Difference between revisions of "Lom Pangar Hydropower Project - Economic and Financial Analysis"
From energypedia
***** (***** | *****) (Created page with "{{RE Toolkit Database |RET title=Lom Pangar Hydropower Project - Economic and Financial Analysis |RET organization=World Bank |RET year=2012 |RET Country=Cameroon |RET languag...") |
***** (***** | *****) m |
||
(9 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | Economic and Financial Analysis | + | {{Project Resource Center |
+ | |REPRC title=Lom Pangar Hydropower Project - Economic and Financial Analysis | ||
+ | |REPRC organization=World Bank | ||
+ | |REPRC year=2012 | ||
+ | |REPRC Region Africa=Africa | ||
+ | |REPRC Country in Africa=Cameroon | ||
+ | |REPRC language=English | ||
+ | |REPRC file ar= | ||
+ | |REPRC file cn= | ||
+ | |REPRC file en=Cameroon Lom Pangar Hydropower Project E&FA.pdf | ||
+ | |REPRC file fr= | ||
+ | |REPRC file pr= | ||
+ | |REPRC file ru= | ||
+ | |REPRC file sp= | ||
+ | |REPRC file other= | ||
+ | |REPRC type general=Project Financing | ||
+ | |REPRC type financing=Examples of Economic & Financial Analysis | ||
+ | |REPRC type other= | ||
+ | |REPRC technology hydro=Hydro | ||
+ | |REPRC abstract=The project development objective is to increase hydropower generation capacity and reduce seasonal variability of water flow in the Sanaga River and to increase access to electricity. The document includes an example of economic and financial analysis: The economic analysis deals with demand forecast, demand scenarios and sensitivities to parameters; The financial analysis deals with the financial viability of the Lom Pangar dam and of the Lom Pangar power plant and with the financial situation of AES-SONEL and of the Electricity Development Corporation (EDC). | ||
}} | }} | ||
+ | |||
+ | [[Category:Hydro]] | ||
+ | [[Category:Large_Hydro]] | ||
+ | [[Category:Cameroon]] | ||
+ | [[Category:Financing_and_Funding]] | ||
+ | [[Category:REPRC_Project_Financing]] | ||
+ | [[Category:Project_Resource_Center]] |
Latest revision as of 18:33, 25 March 2014
Lom Pangar Hydropower Project - Economic and Financial Analysis
Title of Document | Lom Pangar Hydropower Project - Economic and Financial Analysis |
Abstract | The project development objective is to increase hydropower generation capacity and reduce seasonal variability of water flow in the Sanaga River and to increase access to electricity. The document includes an example of economic and financial analysis: The economic analysis deals with demand forecast, demand scenarios and sensitivities to parameters; The financial analysis deals with the financial viability of the Lom Pangar dam and of the Lom Pangar power plant and with the financial situation of AES-SONEL and of the Electricity Development Corporation (EDC). |
File Download | |
Original Source | World Bank |
Year | 2012 |
Region/Country | Africa - Cameroon |
Language(s) | English |
Document Type | Project Financing- Examples of Economic & Financial Analysis |
Technology | Hydro |