Difference between revisions of "Thermo-technical retrofitting of public buildings 2"

From energypedia
***** (***** | *****)
(Created page with "{{Biogas Project Database |BSP Project Name=Thermo-technical retrofitting of public buildings |BSP Project Desc=Within the project 'Energy efficiency in the grid-connected ene...")
 
***** (***** | *****)
Line 1: Line 1:
 
{{Biogas Project Database
 
{{Biogas Project Database
|BSP Project Name=Thermo-technical retrofitting of public buildings
+
|BSP Project Name=Thermo-technical retrofitting of a health center
 
|BSP Project Desc=Within the project 'Energy efficiency in the grid-connected energy supply' implemented by GIZ on behalf of the German federal Ministry for Economic Cooperation and Development (BMZ) and Swiss Development Cooperation (SDC) sixteen (16) have been retrofitted. This one of these buildings.
 
|BSP Project Desc=Within the project 'Energy efficiency in the grid-connected energy supply' implemented by GIZ on behalf of the German federal Ministry for Economic Cooperation and Development (BMZ) and Swiss Development Cooperation (SDC) sixteen (16) have been retrofitted. This one of these buildings.
|BSP Project Status=Planned
+
|BSP Project Budget=174,100,000.00 MNT
 +
|BSP Project Status=Completed
 +
|BSP Project Start=01.07.2015
 +
|BSP Project Type=other
 +
|BSP Project End=07.09.2015
 +
|BSP Project Picture=Khovd Duut.png
 
|BSP Province=46.862496, 103.846656
 
|BSP Province=46.862496, 103.846656
 +
|BSP Tag Building=Building improvement
 +
|BSP Tag Efficient=Efficient use of resources
 
}}
 
}}
 +
 +
==== Building data and geometry<br/> ====
 +
 +
*Construction year: 1975<br/>
 +
*Cross volume: 3,276.8 m³<br/>
 +
*Thermal envelope: 1,730.3 m²<br/>
 +
*Net volume: 2,835 m³<br/>
 +
*Net floor area: 799.3 m²<br/>
 +
 +
==== Implemented measures:<br/> ====
 +
 +
*Roof insulation with 20cm EPS- hard foam and waterproofing<br/>
 +
*Wall insulation with 15cm EPS- hard foam<br/>
 +
*New windows with 5-chamber plastic frame and double glazing<br/>
 +
*New exterior doors<br/>
 +
*Rehabilitation of the heating system<br/>
 +
*Contracting company: Tulgat bagana LLC<br/>
 +
 +
==== Energy consumption<br/> ====
 +
 +
*Before: 522 kWh/(m2 a) {calculated}<br/>
 +
*After: 140 kWh /(m2 a) {metred}<br/>
 +
*Energy saving per year: 305,332 kWh<br/>
 +
*Coal equivalent saving: 75,020 kg / 75 t<br/>
 +
*CO<sub>2</sub> emission savings per year: 206 t CO<sub>2 </sub>{Estimated}

Revision as of 06:37, 23 November 2017

► Back to the Main Page

Key Project Data

Name
Thermo-technical retrofitting of a health center
Description
Within the project 'Energy efficiency in the grid-connected energy supply' implemented by GIZ on behalf of the German federal Ministry for Economic Cooperation and Development (BMZ) and Swiss Development Cooperation (SDC) sixteen (16) have been retrofitted. This one of these buildings.
Project No.
Total Budget
174,100,000.00 MNT
Status
Icon Completed.png Completed
Timeframe
01.07.2015 - 07.09.2015
Type
other
Project Picture
Click to download picture

Location in Mongolia

Province
' {{#display_point: coordinates=46.862496, 103.846656|zoom=4|height=150|width=250|service=openlayers}}

Further Information

Website
Factsheet
Organization

Tagging

Publications

Currently, there are no publications related to this project.

Events

Currently, there are no events organized by this project.

Additional Comments



Building data and geometry

  • Construction year: 1975
  • Cross volume: 3,276.8 m³
  • Thermal envelope: 1,730.3 m²
  • Net volume: 2,835 m³
  • Net floor area: 799.3 m²

Implemented measures:

  • Roof insulation with 20cm EPS- hard foam and waterproofing
  • Wall insulation with 15cm EPS- hard foam
  • New windows with 5-chamber plastic frame and double glazing
  • New exterior doors
  • Rehabilitation of the heating system
  • Contracting company: Tulgat bagana LLC

Energy consumption

  • Before: 522 kWh/(m2 a) {calculated}
  • After: 140 kWh /(m2 a) {metred}
  • Energy saving per year: 305,332 kWh
  • Coal equivalent saving: 75,020 kg / 75 t
  • CO2 emission savings per year: 206 t CO2 {Estimated}