Difference between revisions of "Preparation of Mini-Hydro Private Power Projects for Financial Closure"

From energypedia
***** (***** | *****)
***** (***** | *****)
Line 15: Line 15:
 
|PRC technology=Hydro
 
|PRC technology=Hydro
 
|PRC technology hydro=Small/Mini
 
|PRC technology hydro=Small/Mini
|PRC abstract=The TOR below describes tasks to be undertaken to bring at least 2 mini-hydro sub-projects, out of an initial long list of 20, to financial closure. The consultants will conduct the pre-feasibility studies on 10 candidates. The private developers will be responsible for doing the full feasibility studies on sub-projects that have successfully obtained letters of intent from the utility for power purchase.
+
|PRC abstract=The TOR describes tasks to be undertaken to bring at least 2 mini-hydro sub-projects, out of an initial long list of 20, to financial closure. The consultants will conduct the pre-feasibility studies on 10 candidates. The private developers will be responsible for doing the full feasibility studies on sub-projects that have successfully obtained letters of intent from the utility for power purchase.
 
}}
 
}}
  
 +
[[Category:Project_Resource_Center]]
 +
[[Category:PRC_Hydro]]
 
[[Category:Hydro]]
 
[[Category:Hydro]]
[[Category:PRC_Hydro]]
 
[[Category:Project_Resource_Center]]
 

Revision as of 16:40, 2 December 2013



Title of Document '
Abstract
File Download
Original Source
Year
Region/Country
Language(s)
Document Type
Technology
Connection Type