Knowledge fuels change - Support energypedia!
For over 10 years, energypedia has been connecting energy experts around the world — helping them share knowledge, learn from each other, and accelerate the global energy transition.
Today, we ask for your support to keep this platform free and accessible to all. Even a small contribution makes a big difference! If just 10–20% of our 60,000+ monthly visitors donated the equivalent of a cup of coffee — €5 — Energypedia would be fully funded for a whole year.
Is the knowledge you’ve gained through Energypedia this year worth €5 or more?
Your donation keeps the platform running, helps us create new knowledge products, and contributes directly to achieving SDG 7.


Donate now and support open access to energy expertise

Thank you for your support, your donation, big or small, truly matters!

MHP El Plan

From energypedia
Revision as of 21:22, 27 March 2014 by ***** (***** | *****) (→‎Project Photos)

Overview

Name of the site: El Plan
Country: Nicaragua (GPS Coordinates: ?)
Turbine Type: Pelton
Power Output: 24 kW
Project Status: in operation
Comments: -




Operation Data

Gross Head: 200m
Net/Design Head: 200m
Flow (design flow): 20 l/s
Comments on flow variation during the year: Problems with flow during dry season.




Technical Information

Comments: General Technical Comments on the Project


Civil Works and Penstock

Dam construction material: Concrete
Dam Dimensions:
Storage Volume Reservoir:
Sedimentation Basin material: Concrete
Sedimentation Basin Dimensions:
Penstock Length:
Penstock Diameter at Beginning:
Penstock Diameter at End:
Penstock Changes of Diameter:
Penstock Material: PVC
Security Valve:

Electromechanical Equipment

Turbine

Turbine Type: Pelton, 1 injector
Turbine Diameter:
Turbine Material:
Turbine Manufacturer: Nica Bosch (Contact: company does not exist any more)
Potencial (nominal): 24 kW
Rated Head:
Rated Flow:
Rated Speed:
Runaway Speed:
Shaft diameter and material:
Direction of Rotation: clockwise
Orientation of Shaft: horizontal

Generator:

Generator Manufacturer and Model: Stamford
Phases: 3
Potencial (nominal):
Nominal voltage:
Nominal Speed:
Frequency: 60 Hz
Isolation Class:

Mechanical Transmission / Coupling

Type of Belt:
Belt Manufacturer:
Distance between Pulleys:
Diameter of Generator Pulley:
Diameter of Generator Pulley:

Control System

Control System Manufacturer and Model: Thomson and Howe Energy Systems, J2
Type of Control: Load Control
Capacity:


Electrical Transmission

Mini Grid: yes
Connection to national Grid: no
Grid Voltage:
Diameter of Conductor:
Transformer Rating:


Economic Information

Developer: (Contact: )
Start of Construction:
Date of Commissioning:
Ownership / Operation Model:
Operator:
Tariff structure:
Connected Housholds: 25
Connection Cost Cost to be covered by houshold:
Overall Project Costs:





Project Photos

ElPlan.JPG


Valve.JPG
Control System El Plan.JPG
Penstock El Plan.JPG
Turbine El Plan.JPG
Runner 2 El PLan.JPG
Dam el Plan.JPG