Difference between revisions of "Turbines in Private Sector Participation (PSP) Hydro Rwanda"
From energypedia
***** (***** | *****) m |
***** (***** | *****) m |
||
Line 4: | Line 4: | ||
[http://endev.info/content/Rwanda Private Sector Participation (PSP) in Micro-Hydro Power Supply for Rural Development, Rwanda (PSP Hydro)]<br/> | [http://endev.info/content/Rwanda Private Sector Participation (PSP) in Micro-Hydro Power Supply for Rural Development, Rwanda (PSP Hydro)]<br/> | ||
− | Concretely, PSP Hydro envisages supporting five private Rwandan Project Developers financially and with ongoing training. The intervention is realized under the umbrella of the Dutch-German Energy Partnership [[EnDev|Energising Development (EnDev).]]<br/> | + | Concretely, PSP Hydro envisages supporting five private Rwandan Project Developers financially and with ongoing training. The intervention is realized under the umbrella of the Dutch-German Energy Partnership [[Energising_Development_(EnDev)|Energising Development (EnDev).]]<br/> |
<br/> | <br/> | ||
Line 18: | Line 18: | ||
{| cellspacing="0" cellpadding="0" border="1" style="width: 100%" | {| cellspacing="0" cellpadding="0" border="1" style="width: 100%" | ||
|- | |- | ||
− | | | + | | style="width: 15%; height: 37px" rowspan="2" | '''Project site'''<br/> |
− | | | + | | style="width: 20px" rowspan="2" | '''project developer'''<br/> |
| style="width: 80px" | '''capazity''' | | style="width: 80px" | '''capazity''' | ||
| style="width: 80px" | '''Turbine Manufacturer''' | | style="width: 80px" | '''Turbine Manufacturer''' | ||
Line 52: | Line 52: | ||
= Further Information<br/> = | = Further Information<br/> = | ||
− | *[[:File: | + | *[[:File:Psp hydro rwanda baseline report - rwi2009.pdf|Psp hydro rwanda baseline report]]<br/> |
− | |||
+ | <br/> | ||
= References = | = References = | ||
Line 60: | Line 60: | ||
<references /> | <references /> | ||
+ | [[Category:Rwanda]] | ||
[[Category:Hydro]] | [[Category:Hydro]] | ||
− |
Revision as of 16:09, 7 August 2014
Overview
Concretely, PSP Hydro envisages supporting five private Rwandan Project Developers financially and with ongoing training. The intervention is realized under the umbrella of the Dutch-German Energy Partnership Energising Development (EnDev).
Hydro Sites in Rwanda
Three hydro sites are currently under development in the EnDev project PSP Hydro in Rwanda.
Here is some date about the turbines and generators that will be installed in the projects:
Project site |
project developer |
capazity | Turbine Manufacturer |
[kW] | |||
Murunda | REPRO | 96 | generator: Ossberger (new)
turbine: Ossberger (old) |
Masimeru and Maruruma | ENNy | 250 |
generator + turbine Kochendörfer (new) |
Musarara | SOGEMR | 438 |
generator + turbine Ossberger (new) |
Further Information