Knowledge fuels change
For over a decade, Energypedia has shared free, reliable energy expertise with the world.
We’re now facing a serious funding gap.
Help keep this platform alive — your donation, big or small, truly matters!
Thank you for your support
Difference between revisions of "MHP Ocote Tuma"
From energypedia
***** (***** | *****) m |
***** (***** | *****) m |
||
| Line 1: | Line 1: | ||
| + | |||
= Overview<br/> = | = Overview<br/> = | ||
| Line 7: | Line 8: | ||
|- | |- | ||
| style="width: 194px" | <span style="line-height: 18px">Country:</span> | | style="width: 194px" | <span style="line-height: 18px">Country:</span> | ||
| − | | style="width: 390px" | <span style="line-height: 18px">Nicaragua (GPS Coordinates: ?)</span> | + | | style="width: 390px" | <span style="line-height: 18px">[[Nicaragua_Energy_Situation|Nicaragua]] (GPS Coordinates: ?)</span> |
|- | |- | ||
| style="width: 194px" | <span style="line-height: 18px">Turbine Type:</span> | | style="width: 194px" | <span style="line-height: 18px">Turbine Type:</span> | ||
| Line 271: | Line 272: | ||
|- | |- | ||
| [[File:OcoteTuma.JPG|thumb|right|300px|alt=OcoteTuma.JPG]]<br/><br/> | | [[File:OcoteTuma.JPG|thumb|right|300px|alt=OcoteTuma.JPG]]<br/><br/> | ||
| − | | [[File:OcoteTuma 2.JPG|thumb|300px|OcoteTuma ]] | + | | [[File:OcoteTuma 2.JPG|thumb|300px|OcoteTuma]] |
|- | |- | ||
| − | | [[File:OcoteTuma 3.JPG|thumb|300px|OcoteTuma ]] | + | | [[File:OcoteTuma 3.JPG|thumb|300px|OcoteTuma]] |
| − | | [[File:OcoteTuma 4.JPG|thumb|300px|OcoteTuma ]] | + | | [[File:OcoteTuma 4.JPG|thumb|300px|OcoteTuma]] |
|} | |} | ||
Latest revision as of 09:55, 17 July 2014
Overview
| Name of the site: | Ocote Tuma |
| Country: | Nicaragua (GPS Coordinates: ?) |
| Turbine Type: | Pelton |
| Power Output: | 30 kW |
| Project Status: | in operation |
| Comments: | - |
Operation Data
| Gross Head: | |
| Net/Design Head: | |
| Flow (design flow): | |
| Comments on flow variation during the year: |
Technical Information
| Comments: |
Civil Works and Penstock
| Dam construction material: | Concrete |
| Dam Dimensions: | - |
| Storage Volume Reservoir: | - |
| Sedimentation Basin material: | not available |
| Sedimentation Basin Dimensions: | |
| Penstock Length: | - |
| Penstock Diameter at Beginning: | 6" |
| Penstock Diameter at End: | 6" |
| Penstock Changes of Diameter: | 0 |
| Penstock Material: | PVC |
| Security Valve: | yes |
Electromechanical Equipment
Turbine
| Turbine Type: | Pelton, 1 injector |
| Turbine Diameter: | |
| Turbine Material: | Bronce |
| Turbine Manufacturer: | Nica Bosch (Contact: company does not exist any more) |
| Potencial (nominal): | |
| Rated Head: | |
| Rated Flow: | |
| Rated Speed: | |
| Runaway Speed: | |
| Shaft diameter and material: | |
| Direction of Rotation: | clockwise |
| Orientation of Shaft: | horizontal |
Generator:
| Generator Manufacturer and Model: | Stamford |
| Phases: | 3 |
| Potencial (nominal): | |
| Nominal voltage: | 120 / 240 V |
| Nominal Speed: | 1800 rpm |
| Frequency: | 60 Hz |
| Isolation Class: | H |
Mechanical Transmission / Coupling
| Type of Belt: | Abasic Plana |
| Belt Manufacturer: | Centro de Rodamientos |
| Distance between Pulleys: | |
| Diameter of Generator Pulley: | |
| Diameter of Generator Pulley: |
Control System
| Control System Manufacturer and Model: | No control system, manual flow control |
| Type of Control: | |
| Capacity: |
Electrical Transmission
| Mini Grid: | yes |
| Connection to national Grid: | no |
| Grid Voltage: | 240 / 120 V |
| Diameter of Conductor: | Triplex No.4 |
| Transformer Rating: |
Economic Information
| Developer: (Contact: ) | |
| Start of Construction: | |
| Date of Commissioning: | |
| Ownership / Operation Model: | |
| Operator: | |
| Tariff structure: | |
| Connected Housholds: | 55 |
| Connection Cost Cost to be covered by houshold: | |
| Overall Project Costs: |
Project Photos



















