Difference between revisions of "Turbines in Private Sector Participation (PSP) Hydro Rwanda"

From energypedia
***** (***** | *****)
m
***** (***** | *****)
Line 7: Line 7:
 
{| width="95%" cellspacing="0" cellpadding="0" border="1"
 
{| width="95%" cellspacing="0" cellpadding="0" border="1"
 
|-
 
|-
| height="37" width="15%" rowspan="2" | Project site  
+
| width="15%" height="37" rowspan="2" | Project site  
 
| width="20" rowspan="2" | project developer<br>  
 
| width="20" rowspan="2" | project developer<br>  
 
| width="80" | capazity  
 
| width="80" | capazity  
Line 15: Line 15:
 
| &nbsp;
 
| &nbsp;
 
|-
 
|-
| height="51" width="154" | Murunda  
+
| width="154" height="51" | Murunda  
 
| width="128" | REPRO  
 
| width="128" | REPRO  
| width="80" | 105
+
| width="80" | 96
 
| width="80" | generator: Ossberger (new)  
 
| width="80" | generator: Ossberger (new)  
 
turbine: Ossberger (old)  
 
turbine: Ossberger (old)  
  
 
|-
 
|-
| height="17" width="154" | Masimeru and Maruruma  
+
| width="154" height="17" | Masimeru and Maruruma  
 
| width="128" | ENNY  
 
| width="128" | ENNY  
 
| width="80" | 250  
 
| width="80" | 250  
Line 29: Line 29:
  
 
|-
 
|-
| height="51" width="154" | Musarara  
+
| width="154" height="51" | Musarara  
 
| width="128" | SOGEMR  
 
| width="128" | SOGEMR  
 
| width="80" | 438  
 
| width="80" | 438  
Line 37: Line 37:
 
|}
 
|}
  
<br><br>
+
<br><br>  
  
[[Category:Hydro]]
+
[[Category:Hydro]] [[Category:Rwanda]]
[[Category:Rwanda]]
 

Revision as of 14:16, 20 September 2010

Three hydro sites are currently under development in the EnDev project PSP Hydro in Rwanda. Here is some date about the turbines and generators that will be installed in the projects:



Project site project developer
capazity Turbine Manufacturer
[kW]  
Murunda REPRO 96 generator: Ossberger (new)

turbine: Ossberger (old)

Masimeru and Maruruma ENNY 250

generator + turbine Kochendörfer (new)

Musarara SOGEMR 438

generator + turbine Ossberger (new)