SPIS Toolbox - Set Up - Further Readings

From energypedia
Revision as of 12:03, 8 May 2017 by ***** (***** | *****)

Further Reading, Links and Tools

Links

“IRRIG8QUICK Irrigation Calibration Quick Test - Guidelines for Drip Micro Irrigation” by Page Blomer Associates (2009) at:

[1] (08/13/2015)

“Solar-Powered Irrigation Systems – Stocktaking and Analysis Report” by German Technical Cooperation Agency (GIZ) (2015)

Schultz and Suryani, 2015. EnDev2 Indonesia: Inspection Guide for Photovoltaic Village Power (PVVP) Systems. GIZ

 

SPIS tools

SET UP 01 – PV Acceptance Test: Guideline to compare the installed with the actual capacity of the pump

SET UP 02 – Workmanship Quality Checklist: Checklist for inspecting and verifying the workmanship quality

 

The following tools that are assigned to other Modules are also relevant:

PROMOTE 01- SPIS Rapid Assessment: on the analysis of the market for service provision

DESIGN 03- Pump Sizing Tool: to verify SPIS acceptance testing

MAINTAIN 03- Water application uniformity test: that should be implemented directly after setting up the system