Difference between revisions of "Costs of Micro-Hydro Power Sites"

From energypedia
***** (***** | *****)
***** (***** | *****)
m (Reverted edits by Michel andre (*****) to last revision by *****)
 
Line 37: Line 37:
  
 
<br/>
 
<br/>
 
  
  
Line 43: Line 42:
  
 
*[[Portal:Hydro|Hydro Portal on energypedia]]<br/>
 
*[[Portal:Hydro|Hydro Portal on energypedia]]<br/>
*[http://www.microhydropower.net/download/mhpcosts.pdf Cost and Revenue Structures for Micro-Hydro Projects in Nepal]
+
*[[Micro-Hydro Power - Analysis of Costs|Micro-Hydro Power - Analysis of Costs]]<br/>
*[http://practicalaction.org/media/view/6537 ITDG Micro-Hydropower Plants - Estimation of Management Costs]
+
*[[Micro-Hydropower Plants - Estimation of Management Costs|Micro-Hydropower Plants - Estimation of Management Costs]]
 +
 
  
  

Latest revision as of 11:13, 30 September 2015

Overview

Micro-Hydro Power (MHP) projects come along with a big variety of costs. Planning and developing a site brings a number of country, probably regional specific costs. Similar to that are costs for operation and maintenance. All different cost categories play a role for individual projects, while big difference between countries due to different framework condition might occur. A clear cost analysis upfront is highly recommended.


Costs

Cost Factors are Eventually:

  • a locations feasibility check by respective personal
  • land/water ownership/usage
  • civil construction (canal, wear, intake, pipes, powerhouse)
  • electro-mechanical equipment (turbine, generator, load controller)
  • power grid (evtl. transformers, powerlines, house-cabeling, load limiters, meter installation, ...)
  • operation & maintenance (collecting tariffs, running and maintaining the assets)


Some remarks regarding costs:

  • Land & water requirements are mostly small. But there may be interference with existing schemes (irrigation) or legal issues to be considered.
  • Order to delivery of electro-mechanical equipment may take half a year. Ensure to order in time.
  • Costs for power lines and household connections often require a substantial amount from the overall budged.
  • Any mhp scheme supplying a group of households has to install fixed procedures to cover operation & maintenance.
  • This includes the collection of tariffs from each user.



Example: Micro-Hydro Power (MHP) Costs in Rwanda


-> Rwanda Energy Situation



Further Information


References