Difference between revisions of "Impact Monitoring Guidelines"
From energypedia
***** (***** | *****) m |
***** (***** | *****) m |
||
Line 17: | Line 17: | ||
= Preparation = | = Preparation = | ||
− | {| cellspacing="0" cellpadding="0 | + | {| width="95%" cellspacing="0" cellpadding="0" border="1" |
|- | |- | ||
− | | bgcolor="#0000ff" | <span style="color: rgb(255,255,255)">'''Tasks''' </span> | + | | bgcolor="#0000ff" | <span style="color: rgb(255,255,255)">'''Tasks''' </span> |
− | | bgcolor="#0000ff" | <span style="color: rgb(255,255,255)">'''Materials/ Support''' </span> | + | | bgcolor="#0000ff" | <span style="color: rgb(255,255,255)">'''Materials/ Support''' </span> |
| bgcolor="#0000ff" | <span style="color: rgb(255,255,255)">'''Library''' </span> | | bgcolor="#0000ff" | <span style="color: rgb(255,255,255)">'''Library''' </span> | ||
|- | |- | ||
Line 28: | Line 28: | ||
*Sample Terms for enumerators | *Sample Terms for enumerators | ||
− | | ToR Consultants:<br> | + | | ToR Consultants:<br> |
− | *[ | + | *[[:file:Example_rwi_baseline_for_repro_tor_is_2008-11-18.pdf|Tor Baseline Study (Rwanda PSP Hydro) ]] |
− | *[ | + | *[[:file:Example_terms_survey_french.pdf|ToR Survey french version]] |
− | *[ | + | *[[:file:Example_terms_of_reference_local_expert_18122007.doc|ToR Evaluation english version]] |
*[[Library Further Documents|Further Documents]] | *[[Library Further Documents|Further Documents]] | ||
Line 58: | Line 58: | ||
Rural Electrifciation: | Rural Electrifciation: | ||
− | *[ | + | *[[:file:Example_result_chains_de.pdf|Result Chain german version]] |
− | *[ | + | *[[:file:Example_result_chains_en.pdf|Result Chain engl. version]] |
− | *[ | + | *[[:file:Example_result_chains_fr.pdf|Result Chain french version]] |
− | Cooking:<br> | + | Cooking:<br> |
− | *[ | + | *[[:file:Impacts_-_observation_fields_and_indicators.doc|Energy Impacts, Observation Fields and Indicators]] |
− | *IA Kenya: [ | + | *IA Kenya: [[:file:Example_ics_results_chains_kenya.doc|Result Chain]] |
− | *IA Ethiopia: [ | + | *IA Ethiopia: [[:file:Results_chains_ethiopia.pdf|Result Chain]] |
− | *IA Kenya: [ | + | *IA Kenya: [[:file:Preparation_kenya_-_impacts,_observation_fields_and_indicators.pdf|Model List of Impacts, Observation Fields and Indicators]] |
|- | |- | ||
Line 82: | Line 82: | ||
[[Guidelines and materials for qualitative methods|PRA tools, Interview Guidelines, Observation criteria etc.]] | [[Guidelines and materials for qualitative methods|PRA tools, Interview Guidelines, Observation criteria etc.]] | ||
− | <br> | + | <br> |
− | ([[Impact Studies Material#General|Impact Studies Material]]) | + | ([[Impact Studies Material#General|Impact Studies Material]]) |
|- | |- | ||
Line 93: | Line 93: | ||
| | | | ||
− | *Kenya: [ | + | *Kenya: [[:file:Selection_criteria_v2.doc|Selection Criteria for HH, SI, PU and Producers IA]] |
− | *Kenya: [ | + | *Kenya: [[:file:Example_local_poverty_criteria_kenya.doc|Local Poverty criteria (example from local village authorities)]] |
|- | |- | ||
Line 103: | Line 103: | ||
| | | | ||
− | *Supervisors and Enumerators [ | + | *Supervisors and Enumerators [[:file:Modèle_recrutement_formation_enqueteurs.doc|Example Training Agenda]] (french version) |
− | *Kenya: [ | + | *Kenya: [[:file:Example_ics_training_of_enumerators_kenya.doc|ICS Training of Enumerators]] |
|} | |} | ||
− | <font size="2"></font> | + | <font size="2"></font> |
= Implementation = | = Implementation = |
Revision as of 11:29, 11 August 2011
Introduction
The Impacts Monitoring Group of Energising Development has developed recommendations for a "proper" impact assessments.
We recommend to:
- use the recommended list of indicators
- conduct baseline studies before project intervention and impact studies after households, social infrastructure or SMEs got access to a form of modern energy
- use a theory based approach by applying the result chain for developing the study design
- use a mixed methods approach: the logic of the comparative advantages of methods: that means the mix of quantitative (standarised household interviews) and qualitative methods (open/ semi-structured interviews with key persons and households or focus group discussions)
- to include control groups if possible (households which do not have acces to modern energy) into your baseline and impact study
The following tables shows typical steps for baseline and impact studies, which we would recommend and support.
Preparation
Tasks | Materials/ Support | Library |
Terms for Consultants/ Enumerators |
|
ToR Consultants: |
Selection Consultant/ Enumerators |
|
|
Study of available documents and statistics on national development goals and policies, national sector goals and policies, BMZ goals and concept for the partner country |
|
|
Developing of Results Chains/ Indicators |
Rural Electrifciation: Cooking:
| |
Developing of Questionnaires, interview guidelines, PRA tools (MAPP), observation criteria and other tools (catalogue of methods) |
PRA tools, Interview Guidelines, Observation criteria etc.
| |
Sampling/ Selection target Group |
|
|
Training of Supervisors and Enumerators/ Pretesting |
|
|
Implementation
Task | Materials/ Support | Library |
Logistics | Checklist on how to implement HH Interviews |
|
Conducting Interviews |
| |
Data entry |
Data Analysis/ Reporting
Task | Materials/ Support | Library |
Data analysis |
| |
Data interpretation – in exchange with the project team (in a workshop) |
|
|
Report writing |
|
|