Difference between revisions of "Turbines in Private Sector Participation (PSP) Hydro Rwanda"

From energypedia
***** (***** | *****)
m
***** (***** | *****)
Line 4: Line 4:
  
 
<br/>Concretely, PSP Hydro envisages supporting five private Rwandan Project Developers financially and with ongoing training. The<br/>intervention is realized under the umbrella of the Dutch-German Energy Partnership '''Energising Development (EnDev)'''.
 
<br/>Concretely, PSP Hydro envisages supporting five private Rwandan Project Developers financially and with ongoing training. The<br/>intervention is realized under the umbrella of the Dutch-German Energy Partnership '''Energising Development (EnDev)'''.
 +
  
  
Line 13: Line 14:
 
<u>Here is some date about the turbines and generators that will be installed in the projects:</u>
 
<u>Here is some date about the turbines and generators that will be installed in the projects:</u>
  
{| style="width: 100%" cellpadding="0" cellspacing="0" border="1" width="95%"
+
{| style="width: 100%;" border="1" cellspacing="0" cellpadding="0"
 
|-
 
|-
| rowspan="2" height="37" width="15%" | '''Project site'''<br/>
+
| style="width: 15%; height: 37px;" rowspan="2" | '''Project site'''<br/>
| rowspan="2" width="20" | '''project developer'''<br/>
+
| style="width: 20px;" rowspan="2" | '''project developer'''<br/>
| width="80" | '''capazity'''
+
| style="width: 80px;" | '''capazity'''
| width="80" | '''Turbine Manufacturer'''
+
| style="width: 80px;" | '''Turbine Manufacturer'''
 
|-
 
|-
| height="17" | '''[kW]'''
+
| style="height: 17px;" | '''[kW]'''
| '''&nbsp;'''
+
|  
 
|-
 
|-
| height="51" width="154" | Murunda
+
| style="width: 154px; height: 51px;" | Murunda
| width="128" | REPRO
+
| style="width: 128px;" | REPRO
| width="80" | 96
+
| style="width: 80px;" | 96
| width="80" | generator: Ossberger (new)
+
| style="width: 80px;" | generator: Ossberger (new)
 
turbine: Ossberger (old)
 
turbine: Ossberger (old)
  
 
|-
 
|-
| height="17" width="154" | Masimeru and Maruruma
+
| style="width: 154px; height: 17px;" | Masimeru and Maruruma
| width="128" | ENNY
+
| style="width: 128px;" | ENNy
| width="80" | 250<br/>
+
| style="width: 80px;" | 250<br/>
| width="80" |  
+
| style="width: 80px;" |  
 
generator + turbine Kochendörfer (new)
 
generator + turbine Kochendörfer (new)
  
 
|-
 
|-
| height="51" width="154" | Musarara
+
| style="width: 154px; height: 51px;" | Musarara
| width="128" | SOGEMR
+
| style="width: 128px;" | SOGEMR
| width="80" | 438<br/>
+
| style="width: 80px;" | 438<br/>
| width="80" |  
+
| style="width: 80px;" |  
 
generator + turbine Ossberger (new)
 
generator + turbine Ossberger (new)
  
 
|}
 
|}
 
  
  

Revision as of 14:10, 9 April 2013

Overview

Private Sector Participation in Micro-Hydro Power Supply for Rural Development, Rwanda” (PSP Hydro)


Concretely, PSP Hydro envisages supporting five private Rwandan Project Developers financially and with ongoing training. The
intervention is realized under the umbrella of the Dutch-German Energy Partnership Energising Development (EnDev).



Hydro Sites in Rwanda

Three hydro sites are currently under development in the EnDev project PSP Hydro in Rwanda.

Here is some date about the turbines and generators that will be installed in the projects:

Project site
project developer
capazity Turbine Manufacturer
[kW]
Murunda REPRO 96 generator: Ossberger (new)

turbine: Ossberger (old)

Masimeru and Maruruma ENNy 250

generator + turbine Kochendörfer (new)

Musarara SOGEMR 438

generator + turbine Ossberger (new)


Further Information