Difference between revisions of "Costs and Tariff Setting - Examples"
***** (***** | *****) m |
***** (***** | *****) m |
||
Line 15: | Line 15: | ||
== Tariff Setting == | == Tariff Setting == | ||
− | The end-users pay a connection fee in the beginning and a monthly fee for the electricity provided. A part of the costs for the indoor installations is pre-financed by the operator and has to be reimbursed by the end-user through a addition to the monthly payment | + | The end-users pay a connection fee in the beginning and a monthly fee for the electricity provided. A part of the costs for the indoor installations is pre-financed by the operator and has to be reimbursed by the end-user through a addition to the monthly payment within the first two or three years depending on the service level considered. |
<br> | <br> | ||
Line 37: | Line 37: | ||
| 10,000 | | 10,000 | ||
| 16,500 | | 16,500 | ||
− | | fix part: 16,000 | + | | fix part: 16,000 <br>variable part: 139 FCFA/kWh |
− | variable part: 139 FCFA/kWh | ||
|- | |- | ||
| Payment Period for the Indoor Installations | | Payment Period for the Indoor Installations | ||
Line 52: | Line 51: | ||
| fix part: 11,300 | | fix part: 11,300 | ||
variable part: 139 FCFA/kWh | variable part: 139 FCFA/kWh | ||
+ | |||
|} | |} | ||
Revision as of 11:39, 7 October 2009
Example: EnDev Senegal
Costs
Hybrid mini-grids would be cost-efficient without subsidies if the poorest segment of the population could pay 4,700 to 5,000 FCFA (7-8 EUR).
If the payment capacity is lower than that of the ‘optimal’ village, the supply should be limited to two or three, instead of four service levels, which better correspond to the group needs of the middle income segment. Fulfilling energy needs of the richest segment results in a considerable reduction of the profitability index.
If no investors are motivated to participate in the projects after these last considerations, then management lead by communal associations, which focus more on the benefits electrification, will reduce the amount of profit required and consequently the subsidies needed.
EnDev provides a subsidy of 70% of the initial investment costs. The operator and the rural commune contribute 20% to the initial investment, whereby the operator usually contributes 15% by providing services and logistics. The remaining 5% is covered by the commune mainly through treasury bills and the provision of manpower for the construction sites. The end-users pay 10% consisting of a connection fee and the reimbursment of pre-financed indoor installations.
Tariff Setting
The end-users pay a connection fee in the beginning and a monthly fee for the electricity provided. A part of the costs for the indoor installations is pre-financed by the operator and has to be reimbursed by the end-user through a addition to the monthly payment within the first two or three years depending on the service level considered.
Level 1 | Level 2 | Level 3 | Level 4 | |
Connection Fee | 20,000 | 37,500 | 65,000 | 100,000 |
Monthly Payment during the first Years | 6,100 | 10,000 | 16,500 | fix part: 16,000 variable part: 139 FCFA/kWh |
Payment Period for the Indoor Installations | 2 years | 2 years | 3 years | 3 years |
Monthly Payment after Payment for the Indoor Installations | 4,000 | 7,500 | 13,000 | fix part: 11,300
variable part: 139 FCFA/kWh |
⇒ Back to Solar Section