000000 Ar 5400046144 FMG 1200000 Franc (french in 1982)
Generator 2 x 28050 USD 5000000 Ar 2100000 Ar 2100000 Ar 2500000 Ar
Penstock 28 000 000 Ar 20240000 Ar 11040000 Ar 5060000 Ar 35000000 Ar
Exemption of VAT [x/-] - - - (but no import taxes) - x
Remarks considerations about distant control and diagnostic system, problems with emergency shut-off (demand peaks) ([2]) installation by elec.&eau themselves, incidence due to a plank in the high pressure pipe supply of a hospital, constant demand, supplementary adjustment not necessary ([3]) ([4]) ([5]) hybrid system for point demand and during the period of flooding,
3 electromechanical groups were scheduled ([6])
http://www.eib.europa.eu/projects/pipeline/2007/20070306.htm http://www.andritz.com/ANONID3E7C786C66706EFF/hydro-references-compact-hydro-mandraka



Further Information


References

  1. 1.0 1.1 Please do not consider off-times due to regular maintenance / sans considération des périodes d'immobilisation à cause de la maintenance Cite error: Invalid <ref> tag; name "null" defined multiple times with different content
  2. 2.0 2.1 fonctionnement: problème avec l'arrêt d'urgence (2 fois par jour de 2 à 15 minutes): à cause de démarrage des moteur (triphasé) sans montage en étoile- triangle qui provoquent un courant énorme (effet comme court-circuit U vers 0, I vers ∞), cela produit un pique de demande (P vers ∞) pour un instant qui ne peut pas être compenser par la centrale rapidement ( P↑ conduit à n↓) et les fusibles effectue l'arrêt d'urgence, en plus: le transmission par le réseau et le temps de réaction de système de réglage ralenti l'adaptation, il faudra mieux le montage en triangle- étoile ou un système électrique (réglage électrique) amélioré dans la centrale qui est très cher; constructeur ENTEC: le service d'ENTEC est super mais aussi cher, au début pour gagner d'expérience mais prochainement la turbine directement de Heysa Indonésie est préféré sans service d'ENTEC, on transfère les dates de fonctionnement périodiquement, un système d'opération, contrôle et diagnostique à distance est envisagé dans 5 ans peut- être, maintenant il y a des problèmes de début, pas encore fonctionnement routinier Cite error: Invalid <ref> tag; name "eins" defined multiple times with different content
  3. 3.0 3.1 opérateur: ESF (électricité Sans Frontières: electriciens-sans-frontieres.org) est une association française (ONG) qui était fondé par salariés d'EDF, ils sont aussi engagés dans la domaine solaire, photovoltaik et éolienne partout à Madagascar et dans le monde, par l'aide de la France et Europe; projet social: projet à Ampitafa: aide au développement de Akamasoa (projet d'aide fondé par Pater Pedro, aussi à Tana, www.perepedro.com), qui ont aussi 3 centres de formation professionnelle (aussi mécanique général) qui sont connecté avec les ouvrage technique de l'association pour informes les jeunes et les recruter Cite error: Invalid <ref> tag; name "zwei" defined multiple times with different content
  4. 4.0 4.1 constructeur: sont choisi un constructeur chinois parce' que la durée de fabrication chez Ossberger p.e. est trop longue: 18 mois; la production en Chine ou Indonésie dure seulement 6 mois; conduite forcée: une conduite en PVC était prévu mais on a installé une conduite en acier production locale parce que c'est moins cher (tuyaux PVC diamètre supérieur à 250 mm importé) et plus pratique à l'air libre (pas d'intégration et moins risque d'érosion du terrain Cite error: Invalid <ref> tag; name "drei" defined multiple times with different content
  5. 5.0 5.1 production: maintenant (avril 2010) production entre 18 et 39 kW (24h/24h) pour l'alimentation de 180 ménages et 3 stations productives Cite error: Invalid <ref> tag; name "vier" defined multiple times with different content
  6. 6.0 6.1 coté technique: l'arbre devant l'accouplement était 3 fois cassé pendant les 25 ans de fonctionnement à cause de la variation de charge très forte, cela à causé des grandes entretiens; coté technique: problèmes avec le régulateur de tension d'alternateur à cause de la surtension Cite error: Invalid <ref> tag; name "fünf" defined multiple times with different content