Difference between revisions of "Mini Hydro Power Project Indonesia MHPP"

From energypedia
***** (***** | *****)
***** (***** | *****)
Line 3: Line 3:
 
<br> <br>  
 
<br> <br>  
  
Documents for download will be made available here soon. Until then please visit the [http://www.mhpp.org MHPP website].  
+
Documents from the [http://www.mhpp.org MHPP website] are available below.  
  
 
<br>  
 
<br>  
Line 10: Line 10:
 
|-
 
|-
 
| width="489" valign="top" |  
 
| width="489" valign="top" |  
Pre-Feasibility Study and Feasibility Study format  
+
'''Pre-Feasibility Study and Feasibility Study format'''
  
 
*<font size="2">[http://www.mhpp.org/docs/0607/Form%20A_General%20&%20SocioEconomic%20v1d.pdf Form A: General and Socio Economic Information, 578 kB]</font>  
 
*<font size="2">[http://www.mhpp.org/docs/0607/Form%20A_General%20&%20SocioEconomic%20v1d.pdf Form A: General and Socio Economic Information, 578 kB]</font>  
Line 20: Line 20:
 
*<font size="2">[http://www.mhpp.org/docs/0607/Form%20E%20v1d.pdf Form E: Consolidation and Evaluation of Field Data and Analyses, 179 kB]</font>
 
*<font size="2">[http://www.mhpp.org/docs/0607/Form%20E%20v1d.pdf Form E: Consolidation and Evaluation of Field Data and Analyses, 179 kB]</font>
  
Pre-Feasibility Study and Feasibility Study format Complete Document  
+
'''Pre-Feasibility Study and Feasibility Study format Complete Document'''
  
 
*<font size="2">[http://www.mhpp.org/docs/0607/Form-%28p%29FS-Complete.pdf Form (p) FS Complete, 1,848 kB]</font>
 
*<font size="2">[http://www.mhpp.org/docs/0607/Form-%28p%29FS-Complete.pdf Form (p) FS Complete, 1,848 kB]</font>
Line 44: Line 44:
 
&nbsp;  
 
&nbsp;  
  
<font size="2">Management</font>  
+
'''<font size="2">Management</font>'''
  
 
*<font size="2">Administration<br> [http://www.mhpp.org/docs/0607/Secretarial%20Administration_Principles%20Good%20Administration.ppt Secretarial Administration_Principles Good Administration.ppt; 60 kB]<br> [http://www.mhpp.org/docs/0607/Secretarial%20Administration_Common%20Practices.ppt Secretarial Administration_Common Practices; 72 kB]</font>
 
*<font size="2">Administration<br> [http://www.mhpp.org/docs/0607/Secretarial%20Administration_Principles%20Good%20Administration.ppt Secretarial Administration_Principles Good Administration.ppt; 60 kB]<br> [http://www.mhpp.org/docs/0607/Secretarial%20Administration_Common%20Practices.ppt Secretarial Administration_Common Practices; 72 kB]</font>
Line 57: Line 57:
  
 
<font size="2">[http://www.mhpp.org/docs/0607/Examples%20Compilation.pdf How To and Example; 119.5 kB]</font>  
 
<font size="2">[http://www.mhpp.org/docs/0607/Examples%20Compilation.pdf How To and Example; 119.5 kB]</font>  
 
&nbsp;
 
  
 
<font size="2">Evaluation</font>  
 
<font size="2">Evaluation</font>  

Revision as of 12:55, 9 January 2009

Mini Hydro Power Project (MHPP) is a cooperation project between the Directorate General or electricity and Energy Utilization within the Indonesian Ministry of Energy and Mineral Resources and German Technical Cooperation (GTZ) on behalf of German Government.



Documents from the MHPP website are available below.


Pre-Feasibility Study and Feasibility Study format

Pre-Feasibility Study and Feasibility Study format Complete Document

   


Training Package

Introduction, 450 kB

 

Electricity Utilization, 1,300 kB

Environment and MHP Scheme, 181 kB

 

Management

How To and Example; 119.5 kB

Evaluation

 

 

 

Institutional Preparation

Development of Standard Institution Setup, 580 kB


   

Posters


 


Publications

  • MHP Handbook (Initiating, Developing, Managing MHP Scheme) in Bahasa Indonesia (MHP_handbook_Indonesian.pdf, 2,045 kB)
  • MHP Handbook (Initiating, Developing, Managing MHP Scheme) in English (n/a yet)

 


 

Regulations

Presentation regarding Draft-version of PSK-TERSEBAR by Ditjen LPE in Bahasa Indonesia (PSKtersebar_01.pdf, 1,818 kB)

 

   

Miscellaneous