Operative Aspects Implementation actual Lighting Measures EE-Lighting

From energypedia
Revision as of 07:30, 20 September 2016 by ***** (***** | *****) (1 revision)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

The implementation of actual lighting measures requires careful operative planning. Among others,

  • the expertise is required, e.g. to implement lighting and/or walk through audits;
  • time planning;
  • budget;
  • coordination with counterparts.


This part of the Service Package aims to compile helpful tools and tips for your operative planning, such as:


Timeschedule 03022011.JPG


References

Key Words
Description

Download


ToR
Lighting audit
Walk-through audit
Public buildings
Kosovo

The ToR describe related work tasks to implement lighting audits and walk-through-audits, each in three public buildings in Kosovo. An overview about the buildings is provided as well as a brief outline to the contents of a lighting audit and a walk-through-audit. ToR Lighting Audits.doc