Difference between revisions of "Risks in Project Development"
From energypedia
***** (***** | *****) |
***** (***** | *****) |
||
Line 4: | Line 4: | ||
|ECA Topics=Other | |ECA Topics=Other | ||
|ECA Country=Worldwide | |ECA Country=Worldwide | ||
− | |ECA Answer= | + | |ECA Answer=Extensive list of risks organized in six sub-categories based on literature review and field experience in monitoring. With additional suggestions on how to minimize, mitigate or controll some of the riks during the life cycle of a project. |
− | |||
− | |||
− | |||
+ | Explanation on how to prioritize risks according to the dimensions of their probability to occur and their impact potential. | ||
+ | |||
+ | Example of activities that can be carried out during a projects’ preparation as guidance on how to be aware of risks. | ||
+ | |||
+ | List of experiences applying de-risking approaches for rural electrification projects (mini-grids and hydro), as well as further reading about risks management for renewable energy systems. | ||
}} | }} | ||
{{ECA Links | {{ECA Links | ||
|ECA Answer Link=https://energypedia.info/wiki/Risks_in_Energy_Access_Projects | |ECA Answer Link=https://energypedia.info/wiki/Risks_in_Energy_Access_Projects | ||
}} | }} |
Latest revision as of 09:45, 19 May 2017
Title: | Risks in Project Development |
Questions in detail: | What types of risks are involved implementing an energy access project? |
Topics: | Other |
Country: | Worldwide |
Answer: |
Extensive list of risks organized in six sub-categories based on literature review and field experience in monitoring. With additional suggestions on how to minimize, mitigate or controll some of the riks during the life cycle of a project. Explanation on how to prioritize risks according to the dimensions of their probability to occur and their impact potential. Example of activities that can be carried out during a projects’ preparation as guidance on how to be aware of risks. List of experiences applying de-risking approaches for rural electrification projects (mini-grids and hydro), as well as further reading about risks management for renewable energy systems. |