Difference between revisions of "MHP El Plan"

From energypedia
***** (***** | *****)
(Created page with "<div><br/></div><div>= Overview<br/> =</div><div><br/></div><div>'''<u>Location of the site:</u>'''</div><div>*<u>Country</u>: Germany</div><div>...")
 
***** (***** | *****)
Line 1: Line 1:
<div><br/></div><div>= Overview&lt;br/&gt; =</div><div><br/></div><div>'''&lt;u&gt;Location of the site:&lt;/u&gt;'''</div><div>*&lt;u&gt;Country&lt;/u&gt;: Germany</div><div>*&lt;u&gt;District&lt;/u&gt;: &lt;span style="color: rgb(34, 34, 34); font-family: arial, sans-serif; font-size: small; line-height: 16px"&gt;Baden-Württemberg&lt;/span&gt;</div><div>*&lt;u&gt;River&lt;/u&gt;: Schanzbach</div><div>*&lt;u&gt;GPS Coordinates&lt;/u&gt;: 47&lt;span style="text-align: left"&gt;º55’40.5’’N 7º55’31.2’’E&lt;/span&gt;</div><div><br/></div><div>&lt;br/&gt;This pico pelton turbine is part of a hybrid system which supplies electricity to the Häusleberg Organic Farm. For more information please go to the project website: [https://sites.google.com/site/haeusleberg/ sites.google.com/site/haeusleberg/]</div><div><br/></div><div>&lt;br/&gt;</div><div><br/></div><div>= Further Information - Project&lt;br/&gt; =</div><div><br/></div><div>'''Start of Construction:''' December 2011&lt;br/&gt;'''Date of Commissioning:''' June 2012</div><div><br/></div><div><br/></div><div><br/></div><div>'''Ownership / Operation Model:''' Privately owned</div><div><br/></div><div>'''Tariff structure:''' Not applicable</div><div><br/></div><div>&lt;br/&gt;'''Turbine:''' Pelton</div><div><br/></div><div>'''Generator:''' Modified direct drive motor, 3 phase, 20 V, 150 W (approximately)</div><div><br/></div><div>{| class="FCK__ShowTableBorders" border="0" cellpadding="3" cellspacing="1" style="width: 100%;"</div><div>|-</div><div>| colspan="2" | </div><div>&#x5B;&#x5B;File:Haeusleberg farm.jpg|frame|center|A view over the Häusleberg organic farm&#x5D;&#x5D;</div><div><br/></div><div>|-</div><div>| colspan="2" | </div><div>&lt;br/&gt;</div><div><br/></div><div>|-</div><div>| &#x5B;&#x5B;File:Haeusleberg turbine 1.jpg|frame|center|Side view of the installed turbine atop the wooden framed drainage barrel.&#x5D;&#x5D;&lt;br/&gt;</div><div>| &#x5B;&#x5B;File:Haeusleberg turbine 2.jpg|frame|center|Top view of the installed turbine atop the wooden framed drainage barrel.&#x5D;&#x5D;&lt;br/&gt;</div><div>|-</div><div>| &lt;br/&gt;</div><div>| &lt;br/&gt;</div><div>|-</div><div>| &#x5B;&#x5B;File:Haeusleberg turbine 3.jpg|frame|center|The turbine from below showing the pelton runner at the nozzle mounting bracket.&#x5D;&#x5D;&lt;br/&gt;</div><div>| &#x5B;&#x5B;File:Haeusleberg turbine 4.jpg|frame|center|The stator of the direct drive motor during modifications for the 12 V hybrid system.&#x5D;&#x5D;&lt;br/&gt;</div><div>|-</div><div>| &lt;br/&gt;</div><div>| &lt;br/&gt;</div><div>|-</div><div>| &#x5B;&#x5B;File:Haeusleberg turbine 5.jpg|frame|center|Nozzle alignment test.&#x5D;&#x5D;&lt;br/&gt;</div><div>| </div><div>|-</div><div>| &lt;br/&gt;</div><div>| </div><div>|}</div><div><br/></div><div>&lt;br/&gt;</div><div><br/></div><div>= Further Information&lt;br/&gt; =</div><div><br/></div><div>*project website: [https://sites.google.com/site/haeusleberg/ sites.google.com/site/haeusleberg/]</div><div><br/></div><div>&lt;br/&gt;</div><div><br/></div><div>= References&lt;br/&gt; =</div><div><br/></div><div>&lt;references /&gt;</div><div><br/></div><div><br/></div><div><div><br/></div><div>
+
 
 +
 
 
'''Location of the site:'''
 
'''Location of the site:'''
 
*<u>Country</u>: text
 
*<u>Country</u>: text
Line 22: Line 23:
 
'''Generator: '''<br/>  
 
'''Generator: '''<br/>  
  
{| cellspacing="1" cellpadding="1" border="1" style="font-size: 13.600000381469727px; width: 772.7999877929688px;"
+
{| cellspacing="1" cellpadding="1" border="1" style="width: 100%;"
 
|-
 
|-
 
| add picture of MHP location
 
| add picture of MHP location
Line 38: Line 39:
  
 
''add respective country category''
 
''add respective country category''
</div></div>
 
<br/>
 

Revision as of 21:07, 26 March 2014


Location of the site:

  • Country: text
  • District: text
  • River: text
  • GPS Coordinates: text

add general comments such as number of connected HH in this segment


Start of construction:
Date of Commissioning:


Ownership / Operation Model:

Tariff structure:


Turbine:

Generator:

add picture of MHP location add picture of MHP location
add description of picture add description of picture
add picture of MHP location
add picture of MHP location
add description of picture add description of picture

add respective country category