Difference between revisions of "Hydropower Sites - GPS Coordinates"
***** (***** | *****) m |
***** (***** | *****) |
||
Line 1: | Line 1: | ||
= Map of hydropower sites: = | = Map of hydropower sites: = | ||
− | <googlemap | + | <googlemap zoom="3" lon="28.125" lat="0.35156" version="0.9"> |
-0.9794, 29.6194, MHP Bwindi 0°58'46"S 29°37'10"E | -0.9794, 29.6194, MHP Bwindi 0°58'46"S 29°37'10"E | ||
1.216944, 34.738889, MHP Suam 1°13'1"N 34°44'20"E | 1.216944, 34.738889, MHP Suam 1°13'1"N 34°44'20"E | ||
Line 14: | Line 14: | ||
+ | -1.915979, 29.401474, not exactly where the MHP Murunda is located | ||
+ | -2.4052, 29.2646, MHP Masimeru | ||
− | + | -18.577764, 47.861764, MHP Mangamila to Tsaratsaotra 18° 34‘ 39.95‘‘S 47° 51’42.35‘‘E | |
− | |||
− | |||
− | |||
− | |||
− | -18.577764, 47.861764, MHP Mangamila to Tsaratsaotra | ||
</googlemap> <br> | </googlemap> <br> |
Revision as of 08:11, 27 July 2011
Map of hydropower sites:
<googlemap zoom="3" lon="28.125" lat="0.35156" version="0.9"> -0.9794, 29.6194, MHP Bwindi 0°58'46"S 29°37'10"E 1.216944, 34.738889, MHP Suam 1°13'1"N 34°44'20"E 3.581111, 31.772917, MHP Fofo 3°34'52.5"N 31°46'22.5"E 3.663611, 31.800833, PHP Gwere 3°39'49"N 31°48'3"E
6.577778, 38.697306, MHP Gobecho I 6º34’40’’N 38º41’50.3’’ E 6.577778, 38.697222, MHP Gobecho II 6º34’39.7’’N 38º41’50’’E 6.557444, 38.669, MHP Ererte 6º33’26.8’’N 38º40’8.4’’ E 6.624056, 38.518139, MHP Hagara 6º37’26.6’’N 38º31’5.3’’ E 6.683333, 38.700133, SHP Yaye (planned) 6º41’00’’N 38º42’48’’ E
-1.915979, 29.401474, not exactly where the MHP Murunda is located
-2.4052, 29.2646, MHP Masimeru
-18.577764, 47.861764, MHP Mangamila to Tsaratsaotra 18° 34‘ 39.95‘‘S 47° 51’42.35‘‘E
</googlemap>
-2.4052, 29.2646, Masimeru, Powerhouse, 250kW, ENNY, expected to start opertion in March 2011 -2.410, 29.26, Masimeru, Forebay -2.3956, 29.2551, Masimeru, Intake
List of hydropower sites
NAME + COUNTRY | CAPACITY | YEAR | RIVER | DEVELOPER | OPERATOR | COMMENT |
Ethiopia |
||||||
Gobecho I | 7 kW | 2010 | Gange | EnDev |
Gobecho Genet Electric users cooperative/Community based cooperative society |
|
Gobecho II | 30 kW | 2011 | Gange | EnDev |
||
Ererte | 33 kW | 2011 | Ererte | EnDev |
Robot Electric Users Cooperative/community based cooperative society |
|
Hagara Sodicha | 55 kW | 2011 | Lalta | EnDev |
||
Yaye | 170 kW |
2002 - 2004, planned to rehabilitate | Irish Development Aid, Sidama Development Program, EnDev |
|||
Koka |
43.2 MW |
1960 |
EEPCo |
|||
Awash II |
32 MW |
1966 |
Awash |
EEPCo |
||
Awash III |
32 MW |
1971 |
Awash |
EEPCo |
||
Finach |
134 MW |
1973/2003 |
Blue Nil |
EEPCo |
||
Melka Wakena |
153 MW |
1988 |
EEPCo |
|||
Tis-Abay I |
11.4 MW |
1964 |
EEPCo |
|||
Tis-Abay II |
73 MW |
2001 |
EEPCo |
|||
Gilgel Gibe |
184 MW |
2004 |
Omo |
EEPCo |
||
Gilgel Gibe II |
420 MW |
2010 |
Omo |
EEPCo |
||
Tekeze |
300 MW |
2009 |
Tekeze |
EEPCo |
||
Beles |
460 MW |
2010 |
Blue Nil |
EEPCo |
||
Madagascar |
||||||
Mangamila |
(micro) |
In 2009 the grid extension of the MHP from Mangamila to Tsaratsaotra was financed and implemented by GTZ Madagascar | ||||
Mosambique |
||||||
Rwanda |
||||||
Musarara |
project: SOGEMR | |||||
Mazimeru |
250 kW |
2011 |
project: ENNY | |||
Murunda |
96 kW |
project: REPRO | ||||
Gasumo |
project: CALIMAX | |||||
Kavumu |
project: REGREPOWER | |||||
Mashyiga |
project: EPR,EGLISE | |||||
Uganda |
||||||
Bwindi |
(micro) |
|||||
Suam |
(micro) |
|||||
Fofo |
(micro) |
|||||
Gwere |
(pico) |
|||||
Ayungu |
(pico) |