Difference between revisions of "Thermo-technical retrofitting of public buildings"
From energypedia
***** (***** | *****) |
***** (***** | *****) |
||
Line 2: | Line 2: | ||
|BSP Project Name=Thermo-technical retrofitting of public buildings | |BSP Project Name=Thermo-technical retrofitting of public buildings | ||
|BSP Project Desc=Within the project 'Energy efficiency in the grid-connected energy supply' implemented by GIZ on behalf of the German federal Ministry for Economic Cooperation and Development (BMZ) and Swiss Development Cooperation (SDC) sixteen (16) have been retrofitted. This one of these buildings. | |BSP Project Desc=Within the project 'Energy efficiency in the grid-connected energy supply' implemented by GIZ on behalf of the German federal Ministry for Economic Cooperation and Development (BMZ) and Swiss Development Cooperation (SDC) sixteen (16) have been retrofitted. This one of these buildings. | ||
− | |BSP Project Budget=264 | + | |BSP Project Budget=264,563,214 MNT |
|BSP Project Status=Completed | |BSP Project Status=Completed | ||
|BSP Project Start=2014/07/22 | |BSP Project Start=2014/07/22 | ||
Line 16: | Line 16: | ||
<u>Building data and geometry</u><br/> | <u>Building data and geometry</u><br/> | ||
− | Construction year: 1975<br/> | + | *Construction year: 1975<br/> |
− | + | *Cross volume: 3,276.8 m³<br/> | |
− | Cross volume: | + | *Thermal envelope: 1,730.3 m²<br/> |
− | + | *Net volume: 2,835 m³<br/> | |
− | Thermal envelope: | + | *Net floor area: 799.3 m²<br/> |
− | |||
− | Net volume: | ||
− | |||
− | Net floor area: 799.3 m²<br/> | ||
<u>Implemented measures:</u><br/> | <u>Implemented measures:</u><br/> | ||
Line 31: | Line 27: | ||
*Wall insulation with 15cm EPS- hard foam<br/> | *Wall insulation with 15cm EPS- hard foam<br/> | ||
*New windows with 5-chamber plastic frame and double glazing<br/> | *New windows with 5-chamber plastic frame and double glazing<br/> | ||
− | *New exterior doors <br/> | + | *New exterior doors<br/> |
*Rehabilitation of the heating system<br/> | *Rehabilitation of the heating system<br/> | ||
Contracting company: Tulgat bagana LLC<br/> | Contracting company: Tulgat bagana LLC<br/> |
Revision as of 01:29, 15 November 2017
Key Project Data
Name
Thermo-technical retrofitting of public buildings
Description
Within the project 'Energy efficiency in the grid-connected energy supply' implemented by GIZ on behalf of the German federal Ministry for Economic Cooperation and Development (BMZ) and Swiss Development Cooperation (SDC) sixteen (16) have been retrofitted. This one of these buildings.
Project No.
Total Budget
264,563,214 MNT
Status
Completed
Timeframe
2014/07/22 - 2014/09/26
Type
other
Project Picture
No project picture uploaded.
Location in Mongolia
Province
Khovd {{#display_point: coordinates=48.001732, 91.635858|zoom=4|height=150|width=250|service=openlayers}}
Further Information
Website
Factsheet
Organization
GIZ
Tagging
Publications
Currently, there are no publications related to this project.
Events
Currently, there are no events organized by this project.
Additional Comments
Building data and geometry
- Construction year: 1975
- Cross volume: 3,276.8 m³
- Thermal envelope: 1,730.3 m²
- Net volume: 2,835 m³
- Net floor area: 799.3 m²
Implemented measures:
- Roof insulation with 20cm EPS- hard foam and waterproofing
- Wall insulation with 15cm EPS- hard foam
- New windows with 5-chamber plastic frame and double glazing
- New exterior doors
- Rehabilitation of the heating system
Contracting company: Tulgat bagana LLC