MHP El Plan
From energypedia
Revision as of 09:54, 17 July 2014 by ***** (***** | *****)
Overview
Name of the site: | El Plan |
Country: | Nicaragua (GPS Coordinates: 637682/1389321) |
Turbine Type: | Pelton |
Power Output: | 24 kW (5.7kW) |
Project Status: | in operation |
Comments: | - |
Operation Data
Gross Head: | 200m |
Net/Design Head: | 200m |
Flow (design flow): | 20 l/s |
Comments on flow variation during the year: | Problems with flow during dry season. |
Technical Information
Comments: | - |
Civil Works and Penstock
Dam construction material: | Concrete |
Dam Dimensions: | - |
Storage Volume Reservoir: | d=11m x 2m height |
Sedimentation Basin material: | Concrete |
Sedimentation Basin Dimensions: | - |
Penstock Length: | 1200m |
Penstock Diameter at Beginning: | 6" |
Penstock Diameter at End: | 3" |
Penstock Changes of Diameter: | 1 |
Penstock Material: | PVC |
Security Valve: | yes, 3" |
Electromechanical Equipment
Turbine
Turbine Type: | Pelton, 1 injector |
Turbine Diameter: | - |
Turbine Material: | Bronce |
Turbine Manufacturer: | Nica Bosch (Contact: company does not exist any more) |
Potencial (nominal): | 24 kW |
Rated Head: | 200m |
Rated Flow: | 20 l/s |
Rated Speed: | 1800 rpm |
Runaway Speed: | - |
Shaft diameter and material: | 38mm |
Direction of Rotation: | clockwise |
Orientation of Shaft: | horizontal |
Generator:
Generator Manufacturer and Model: | OGI, LLC |
Phases: | 3 |
Potencial (nominal): | 18kW |
Nominal voltage: | 240 / 120V |
Nominal Speed: | 1800 rpm |
Frequency: | 60 Hz |
Isolation Class: | H |
Mechanical Transmission / Coupling
Type of Coupling: | Direct Coupling |
Control System
Control System Manufacturer and Model: | Thomson and Howe Energy Systems, J2 |
Type of Control: | Load Control |
Capacity: | 12kW |
Electrical Transmission
Mini Grid: | yes |
Connection to national Grid: | no |
Grid Voltage: | 240 / 120 V |
Diameter of Conductor: | Triplex 2ASCR |
Transformer Rating: | not available |
Economic Information
Developer: (Contact: ) | |
Start of Construction: | |
Date of Commissioning: | |
Ownership / Operation Model: | |
Operator: | |
Tariff structure: | 50 Cordobas |
Connected Housholds: | 22 |
Connection Cost Cost to be covered by houshold: | |
Overall Project Costs: |
Project Photos