Difference between revisions of "PicoPV Test"

From energypedia
***** (***** | *****)
m
***** (***** | *****)
Line 31: Line 31:
 
<br>
 
<br>
  
Detailed test description can be inspected here:<br>[http://www.endev.info/index.php?option=com_docman&task=doc_download&gid=4&Itemid=13 Technical Test I (in german)]<br>
+
Detailed test description can be inspected here:<br>Technical Test I (in german)<br>
  
 
=== Technical Test II  ===
 
=== Technical Test II  ===
Line 71: Line 71:
 
<br>
 
<br>
  
Detailed test description can be inspected here:<br>[http://www.endev.info/index.php?option=com_docman&task=doc_download&gid=334 Technical Test II] (german)  
+
Detailed test description can be inspected here:<br>[http://www.energypedia.info/images/4/40/Testprotokoll_slt_level_2_10_rg_150908.pdf Technical Test II] (german)  
  
 
=== Field Test  ===
 
=== Field Test  ===
  
<span class="MsoPageNumber"><span style="font-size: 10pt; font-family: 'arial','sans-serif';">The publication is available in English and German.</span></span>  
+
<span class="MsoPageNumber"><span style="font-size: 10pt; font-family: 'arial','sans-serif'">The publication is available in English and German.</span></span>  
  
*[http://www.endev.info/index.php?option=com_docman&task=doc_download&gid=393 <span class="MsoPageNumber"><span style="font-size: 10pt; font-family: 'arial','sans-serif';">English version</span></span>]
+
*<span class="MsoPageNumber"><span style="font-size: 10pt; font-family: 'arial','sans-serif'">[http://www.energypedia.info/images/e/ed/Gtz_solar_lanterns_test.pdf English version]</span></span>  
*[http://www.endev.info/index.php?option=com_docman&task=doc_download&gid=394 <span class="MsoPageNumber"><span style="font-size: 10pt; font-family: 'arial','sans-serif';">German version</span></span><span class="MsoPageNumber"><span style="font-size: 10pt; font-family: 'arial','sans-serif';">&nbsp;</span></span>]
+
*<span class="MsoPageNumber"><span style="font-size: 10pt; font-family: 'arial','sans-serif'">[http://www.energypedia.info/images/d/d6/Gtz_solarleuchtentest.pdf German version]</span></span><span class="MsoPageNumber"><span style="font-size: 10pt; font-family: 'arial','sans-serif'">&nbsp;</span></span>
  
==== Additional Info ====
+
==== Additional Info ====
  
The SOLAR 2007-1 Lantern (Solarprojekt Freilassing e.V.)has been upgraded with new LEDs of 80 lm/W.
+
The SOLAR 2007-1 Lantern (Solarprojekt Freilassing e.V.)has been upgraded with new LEDs of 80 lm/W.  
  
 
[[Category:Solar]]
 
[[Category:Solar]]

Revision as of 09:41, 7 June 2010

Pico PV Systems

Currently engagement concerning Pico PV Systems increases. In order to advance the framework for project development in this field EnDev has effected various activities. One of these is a test series for Pico PV Systems. It is divided into three phases:


1. Technical Test I

2. Technical Test II

3. Field Tests


Technical Test I

The technical tests are performed by Fraunhofer Gesellschaft FhG/ISE in Freiburg, Germany. In the first test phase (2007/ 10 - 2008/ 01) eleven systems were tested on road capability with special focus on mechanical stability, lighting characteristics and operability. These systems were in detail:

  • GL9000SW, Global Marketing Technologies Inc. (US) --> overall picture bad
  • MS01, Macro-Solar Technology Co,. Ltd (China) --> overall picture very bad
  • Solar 2007-1, Solarprojekt-Freilassing e.v. (Germany) --> overall picture good
  • Mightylight, Cosmos Ignite Innovations (India) --> overall picture good
  • AISHWARYA, Noble energy Solar Technologies Ltd. (?) --> overall picture middle
  • Solar Home System, "Afghanistan" --> overall picture very bad
  • 2212SL Wuara, SolEnergy Africa (PTY) Ltd (South Africa) --> overall picture very bad
  • SOLUX-LED-100, SOLUX e.v. (Germany) --> overall picture middle
  • Sun x-set mobile, Würth Solergy (Germany) --> overall picture middle - bad
  • Glowstar GS7, Sollatek Ltd. (UK) --> overall picture middle
  • AS018, Astral Solar technology Co. (China) --> overall picture bad


Detailed test description can be inspected here:
Technical Test I (in german)

Technical Test II

Testkriterien Level 2

Solarmodul Werden die Nennwerte von Leistung, Leerlaufspannung und Kurzschlussstrom eingehalten?
Batterie Messung der Kapazität (NiMH+ Pb), Beständigkeit gegen Überladung (NiMH), einfacher Haltbarkeitstest (NiMH)
Lichtstrom Mittelwert über 210 Minuten
Brennzeit/autonome Zeit Leuchtdauer bis der Lichtstrom 70% des nach 15 min gemessenen Wertes erreicht hat (Start mit voll geladener Batterie)
Lichtausbeute Mittelwert über 210 min., Start mit voll geladener Batterie
Laderegler Spannungslevel Ladeschluss-/ Lastabwurfspannung, Eigenverbrauch, Signalisierungen, Schutz vor Entladung durch Modul, Wirkungsgrad
Vorschaltgerät Elektrischer Wirkungsgrad
Zyklentest bei CFL-Leuchten Test der Schaltfestigkeit der Leuchte mit dem Zyklus 60s an 150s aus
Simulation Ermittlung der solaren Deckungsrate für 5 Standorte bei einer Brenndauer von täglich 3,5 Stunden



Detailed test description can be inspected here:
Technical Test II (german)

Field Test

The publication is available in English and German.

Additional Info

The SOLAR 2007-1 Lantern (Solarprojekt Freilassing e.V.)has been upgraded with new LEDs of 80 lm/W.