Difference between revisions of "Turbines in Private Sector Participation (PSP) Hydro Rwanda"
From energypedia
***** (***** | *****) m |
***** (***** | *****) |
||
Line 7: | Line 7: | ||
{| width="95%" cellspacing="0" cellpadding="0" border="1" | {| width="95%" cellspacing="0" cellpadding="0" border="1" | ||
|- | |- | ||
− | | | + | | width="15%" height="37" rowspan="2" | Project site |
| width="20" rowspan="2" | project developer<br> | | width="20" rowspan="2" | project developer<br> | ||
| width="80" | capazity | | width="80" | capazity | ||
Line 15: | Line 15: | ||
| | | | ||
|- | |- | ||
− | | | + | | width="154" height="51" | Murunda |
| width="128" | REPRO | | width="128" | REPRO | ||
− | | width="80" | | + | | width="80" | 96 |
| width="80" | generator: Ossberger (new) | | width="80" | generator: Ossberger (new) | ||
turbine: Ossberger (old) | turbine: Ossberger (old) | ||
|- | |- | ||
− | | | + | | width="154" height="17" | Masimeru and Maruruma |
| width="128" | ENNY | | width="128" | ENNY | ||
| width="80" | 250 | | width="80" | 250 | ||
Line 29: | Line 29: | ||
|- | |- | ||
− | | | + | | width="154" height="51" | Musarara |
| width="128" | SOGEMR | | width="128" | SOGEMR | ||
| width="80" | 438 | | width="80" | 438 | ||
Line 37: | Line 37: | ||
|} | |} | ||
− | <br><br> | + | <br><br> |
− | [[Category:Hydro]] | + | [[Category:Hydro]] [[Category:Rwanda]] |
− | [[Category:Rwanda]] |
Revision as of 14:16, 20 September 2010
Three hydro sites are currently under development in the EnDev project PSP Hydro in Rwanda. Here is some date about the turbines and generators that will be installed in the projects:
Project site | project developer |
capazity | Turbine Manufacturer |
[kW] | |||
Murunda | REPRO | 96 | generator: Ossberger (new)
turbine: Ossberger (old) |
Masimeru and Maruruma | ENNY | 250 |
generator + turbine Kochendörfer (new) |
Musarara | SOGEMR | 438 |