Difference between revisions of "Micro Hydro Power (MHP) - Ethiopia, Ererte"

From energypedia
***** (***** | *****)
m
***** (***** | *****)
m
Line 1: Line 1:
Overview =
+
 
 +
= Overview =
  
 
<u>Location of the site:</u>
 
<u>Location of the site:</u>
Line 30: Line 31:
 
'''Technical Specification:'''
 
'''Technical Specification:'''
 
*Canal: Lined stone masonry having a length of 53m
 
*Canal: Lined stone masonry having a length of 53m
*Penstock: Mild stell having a diameter of 400mm and a length of 42m/locally manufactured  
+
*Penstock: Mild stell having a diameter of 400mm and a length of 42m/locally manufactured
 
*Turbine: T-15 cross flow turbine /Manufactured locally
 
*Turbine: T-15 cross flow turbine /Manufactured locally
 
*Generator: MARELLI-Brushless Synchronous,1500 rpm, 42 kVA, 33.6 kW, 50 Hz, Efficiency - 89%, 380/440 V(adjustable), 3 phase series STAR
 
*Generator: MARELLI-Brushless Synchronous,1500 rpm, 42 kVA, 33.6 kW, 50 Hz, Efficiency - 89%, 380/440 V(adjustable), 3 phase series STAR
 
*Grid: Low Voltage distribution with ABC cable and Wooden pole (2.76 km)
 
*Grid: Low Voltage distribution with ABC cable and Wooden pole (2.76 km)
  
 
+
<br/>
  
 
= Pictures =
 
= Pictures =
  
{| cellspacing="1" cellpadding="1" border="0" style="width: 100%" class="FCK__ShowTableBorders"
+
{| cellspacing="1" cellpadding="1" border="0" class="FCK__ShowTableBorders" style="width: 100%"
 
|-
 
|-
 
| [[File:Ererti Fall.JPG|left|370px|Ererti Fall.JPG|alt=Ererti Fall.JPG]]
 
| [[File:Ererti Fall.JPG|left|370px|Ererti Fall.JPG|alt=Ererti Fall.JPG]]
Line 54: Line 55:
 
|}
 
|}
  
 
+
<br/>
  
 
= Further Information =
 
= Further Information =
Line 62: Line 63:
 
<references />
 
<references />
  
 +
[[Category:Ethiopia]]
 
[[Category:Hydro]]
 
[[Category:Hydro]]
[[Category:Ethiopia]]
 

Revision as of 15:02, 25 July 2013

Overview

Location of the site:

  • Country: Ethiopia
  • District: Bona
  • Kebele: Beshiro Gute
  • River: Ererte
  • GPS coordinate: 6º33’26.8’’N 38º40’8.4’’ E


Details

The MHP plant Ererte has a capacity of 33 kW and is planned to be inaugurated in September 2011. A total of approximately 200 households will be connected to the plant. The maximum number of potentially connectable households is 700.

Click here for more information.


Start of Construction: August 2009

Date of Commissioning:


Ownership: Robot Electric Users Cooperative/community based cooperative society

Tariff Structure: Flat rate/monthly based per appliance


Technical Specification:

  • Canal: Lined stone masonry having a length of 53m
  • Penstock: Mild stell having a diameter of 400mm and a length of 42m/locally manufactured
  • Turbine: T-15 cross flow turbine /Manufactured locally
  • Generator: MARELLI-Brushless Synchronous,1500 rpm, 42 kVA, 33.6 kW, 50 Hz, Efficiency - 89%, 380/440 V(adjustable), 3 phase series STAR
  • Grid: Low Voltage distribution with ABC cable and Wooden pole (2.76 km)


Pictures

Ererti Fall.JPG
Ererti MHP site.JPG
Ererte waterfall
Ererte MHP site
Ererti MHP weir ,Intake and canal.JPG
Locally Manufactured T-15 Turbine.JPG
Ererte intake and canal
Locally Manufactured T-15 Turbine


Further Information

References