Thermo-technical retrofitting of public buildings 2
From energypedia
Revision as of 06:37, 23 November 2017 by ***** (***** | *****)
Key Project Data
Name
Thermo-technical retrofitting of a health center
Description
Within the project 'Energy efficiency in the grid-connected energy supply' implemented by GIZ on behalf of the German federal Ministry for Economic Cooperation and Development (BMZ) and Swiss Development Cooperation (SDC) sixteen (16) have been retrofitted. This one of these buildings.
Project No.
Total Budget
174,100,000.00 MNT
Status
Completed
Timeframe
01.07.2015 - 07.09.2015
Type
other
Project Picture
Location in Mongolia
Province
' {{#display_point: coordinates=46.862496, 103.846656|zoom=4|height=150|width=250|service=openlayers}}
Further Information
Website
Factsheet
Organization
Tagging
Publications
Currently, there are no publications related to this project.
Events
Currently, there are no events organized by this project.
Additional Comments
Building data and geometry
- Construction year: 1975
- Cross volume: 3,276.8 m³
- Thermal envelope: 1,730.3 m²
- Net volume: 2,835 m³
- Net floor area: 799.3 m²
Implemented measures:
- Roof insulation with 20cm EPS- hard foam and waterproofing
- Wall insulation with 15cm EPS- hard foam
- New windows with 5-chamber plastic frame and double glazing
- New exterior doors
- Rehabilitation of the heating system
- Contracting company: Tulgat bagana LLC
Energy consumption
- Before: 522 kWh/(m2 a) {calculated}
- After: 140 kWh /(m2 a) {metred}
- Energy saving per year: 305,332 kWh
- Coal equivalent saving: 75,020 kg / 75 t
- CO2 emission savings per year: 206 t CO2 {Estimated}