Grid Extension vs Off grid, Island / Isolated System
From energypedia
Revision as of 07:16, 19 August 2010 by ***** (***** | *****) (Created page with '= Main decision criteria = *Distance to the national / centralised grid (incl. capacity of grid) *Demand #Population density #Long-term demand (in kwh and terms of energy servi...')
Main decision criteria
- Distance to the national / centralised grid (incl. capacity of grid)
- Demand
- Population density
- Long-term demand (in kwh and terms of energy services)
- Levelized costs of energy production in centralised grid and extension costs
- Levelized costs of energy production in isolated system
- ...
Important considaration
...