MHP El Plan

From energypedia
Revision as of 20:17, 27 March 2014 by ***** (***** | *****)

Overview

Name of the site: El Plan
Country: Nicaragua (GPS Coordinates: ?)
Turbine Type: Pelton
Power Output: X kW
Project Status: in operation
Comments: -



Operation Data

Gross Head:
Net/Design Head:
Flow (design flow):
Comments on flow variation during the year:


General Technical Information

Comments: General Technical Comments on the Project


Civil Works and Penstock

Dam construction material:
Dam Dimensions:
Storage Volume Reservoir: ?
Sedimentation Basin material:
Sedimentation Basin Dimensions:
Penstock Length:
Penstock Diameter at Beginning: X
Penstock Diameter at End: X
Penstock Changes of Diameter:
Penstock Material: PVC
Security Valve:

Electromechanical Equipment

Turbine

Turbine Type: Pelton, x injectors
Turbine Diameter: Pelton, x injectors
Turbine Material: Pelton, x injectors
Turbine Manufacturer: (Contact:)
Potencial (nominal):
Rated Head:
Rated Flow:
Rated Speed: X
Runnaway Speed:
Shaft diameter and material:
Direction of Rotation:
Orientation of Shaft:

Generator:

Generator Manufacturer and Model:
Phases: 3
Potencial (nominal):
Nominal voltage:
Nominal Speed:
Frequency: X
Isolation Class:

Mechanical Transmission / Coupling

Type of Belt:
Belt Manufacturer: 3
Distance between Pulleys:
Diameter of Generator Pulley:
Diameter of Generator Pulley:

Control System

Control System Manufacturer and Model:
Type of Control: 3
Capacity:


Electrical Transmission

Mini Grid:
Connection to national Grid: 3
Grid Voltage:
Diameter of Conductor: 3
Transformer Rating:

Economic Information

Developer: (Contact: )
Operator: 3
Ownership / Operation Model:
Tariff structure: 3
Connected Housholds:
Costs:
Connection Cost Cost to be covered by houshold: 3
Connected Hounsholds:
Start of Construction: ?
Date of Commissioning: ?


Project Photos